# US 2022/0026062 A1 · System and method to prevent the oxidizer overheating using cold side bypass for a vocs treatment system with series rotor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0026062 A1
- Document ID: US20220026062A1
- Status: Published application
- Kind: A1
- Application number: 17/367,464
- Filed: 2021-07-05
- Published: 2022-01-27
- Earliest claimed: 2020-07-22
- Assignees: Desiccant Technology Corporation; Desiccant Technology(Shanghai) Corporation
- Applicants: Desiccant Technology Corporation; Desiccant Technology(Shanghai) Corporation
- Inventors: Shih-Chih CHENG; Kuo-Yuan LIN; Ya-Ming FU; Chung-Hsien CHEN; Pang-Yu LIU
- Web page: https://patentgrep.com/patent/US20220026062A1

## CPC

- F23G 7/06: of waste gases or noxious gases, e.g. exhaust gases (exhaust apparatus for engines with means for rendering the exhaust innocuous, e.g. by thermal or catalytic conversion, F01N3/08; combustion of uncombusted material from primary combustion within apparatus for combustion of solid or fluent fuel F23B {, of non combusted material from primary combustion of solid fuels; of gases produced by primary combustion of solid fuels F23B90/04}, F23C)
- F23G 7/068: {using regenerative heat recovery means}
- B01D 53/06: with moving adsorbents, e.g. rotating beds {(B01D53/025 takes precedence)}
- B01D 53/08: according to the "moving bed" method
- B01D 2257/708: Volatile organic compounds V.O.C.'s
- B01D 2258/06: Polluted air
- F23G 2201/60: Separating
- F23G 2201/90: Cooling
- F23G 2206/10: reintroducing the heat in the same process, e.g. for predrying
- F23G 2207/50: Cooling fluid supply
- F23G 2209/14: Gaseous waste or fumes
- F23G 2900/00001: Exhaust gas recirculation
- F23G: CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)

## Abstract

The instant disclosure described a system and method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, which may be used in an organic waste air treatment system. The system is equipped with a Thermal Oxidizer (TO), a First Heat Exchanger, a Second Heat Exchanger, a third heat exchanger, a First Cold-Side Transporting Pipeline, a First Adsorption Rotor, a Second Adsorption Rotor, and a Chimney. There is a Cold-Side Proportional Damper installed between the First Desorption-Treated Air Pipeline and the First Cold-Side Transporting Pipeline, or it is installed on the First Desorption-Treated Air Pipeline. When the VOCs concentration becomes higher, the Cold-Side Proportional Damper can regulate the airflow to adjust the heat-recovery amount or concentration, when treating the organic waste air, it can prevent the TO from being overheated due to high oxidizer temperature, and protect it from Thermal Oxidizer shut-down.

