# US 2022/0034529 A1 · Humidifier for a fan coil

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0034529 A1
- Document ID: US20220034529A1
- Status: Published application
- Kind: A1
- Application number: 17/321,203
- Filed: 2021-05-14
- Published: 2022-02-03
- Earliest claimed: 2020-07-29
- Assignees: Omachron Intellectual Property Inc.
- Applicants: Omachron Intellectual Property Inc.
- Inventors: Wayne Ernest Conrad; Scott Card
- Web page: https://patentgrep.com/patent/US20220034529A1

## CPC

- F24F 6/02: by evaporation of water in the air
- F22B 37/565: {Blow-down control, e.g. for ascertaining proper duration of boiler blow-down}
- F24F 1/0087: with humidification means
- F24F 11/0008: {for air-humidification (F24F11/30 takes precedence)}
- F24H 15/246: Water level
- F24F 6/12: by forming water dispersions in the air
- F24F 11/80: for controlling the temperature of the supplied air
- F24F 2110/20: Humidity
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- F22B: METHODS OF STEAM GENERATION; STEAM BOILERS
- F24H: FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL (steam generation F22)

## Abstract

A method for operating a boiler of a humidification unit.

## Claims

### Claim 1

A method for operating a boiler of a humidification unit, the boiler initially filled to a first water level, the method comprising:
a) draining the boiler to substantially remove water from the boiler;
b) subsequently filing the boiler with water to a second water level, the second water level being greater than the first water level;
c) subsequently draining the boiler to substantially remove water from the boiler;
d) subsequently filing the boiler with water to the second water level;
e) subsequently draining the boiler to substantially remove water from the boiler; and,
f) subsequently filling the boiler with water to the first water level.

### Claim 2 (depends on 1)

The method of claim 1, further comprising, prior to draining and filing the boiler, detecting a trigger condition, wherein the boiler is drained and filled if the trigger condition is detected.

### Claim 3 (depends on 2)

The method of claim 2, wherein detecting the trigger condition comprises determining that the boiler has been inactive for a first inactive predetermined time period.

### Claim 4 (depends on 3)

The method of claim 3, wherein the first inactive predetermined time is between 18 and 48 hours.

### Claim 5 (depends on 3)

The method of claim 3, wherein the first inactive predetermined time is between 18 and 36 hours.

### Claim 6 (depends on 2)

The method of claim 2, wherein detecting the trigger condition comprises determining that the boiler has been active for a first active predetermined time period.

### Claim 7 (depends on 6)

The method of claim 6, wherein the first active predetermined time is over 15 minutes.

### Claim 8 (depends on 6)

The method of claim 6, wherein the first active predetermined time is over 30 minutes.

### Claim 9 (depends on 2)

The method of claim 2, wherein detecting the trigger condition comprises determining that the boiler has been inactive for a first inactive predetermined time period or the boiler has been active for a first active predetermined time period, whichever occurs first.

### Claim 10 (depends on 3)

The method of claim 3, further comprising:
a) subsequent to determining that the boiler has been inactive for a first inactive predetermined time period, determining that the boiler has been inactive for a second inactive predetermined time period, wherein the second inactive predetermined time period is greater than the first inactive predetermined time period; and,
b) in response to determining that the boiler has been inactive for the second inactive predetermined time period:
i) draining the boiler to substantially remove water from the boiler;
ii) subsequently filing the boiler with water to the second water level;
iii) subsequently draining the boiler to substantially remove water from the boiler;
iv) subsequently filing the boiler with water to the second water level; and,
v) subsequently draining the boiler to substantially remove water from the boiler.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first inactive predetermined time is between 18 and 48 hours and the second inactive predetermined time is between 48 and 96 hours.

### Claim 12 (depends on 10)

The method of claim 10, wherein the first inactive predetermined time is between 18 and 36 hours and the second inactive predetermined time is between 54 and 90 hours.

### Claim 13 (depends on 2)

The method of claim 2, wherein detecting the trigger condition comprises determining that the boiler exceeds a predetermined water level when the boiler is active.

### Claim 14 (depends on 2)

The method of claim 2, wherein detecting the trigger condition comprises determining that the boiler contains water exceeding a predetermined salinity level.

### Claim 15 (depends on 1)

The method of claim 1, further comprising deactivating the boiler prior to step a) and activating the boiler to boil water subsequent to step f).

### Claim 16 (depends on 1)

The method of claim 1, further comprising, subsequent to determining that the triggering condition has occurred:
a) draining the boiler to substantially remove water from the boiler;
b) subsequently filing the boiler with water to the second water level;
c) subsequently draining the boiler to substantially remove water from the boiler;
d) subsequently filing the boiler with water to the second water level; and,
e) subsequently draining the boiler to substantially remove water from the boiler.

### Claim 17 (depends on 14)

The method of claim 14, wherein detecting the trigger condition comprises determining that the boiler has been inactive for a first inactive predetermined time period or the boiler has been active for a first active predetermined time period, whichever occurs first.

### Claim 18 (depends on 15)

The method of claim 15, further comprising:
a) subsequent to determining that the boiler has been inactive for a first inactive predetermined time period, determining that the boiler has been inactive for a second inactive predetermined time period, wherein the second inactive predetermined time period is greater than the first inactive predetermined time period; and,
b) in response to determining that the boiler has been inactive for the second inactive predetermined time period:
i) draining the boiler to substantially remove water from the boiler;
ii) subsequently filing the boiler with water to the second water level;
iii) subsequently draining the boiler to substantially remove water from the boiler;
iv) subsequently filing the boiler with water to the second water level; and,
v) subsequently draining the boiler to substantially remove water from the boiler.
