# US 2022/0034972 A1 · Test equipment and test method of battery management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0034972 A1
- Document ID: US20220034972A1
- Status: Published application
- Kind: A1
- Application number: 17/386,424
- Filed: 2021-07-27
- Published: 2022-02-03
- Earliest claimed: 2020-07-31
- Assignees: Industrial Technology Research Institute
- Applicants: Industrial Technology Research Institute
- Inventors: Yung-Chen WANG; Yen-Hsiang HUANG; Yi-Ling LIN; Yi-Lun CHENG; Jia-Wei HUANG
- Web page: https://patentgrep.com/patent/US20220034972A1

## CPC

- G05B 23/02: Electric testing or monitoring
- H02J 7/84: Control of state of health [SOH]
- G01R 31/3648: {comprising digital calculation means, e.g. for performing an algorithm}
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/374: with means for correcting the measurement for temperature or ageing
- G01R 31/382: Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R 31/3842: combining voltage and current measurements
- G01R 35/005: {Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references (G01R33/0035, G01R35/002 take precedence)}
- G01R 35/02: of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
- G05B 23/0256: {injecting test signals and analyzing monitored process response, e.g. injecting the test signal while interrupting the normal operation of the monitored system; superimposing the test signal onto a control signal during normal operation of the monitored system}
- H02J 7/40: characterised by the exchange of charge or discharge related data
- H02J 7/865: {Battery or charger load switching, e.g. concurrent charging and load supply (H02J7/50 takes precedence)}
- G01R 31/389: Measuring internal impedance, internal conductance or related variables
- Y02E 60/10: Energy storage using batteries
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Test equipment for a battery management system is provided. A battery-parameter recognition module measures a standard battery to obtain the first correction input, and uses the capacity test formula and the relaxation time test formula to perform a first charge and discharge test on the battery to be tested to obtain first battery parameter. A real-time simulation module determines the battery model and the simulated battery state based on the first battery parameter and the dynamic load. Each simulator of a physical signal simulation module provides a battery physical signal indicating the battery model. A connector provides the battery physical signal to the battery management controller under test. The battery management controller under test provides a stimulated battery state based on the battery physical signal. Master equipment compares the simulated battery state with an estimated battery state to determine whether the battery management controller under test is normal.

## Claims

### Claim 1

Test equipment of a battery management system, comprising:
a battery-parameter recognition module, measuring a standard battery to obtain a first correction input, and using a capacity test formula and a relaxation time test formula to perform a first charge and discharge test on a battery to be tested after calibrating a plurality of battery measuring devices using the first correction input, to obtain a first battery parameter of the battery to be tested;
a real-time simulation module, obtaining a battery model and a simulated battery state according to the first battery parameter and a dynamic load;
a physical signal simulation module, comprising a plurality of simulators, wherein each of the simulators is configured to provide a battery physical signal according to the battery model;
a connector coupled between the physical signal simulation module and a battery management controller under test, providing the battery physical signal to the battery management controller under test, wherein the battery management controller under test is configured to provide an estimated battery state of the battery to be tested according to the battery physical signal; and
master equipment, providing the dynamic load to the real-time simulation module, and comparing the simulated battery state with the estimated battery state to determine whether the battery management controller under test is normal.

### Claim 2 (depends on 1)

The test equipment of the battery management system as claimed in claim 1, further comprising:
an automatic sensing calibration module coupled to the connector, calibrating the battery management controller under test according to a control signal from the master equipment before the connector provides the battery physical signal to the battery management controller under test.

### Claim 3 (depends on 2)

The test equipment of the battery management system as claimed in claim 2, wherein the automatic sensing calibration module is configured to provide a second correction input with a fixed voltage, a fixed current, and a fixed temperature to the battery management controller under test through the connector, and the battery management controller under test is configured to provide a sensing result to the master equipment according to the second correction input.

### Claim 4 (depends on 3)

The test equipment of the battery management system as claimed in claim 3, wherein when an error value between a sensing value of the sensing result and the fixed voltage, the fixed current, or the fixed temperature exceeds a threshold value, a sensor of the battery management controller under test is adjusted until the error value is below the threshold value.

### Claim 5 (depends on 1)

The test equipment of the battery management system as claimed in claim 1, wherein the connector comprises:
a junction box coupled between the physical signal simulation module and the battery management controller under test; and
an error injector coupled between the junction box and the battery management controller under test, selectively injecting an error event into the battery management controller under test according to a control signal from the master equipment.

### Claim 6 (depends on 1)

The test equipment of the battery management system as claimed in claim 1, wherein after performing the first charge and discharge test on the battery to be tested by using the capacity test formula and the relaxation time test formula at different environment temperatures, the battery-parameter recognition module is configured to generate a pulse-charge test formula and a pulse-discharge test formula according to a test result of the first charge and discharge test.