## Claims

### Claim 1

A System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, comprising:
A Thermal Oxidizer (TO), equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) has the Entrance and Exit, the Entrance is at the Burner, the Exit is at the Chamber;
A First Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline;
A Second Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline;
A Third Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline;
A First Cold-Side Transporting Pipeline, one end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the entrance of the Thermal Oxidizer (TO);
A First Adsorption Rotor, equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline and a First Desorption-Treated Air Pipeline. One end of the Exhaust Air Intake Pipeline is connected with one side of the Adsorption Zone in the First Adsorption Rotor, one end of the First Purified Air Discharge Pipeline is connected with the other end of the Adsorption Zone in the First Adsorption Rotor, one end of the First Cooling Air Intake Pipeline is connected with one side of the Cooling Zone in the First Adsorption Rotor, one end of the First Cooling Air Transporting Pipeline is connected with the other side of the Cooling Zone in the First Adsorption Rotor, the other end of the First Cooling Air Transporting Pipeline is connected with one end of the Third Cold-Side Pipeline in the Third Heat Exchanger, one end of the First Hotter Air Transporting Pipeline is connected with the other side of the Desorption Zone in the First Adsorption Rotor, the other end of the First Hotter Air Transporting Pipeline is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger, one end of the First Desorption-Treated Air Pipeline is connected with one side of the Desorption Zone in the First Adsorption Rotor, the other end of the First Desorption-Treated Air Pipeline is connected with one end of the First Cold-Side Pipeline in the First Heat Exchanger;
A Second Adsorption Rotor, equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. One end of the First Purified Air Discharge Pipeline is connected with one side of the Adsorption Zone in the Second Adsorption Rotor, one end of the Second Purified Air Discharge Pipeline is connected with the other side of the Adsorption Zone in the Second Adsorption Rotor, one end of the Second Cooling Air Intake Pipeline is connected to one side of the Cooling Zone in the Second Adsorption Rotor, one end of the Second Cooling Air Transporting Pipeline is connected with the other side of the Cooling Zone in the Second Adsorption Rotor, the other end of the Second Cooling Air Transporting Pipeline is connected with one end of the Second Cold-Side Pipeline in the Second Heat Exchanger, one end of the Second Hotter Air Transporting Pipeline is connected with the other side of the Desorption Zone in the Second Adsorption Rotor, the other end of the Second Hotter Air Transporting Pipeline is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, one end of the Second Desorption-Treated Air Pipeline is connected with one side of the Desorption Zone in the Second Adsorption Rotor;
A Chimney, which is connected with the other end of the Second Purified Air Discharge Pipeline; and
A Cold-Side Proportional Damper, one end of the Cold-Side Proportional Damper is connected with the First Desorption-Treated Air Pipeline, the other end of the Cold-Side Proportional Damper is connected with the First Cold-Side Transporting Pipeline.

### Claim 2 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the Exit of the Thermal Oxidizer (TO) is further connected to the Chimney.

### Claim 3 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the First Cooling Air Intake Pipeline is further for the access of fresh air or external air.

### Claim 4 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the Second Cooling Air Intake Pipeline is further for the access of fresh air or external air.

### Claim 5 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve used to control the airflow of the Waste Air Linking Pipeline.

### Claim 6 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve to control the airflow of the First Purified Air Linking Pipeline.

### Claim 7 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the First Desorption-Treated Air Pipeline is further equipped with a Fan.

