# US 2022/0035063 A1 · Engineering completion and selective fracturing of lateral wellbores

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0035063 A1
- Document ID: US20220035063A1
- Status: Published application
- Kind: A1
- Application number: 17/310,695
- Filed: 2020-02-18
- Published: 2022-02-03
- Earliest claimed: 2019-02-18
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Modhar Khan; Robert Utter; Irlan Amir; Dmitriy Potapenko; Joseph Gremillion
- Web page: https://patentgrep.com/patent/US20220035063A1

## CPC

- G01V 3/26: operating with magnetic or electric fields produced or modified either by the surrounding earth formation or by the detecting device (with electromagnetic waves G01V3/30)
- E21B 43/26: by forming crevices or fractures
- E21B 49/00: Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B 49/003: {by analysing drilling variables or conditions (E21B49/005 takes precedence; systems specially adapted for monitoring a plurality of drilling variables or conditions E21B44/00)}
- G01V 3/38: Processing data, e.g. for analysis, for interpretation, for correction
- Y02A 90/30: Assessment of water resources
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A method for completing a wellbore traversing a subterranean formation includes making electromagnetic resistivity measurements along a lateral section of the wellbore. The resistivity measurements are evaluated to estimate a water content of the subterranean formation along the lateral section. The formation is fractured at selected regions along the lateral section at which the water content is below a threshold and avoiding regions at which the water content is above the threshold.

## Claims

### Claim 1

A method for completing a wellbore traversing a subterranean formation, the method comprising:
(a) making electromagnetic resistivity measurements along a lateral section of the wellbore;
(b) evaluating the resistivity measurements to estimate a water content of the subterranean formation along the lateral section of the wellbore; and
(c) fracturing the formation at selected regions along the lateral section at which the water content is below a threshold and avoiding regions at which the water content is above the threshold.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
(a) further comprises drilling the lateral section of the wellbore; and
the resistivity measurements include logging while drilling measurements.

### Claim 3 (depends on 2)

The method of claim 2, wherein the resistivity measurements are made during a washdown operation.

### Claim 4 (depends on 1)

The method of claim 1, wherein the resistivity measurements comprise deep reading resistivity measurements.

### Claim 5 (depends on 1)

The method of claim 1, wherein the resistivity measurements have a depth of investigation of at least 10 feet into the formation.

### Claim 6 (depends on 1)

The method of claim 1, wherein (b) comprises evaluating the resistivity measurements to estimate at least one of (i) a resistivity of a near bed, (ii) a vertical resistivity and a horizontal resistivity of the near bed, (iii) a distance to a remote bed boundary, and (iv) a resistivity of a remote bed as a function of measured depth in the lateral section of the wellbore.

### Claim 7 (depends on 1)

The method of claim 1, wherein the water content is estimated in (b) from a resistivity value of the formation along the lateral section of the wellbore, with a higher resistivity being indicative of low water content and a lower resistivity being indicative of high water content.

### Claim 8 (depends on 1)

The method of claim 1, wherein (c) further comprises avoiding regions along the lateral section of the wellbore at which a resistivity of a near bed is less than a resistivity threshold indicative of high water content.

### Claim 9 (depends on 1)

The method of claim 1, wherein (c) further comprises avoiding regions along the lateral section of the wellbore at which a resistivity of a remote bed is less than a resistivity threshold indicative of high water content and at which a distance to the remote bed is less than a distance threshold.

### Claim 10 (depends on 1)

The method of claim 1, wherein (c) further comprises (i) cementing a casing in the lateral section of the wellbore, (ii) setting first and second packers to isolate one of the selected regions at which the water content is below the threshold, (iii) perforating the casing in the isolated region, and (iv) pumping high pressure fracking fluid downhole from the surface to fracture the subterranean formation in the isolated region.

### Claim 11 (depends on 10)

The method of claim 10, wherein (c) further comprises (v) setting packers at a plurality of other selected regions at which water content is below the threshold and repeating (iii) and (iv) at each of the selected regions.

### Claim 12

A method for completing a wellbore traversing a subterranean formation, the method comprising:
(a) drilling a lateral section of the wellbore;
(b) making logging while drilling electromagnetic resistivity measurements along the lateral section of the wellbore while drilling in (a);
(c) evaluating the logging while drilling resistivity measurements to estimate a water content of the subterranean formation along the lateral section of the wellbore;
(d) evaluating the water content to select locations along the lateral section of the wellbore for fracturing, said selected locations having a water content below a predetermined threshold;
(e) deploying a fracturing assembly in the lateral section of the wellbore at one of the locations selected in (d); and
(f) fracturing the formation at the one selected region.

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
(g) repeating (e) and (f) at an other one of the locations selected in (d).