### Claim 7 (depends on 6)

The test equipment of the battery management system as claimed in claim 6, wherein the battery-parameter recognition module is configured to perform a second charge and discharge test on the battery to be tested with the pulse-charge test formula and the pulse-discharge test formula at the different environment temperatures, and to generate the first battery parameter according to a test result of the second charge and discharge test.

### Claim 8 (depends on 7)

The test equipment of the battery management system as claimed in claim 7, wherein the battery-parameter recognition module is configured to perform an electrochemical impedance analysis on the battery to be tested, to obtain a fitted battery resistance-capacitance model, and further to generate the first battery parameter according to the fitted battery resistance-capacitance model.

### Claim 9 (depends on 1)

The test equipment of the battery management system as claimed in claim 1, wherein the battery measuring devices comprise a battery cell electrochemical impedance analyzer, a battery cell charging and discharging machine, a constant temperature and humidity tester or a battery cell temperature measuring device.

### Claim 10 (depends on 1)

The test equipment of the battery management system as claimed in claim 1, wherein the simulators comprise a communication simulator, a low-voltage power supply simulator, a battery pack insulation impedance simulator, a battery pack current simulator, a battery pack voltage simulator, a battery pack temperature simulator or a battery cell voltage simulator.

### Claim 11

A test method of a battery management system, comprising:
obtaining a battery management controller under test and a battery to be tested;
measuring a standard battery, to obtain a plurality of measurement parameters;
generating a plurality of test formulas when the measurement parameters match actual parameters of the standard battery;
performing a charge and discharge test on the battery to be tested according to each of the test formulas;
generating a first battery parameter corresponding to the battery to be tested according to result of the charge and discharge test;
generating a battery model according to the first battery parameter and a dynamic load corresponding to a test situation;
generating a plurality of physical signals to the battery management controller under test according to the battery model, so as to obtain an estimated battery state corresponding to the battery to be tested from the battery management controller under test; and
comparing a simulated battery state of the battery to be tested with the estimated battery state provided by the battery management controller under test, to obtain a test result.

### Claim 12 (depends on 11)

The test method of the battery management system as claimed in claim 11, wherein measuring the standard battery, to obtain the measurement parameters further comprises:
performing the charge and discharge test and an electrochemical impedance spectroscopy test on the standard battery, to obtain the measurement parameters,
wherein the measurement parameters comprise calculated capacity, calculated impedance, and electrochemical impedance spectrum fitting result of the standard battery.

### Claim 13 (depends on 11)

The test method of the battery management system as claimed in claim 11, wherein generating the test formulas when the measurement parameters match the actual parameters of the standard battery further comprises:
obtaining a second battery parameter of the battery to be tested;
generating a plurality of first test formulas according to the second battery parameter; and
performing a first charge and discharge test on the battery to be tested according to each of the first test formulas at different temperatures,
wherein the first test formulas comprise a capacity test formula and a relaxation time test formula.

### Claim 14 (depends on 13)

The test method of the battery management system as claimed in claim 13, wherein generating the test formulas when the measurement parameters match the actual parameters of the standard battery further comprises:
generating a plurality of second test formulas according to result of the first charge and discharge test; and
performing a second charge and discharge test on the battery to be tested according to each of the second test formulas at different temperatures,
wherein the second test formulas include a pulse-charge test formula and a pulse-discharge test formula.

### Claim 15 (depends on 14)

The test method of the battery management system as claimed in claim 14, wherein generating the first battery parameter corresponding to the battery to be tested according to the result of the charge and discharge test further comprises:
generating the first battery parameter according to the result of the second charge and discharge test and a resistance-capacitance model parameter.

### Claim 16 (depends on 11)

The test method of the battery management system as claimed in claim 11, further comprising:
performing a sensing calibration on the battery management controller under test.

### Claim 17 (depends on 16)

The test method of the battery management system as claimed in claim 16, wherein performing the sensing calibration on the battery management controller under test further comprises:
providing a plurality of second correction inputs with a fixed physical quantity to the battery management controller under test;
obtaining a measurement value of each of the second correction inputs measured by the battery management controller under test;
comparing the fixed physical quantity of each of the second correction inputs with the measurement value, to obtain an error value; and
adjusting at least one deviation value parameter of the battery management controller under test when the error value exceeds a threshold value.

### Claim 18 (depends on 17)

The test method of the battery management system as claimed in claim 17, wherein the fixed physical quantity includes a fixed voltage value, a fixed current value, and a fixed temperature value.

### Claim 19 (depends on 11)

The test method of the battery management system as claimed in claim 11, wherein generating the first battery parameter corresponding to the battery to be tested according to the result of the charge and discharge test further comprises:
performing an electrochemical impedance analysis on the battery to be tested, to obtain a resistance-capacitance model parameter; and
fitting the result of the charge and discharge test and the resistance-capacitance model parameter, to obtain the first battery parameter corresponding to the battery to be tested.

### Claim 20 (depends on 11)

The test method of the battery management system as claimed in claim 11, further comprising:
selectively injecting an error event into the battery physical signal.