### Claim 8 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the Second Desorption-Treated Air Pipeline s further equipped with a Fan.

### Claim 9 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the Second Purified Air Discharge Pipeline s further equipped with a Fan.

### Claim 10 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the other end of the Second Desorption-Treated Air Pipeline is connected with the Exhaust Air Intake Pipeline.

### Claim 11 (depends on 1)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 1, wherein the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.

### Claim 12

A System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, comprising:
A Thermal Oxidizer (TO), equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) is equipped with the Entrance and Exit, the Entrance is at the Burner, the Exit is at the Chamber;
A First Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline;
A Second Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline;
A Third Heat Exchanger, installed in the Chamber of the Thermal Oxidizer (TO), the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline;
A First Cold-Side Transporting Pipeline, one end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the entrance of the Thermal Oxidizer (TO);
A First Adsorption Rotor, equipped with the Adsorption Zone, the Cooling Zone, and the Desorption Zone. The First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline, and a First Desorption-Treated Air Pipeline. One end of the Exhaust Air Intake Pipeline is connected with one side of the Adsorption Zone in the First Adsorption Rotor, one end of the First Purified Air Discharge Pipeline is connected with the other side of the Adsorption Zone in the First Adsorption Rotor, one end of the First Cooling Air Intake Pipeline is connected with one side of the Cooling Zone in the First Adsorption Rotor, one end of the First Cooling Air Transporting Pipeline is connected with the other side of the Cooling Zone in the First Adsorption Rotor, the other end of the First Cooling Air Transporting Pipeline is connected with one end of the Third Cold-Side Pipeline in the Third Heat Exchanger, one end of the First Hotter Air Transporting Pipeline is connected with the other side of the Desorption Zone in the First Adsorption Rotor, the other end of the First Hotter Air Transporting Pipeline is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger, one end of the First Desorption-Treated Air Pipeline is connected with one side of the Desorption Zone in the First Adsorption Rotor, the other end of the First Desorption-Treated Air Pipeline is connected with one end of the First Cold-Side Pipeline in the First Heat Exchanger;
A Second Adsorption Rotor, equipped with the Adsorption Zone, Cooling Zone and Desorption Zone. The Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. One end of the First Purified Air Discharge Pipeline is connected with one side of the Adsorption Zone in the Second Adsorption Rotor, one end of the Second Purified Air Discharge Pipeline is connected with the other side of the Adsorption Zone in the Second Adsorption Rotor, one end of the Second Cooling Air Intake Pipeline is connected with one side of the Cooling Zone in the Second Adsorption Rotor, one end of the Second Cooling Air Transporting Pipeline is connected with the other side of the Cooling Zone in the Second Adsorption Rotor, the other end of the Second Cooling Air Transporting Pipeline is connected with one end of the Second Cold-Side Pipeline in the Second Heat Exchanger, one end of the Second Hotter Air Transporting Pipeline is connected with the other side of the Desorption Zone in the Second Adsorption Rotor, the other end of the Second Hotter Air Transporting Pipeline is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, one end of the Second Desorption-Treated Air Pipeline is connected with one side of the Desorption Zone in the Second Adsorption Rotor;
A Chimney, which is connected with the other end of the Second Purified Air Discharge Pipeline; and
A Cold-Side Proportional Damper, one end of the Cold-Side Proportional Damper is connected with the First Desorption-Treated Air Pipeline, the other end of the Cold-Side Proportional Damper is connected with the Fourth Cold-Side Transporting Pipeline.

### Claim 13 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the Exit of the Thermal Oxidizer (TO) is further connected to the Chimney.

### Claim 14 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the First Cooling Air Intake Pipeline is further for the access of fresh air or external air.

### Claim 15 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the Second Cooling Air Intake Pipeline is further for the access of fresh air or external air.

### Claim 16 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve used to control the airflow of the Waste Air Linking Pipeline.

### Claim 17 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve to control the airflow of the First Purified Air Linking Pipeline.

### Claim 18 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the First Desorption-Treated Air Pipeline is further equipped with a Fan.

### Claim 19 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the Second Desorption-Treated Air Pipeline s further equipped with a Fan.

### Claim 20 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the Second Purified Air Discharge Pipeline s further equipped with a Fan.

### Claim 21 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the other end of the Second Desorption-Treated Air Pipeline is connected with the Exhaust Air Intake Pipeline.

### Claim 22 (depends on 12)

The System to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 12, wherein the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.

### Claim 23

A Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, mainly used in the organic waste air treatment system, the method is equipped with a Thermal Oxidizer (TO), a First Heat Exchanger, a Second Heat Exchanger, a Third Heat Exchanger, a First Cold-Side Transporting Pipeline, a First Adsorption Rotor, a Second Adsorption Rotor and a Chimney. The Thermal Oxidizer (TO) is equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) is equipped with the Entrance and the Exit, the Entrance is installed in the Burner, the Exit is installed in the Chamber, the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline, the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline, the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline. One end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the Entrance of the Thermal Oxidizer (TO). The First Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline and a First Desorption-Treated Air Pipeline, the Second Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone. The Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. The main steps of the control method comprising:
Inputting the waste air to be adsorbed: Send the waste air to one side of the Adsorption Zone in the First Adsorption Rotor via the Exhaust Air Intake Pipeline;
Adsorption of the First Adsorption Rotor: After adsorbed at the Adsorption Zone of the First Adsorption Rotor, output the adsorbed air to the Adsorption Zone of the Second Adsorption Rotor from the other side of the Adsorption Zone in the First Adsorption Rotor via the other end of the First Purified Air Discharge Pipeline;
Inputting the first cooling air: Transporting the cooling air to the Cooling Zone of the First Adsorption Rotor through the other end of the First Cooling Air Intake Pipeline to perform cooling, then, transporting the cooling air that has passed through the Cooling Zone of the First Adsorption Rotor to one end of the Third Cold-Side Pipeline in the Third Heat Exchanger via the other end of the First Cooling Air Transporting Pipeline;
Transporting of the first desorbed hotter air: Transporting the hotter air to the Desorption Zone of the First Adsorption Rotor through the First Hotter Air Transporting Pipeline that is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger to perform desorption, then, through the other end of the First Desorption-Treated Air Pipeline, transporting the desorption-treated air to one end of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the desorption-treated air: Transporting the desorption-treated air to the First Cold-Side Transporting Pipeline which is connected at the other end of the First Cold-Side Pipeline in the First Heat Exchanger, transporting the desorption-treated air to the Entrance of the Thermal Oxidizer (TO);
Transporting of the incinerated air: Transporting the incinerated air at the Burner of the Thermal Oxidizer (TO) to one end of the Third Hot-Side Pipeline in the Third Heat Exchanger, then, the other end of the Third Hot-Side Pipeline in the Third Heat Exchanger transports the incinerated air to one end of the Second Hot-Side Pipeline in the Second Heat Exchanger, then, the other end of the Second Hot-Side Pipeline in the Second Heat Exchanger transports the incinerated air to one end of the First Hot-Side Pipeline in the First Heat Exchanger, finally, the other end of the First Hot-Side Pipeline in the First Heat Exchanger transports the incinerated air to the Exit of the Thermal Oxidizer (TO);
Adsorption of the Second Adsorption Rotor: Transporting the adsorbed air in the First Purified Air Discharge Pipeline to one side of the Adsorption Zone in the Second Adsorption Rotor to perform secondary adsorption, then, transporting the secondary adsorbed air to the Chimney and discharge it therein via the Second Purified Air Discharge Pipeline;
Inputting the second cooling air: Transporting the cooling air to the Cooling Zone of the Second Adsorption Rotor to performing cooling through the other end of the Second Cooling Air Intake Pipeline, then, transporting the cooling air to one end of the Second Cold-Side Pipeline in the Second Heat Exchanger through the other end of the Second Cooling Air Transporting Pipeline that is passing through the Cooling Zone of the Second Adsorption Rotor;
Transporting of the second desorbed hotter air: Transporting the hotter air to the Desorption Zone of the Second Adsorption Rotor to perform desorption through the Second Hotter Air Transporting Pipeline which is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, then output the desorbed hotter air through the other end of the Second Desorption-Treated Air Pipeline; and
Control of the Cold-Side Proportional Damper: Equipping a Cold-Side Proportional Damper between the First Desorption-Treated Air Pipeline and the First Cold-Side Transporting Pipeline, use this Cold-Side Proportional Damper to control the airflows of the First Desorption-Treated Air Pipeline and the First Cold-Side Transporting Pipeline.

### Claim 24 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the Exit of the Thermal Oxidizer (TO) is further connected with the Chimney.

### Claim 25 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the First Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 26 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the Second Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 27 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve, which is used to control the airflow of the Waste Air Linking Pipeline.

### Claim 28 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve and use it to control the airflow of the First Purified Air Linking Pipeline.

### Claim 29 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the First Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 30 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the Second Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 31 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the Second Purified Air Discharge Pipeline is further equipped with a fan.

### Claim 32 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the Exhaust Air Intake Pipeline.

### Claim 33 (depends on 23)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 23, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.

### Claim 34

A Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, mainly used in the organic waste air treatment system, equipped with a Thermal Oxidizer (TO), a First Heat Exchanger, a Second Heat Exchanger, a Third Heat Exchanger, a First Cold-Side Transporting Pipeline, a First Adsorption Rotor, a Second Adsorption Rotor and a Chimney. The Thermal Oxidizer (TO) is equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) is equipped with the Entrance and the Exit, the Entrance is installed in the Burner, the Exit is installed in the Chamber, the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline, the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline, the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline. One end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the Entrance of the Thermal Oxidizer (TO). The First Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline and a First Desorption-Treated Air Pipeline, the Second Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone. The Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. The main steps of the control method comprising:
Inputting the waste air to be adsorbed: Send the waste air to one side of the Adsorption Zone in the First Adsorption Rotor via the Exhaust Air Intake Pipeline;
Adsorption of the First Adsorption Rotor: After adsorbed at the Adsorption Zone of the First Adsorption Rotor, output the adsorbed air to the Adsorption Zone of the Second Adsorption Rotor from the other side of the Adsorption Zone in the First Adsorption Rotor through the other end of the First Purified Air Discharge Pipeline;
Inputting the first cooling air: Transporting the cooling air to the Cooling Zone of the First Adsorption Rotor through the other end of the First Cooling Air Intake Pipeline to perform cooling, then, transporting the cooling air that has passed through the Cooling Zone of the First Adsorption Rotor to one end of the Third Cold-Side Pipeline in the Third Heat Exchanger through the other end of the First Cooling Air Transporting Pipeline;
Transporting of the first desorbed hotter air: Transporting the hotter air to the Desorption Zone of the First Adsorption Rotor through the First Hotter Air Transporting Pipeline that is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger to perform desorption, then, through the other end of the First Desorption-Treated Air Pipeline, transporting the desorption-treated air to one end of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the desorption-treated air: Transporting the desorption-treated air to one end of the Fourth Cold-Side Pipeline in the Fourth Heat Exchanger via the First Cold-Side Transporting Pipeline which is connected at the other end of the First Cold-Side Pipeline in the First Heat Exchanger, then, transporting the desorption-treated air to the Entrance of the Thermal Oxidizer (TO) via the Fourth Cold-Side Transporting Pipeline which is connected at the other side of the Fourth Cold-Side Pipeline through the Fourth Heat Exchanger;
Transporting of the incinerated air: Transporting the incinerated air at the Burner of the Thermal Oxidizer (TO) to one end of the Fourth Hot-Side Pipeline in the Fourth Heat Exchanger, then, transporting the incinerated air to one end of the Third Hot-Side Pipeline in the Third Heat Exchanger through the other end of the Fourth Hot-Side Pipeline in the Fourth Heat Exchanger, next, transporting the incinerated air to one end of the Second Hot-Side Pipeline in the Second Heat Exchanger through the other end of the Third Hot-Side Pipeline in the Third Heat Exchanger, then, transporting it to one end of the First Hot-Side Pipeline in the First Heat Exchanger through the other end of the Second Hot-Side Pipeline in the Second Heat Exchanger, finally, transporting the incinerated air to the Exit of the Thermal Oxidizer (TO) through the other end of the First Hot-Side Pipeline in the First Heat Exchanger;
Adsorption of the Second Adsorption Rotor: Transporting the adsorbed air in the First Purified Air Discharge Pipeline to one side of the Adsorption Zone in the Second Adsorption Rotor to perform secondary adsorption, then, transporting the secondary adsorbed air to the Chimney and discharge it therein via the Second Purified Air Discharge Pipeline;
Inputting the second cooling air: Transporting the cooling air to the Cooling Zone of the Second Adsorption Rotor to performing cooling through the other end of the Second Cooling Air Intake Pipeline, then, transporting the cooling air to one end of the Second Cold-Side Pipeline in the Second Heat Exchanger through the other end of the Second Cooling Air Transporting Pipeline that is passing through the Cooling Zone of the Second Adsorption Rotor;
Transporting of the second desorbed hotter air: Transporting the hotter air to the Desorption Zone of the Second Adsorption Rotor to perform desorption via the Second Hotter Air Transporting Pipeline which is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, then output the desorbed hotter air through the other end of the Second Desorption-Treated Air Pipeline; and
Control of the Cold-Side Proportional Damper: Equipping a Cold-Side Proportional Damper between the First Desorption-Treated Air Pipeline and the First Cold-Side Transporting Pipeline, use this Cold-Side Proportional Damper to control the airflows of the First Desorption-Treated Air Pipeline and the First Cold-Side Transporting Pipeline.

### Claim 35 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the Exit of the Thermal Oxidizer (TO) is further connected with the Chimney.

### Claim 36 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the First Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 37 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the Second Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 38 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve, which is used to control the airflow of the Waste Air Linking Pipeline.

### Claim 39 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve and use it to control the airflow of the First Purified Air Linking Pipeline.

### Claim 40 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the First Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 41 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the Second Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 42 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the Second Purified Air Discharge Pipeline is further equipped with a fan.

### Claim 43 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the Exhaust Air Intake Pipeline.

### Claim 44 (depends on 34)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 34, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.

### Claim 45

A Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, mainly used in the organic waste air treatment system, equipped with a Thermal Oxidizer (TO), a First Heat Exchanger, a Second Heat Exchanger, a Third Heat Exchanger, a First Cold-Side Transporting Pipeline, a First Adsorption Rotor, a Second Adsorption Rotor and a Chimney. The Thermal Oxidizer (TO) is equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) is equipped with the Entrance and the Exit, the Entrance is installed in the Burner, the Exit is installed in the Chamber, the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline, the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline, the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline. One end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the Entrance of the Thermal Oxidizer (TO). The First Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline and a First Desorption-Treated Air Pipeline, the Second Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone. The Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. The main steps of the control method comprising:
Inputting the waste air to be adsorbed: Send the waste air to one side of the Adsorption Zone in the First Adsorption Rotor via the Exhaust Air Intake Pipeline;
Adsorption of the First Adsorption Rotor: After adsorbed at the Adsorption Zone of the First Adsorption Rotor, output the adsorbed air to the Adsorption Zone of the Second Adsorption Rotor from the other side of the Adsorption Zone in the First Adsorption Rotor through the other end of the First Purified Air Discharge Pipeline;
Inputting the first cooling air: Transporting the cooling air to the Cooling Zone of the First Adsorption Rotor through the other end of the First Cooling Air Intake Pipeline to perform cooling, then, transporting the cooling air that has passed through the Cooling Zone of the First Adsorption Rotor to one end of the Third Cold-Side Pipeline in the Third Heat Exchanger through the other end of the First Cooling Air Transporting Pipeline;
Transporting of the first desorbed hotter air: Transporting the hotter air to the Desorption Zone of the First Adsorption Rotor via the First Hotter Air Transporting Pipeline that is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger to perform desorption, then, through the other end of the First Desorption-Treated Air Pipeline, transporting the desorption-treated air to one end of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the desorption-treated air: Transporting the desorption-treated air to the Entrance of the Thermal Oxidizer (TO) via the First Cold-Side Transporting Pipeline which is connected at the other end of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the incinerated air: Transporting the incinerated air at the Burner of the Thermal Oxidizer (TO) to one end of the Third Hot-Side Pipeline in the Third Heat Exchanger, then, transporting the incinerated air to one end of the Second Hot-Side Pipeline in the Second Heat Exchanger through the other end of the Third Hot-Side Pipeline in the Third Heat Exchanger, next, transporting the incinerated air to one end of the First Hot-Side Pipeline in the First Heat Exchanger through the other end of the Second Hot-Side Pipeline in the Second Heat Exchanger, finally, transporting the incinerated air to the Exit of the Thermal Oxidizer (TO) through the other end of the First Hot-Side Pipeline in the First Heat Exchanger;
Adsorption of the Second Adsorption Rotor: Transporting the adsorbed air in the First Purified Air Discharge Pipeline to one side of the Adsorption Zone in the Second Adsorption Rotor to perform secondary adsorption, then, transporting the secondary adsorbed air to the Chimney and discharge it therein through the Second Purified Air Discharge Pipeline;
Inputting the second cooling air: Transporting the cooling air to the Cooling Zone of the Second Adsorption Rotor to performing cooling through the other end of the Second Cooling Air Intake Pipeline, then, transporting the cooling air to one end of the Second Cold-Side Pipeline in the Second Heat Exchanger through the other end of the Second Cooling Air Transporting Pipeline that is passing through the Cooling Zone of the Second Adsorption Rotor;
Transporting of the second desorbed hotter air: Transporting the hotter air to the Desorption Zone of the Second Adsorption Rotor to perform desorption via the Second Hotter Air Transporting Pipeline which is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, then, output the desorbed hotter air through the other end of the Second Desorption-Treated Air Pipeline; and
Control of the Cold-Side Proportional Damper: Equipping a Cold-Side Proportional Damper at the First Desorption-Treated Air Pipeline, the other end of the Cold-Side Proportional Damper allows external air to access, use this Cold-Side Proportional Damper to control the airflows of the First Desorption-Treated Air Pipeline.

### Claim 46 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the Exit of the Thermal Oxidizer (TO) is further connected with the Chimney.

### Claim 47 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the First Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 48 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the Second Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 49 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve, which is used to control the airflow of the Waste Air Linking Pipeline.

### Claim 50 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve and use it to control the airflow of the First Purified Air Linking Pipeline.

### Claim 51 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the First Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 52 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the Second Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 53 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the Second Purified Air Discharge Pipeline is further equipped with a fan.

### Claim 54 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the Exhaust Air Intake Pipeline.

### Claim 55 (depends on 45)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 45, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.

### Claim 56

A Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor, mainly used in the organic waste air treatment system, equipped with a Thermal Oxidizer (TO), a First Heat Exchanger, a Second Heat Exchanger, a Third Heat Exchanger, a First Cold-Side Transporting Pipeline, a First Adsorption Rotor, a Second Adsorption Rotor and a Chimney. The Thermal Oxidizer (TO) is equipped with a Burner and a Chamber, the Burner and the Chamber are linked together, the Thermal Oxidizer (TO) is equipped with the Entrance and the Exit, the Entrance is installed in the Burner, the Exit is installed in the Chamber, the First Heat Exchanger is equipped with the First Cold-Side Pipeline and the First Hot-Side Pipeline, the Second Heat Exchanger is equipped with the Second Cold-Side Pipeline and the Second Hot-Side Pipeline, the Third Heat Exchanger is equipped with the Third Cold-Side Pipeline and the Third Hot-Side Pipeline. One end of the First Cold-Side Transporting Pipeline is connected with the other end of the First Cold-Side Pipeline, the other end of the First Cold-Side Transporting Pipeline is connected with the Entrance of the Thermal Oxidizer (TO). The First Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone, the First Adsorption Rotor is connected with an Exhaust Air Intake Pipeline, a First Purified Air Discharge Pipeline, a First Cooling Air Intake Pipeline, a First Cooling Air Transporting Pipeline, a First Hotter Air Transporting Pipeline and a First Desorption-Treated Air Pipeline, the Second Adsorption Rotor is equipped with the Adsorption Zone, the Cooling Zone and the Desorption Zone. The Second Adsorption Rotor is connected with a Second Purified Air Discharge Pipeline, a Second Cooling Air Intake Pipeline, a Second Cooling Air Transporting Pipeline, a Second Hotter Air Transporting Pipeline, and a Second Desorption-Treated Air Pipeline. The main steps of the control method comprising:
Inputting the waste air to be adsorbed: Send the waste air to one side of the Adsorption Zone in the First Adsorption Rotor via the Exhaust Air Intake Pipeline;
Adsorption of the First Adsorption Rotor: After adsorbed at the Adsorption Zone of the First Adsorption Rotor, output the adsorbed air to the Adsorption Zone of the Second Adsorption Rotor from the other side of the Adsorption Zone in the First Adsorption Rotor through the other end of the First Purified Air Discharge Pipeline;
Inputting the first cooling air: Transporting the cooling air to the Cooling Zone of the First Adsorption Rotor through the other end of the First Cooling Air Intake Pipeline to perform cooling, then, transporting the cooling air that has passed through the Cooling Zone of the First Adsorption Rotor to one end of the Third Cold-Side Pipeline in the Third Heat Exchanger through the other end of the First Cooling Air Transporting Pipeline;
Transporting of the first desorbed hotter air: Transporting the hotter air to the Desorption Zone of the First Adsorption Rotor via the First Hotter Air Transporting Pipeline that is connected with the other end of the Third Cold-Side Pipeline in the Third Heat Exchanger to perform desorption, then, through the other end of the First Desorption-Treated Air Pipeline, transporting the desorption-treated air to one end of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the desorption-treated air: Transporting the desorption-treated air to the Entrance of the Thermal Oxidizer (TO) through the First Cold-Side Transporting Pipeline which is connected with the other side of the First Cold-Side Pipeline in the First Heat Exchanger;
Transporting of the incinerated air: Transporting the incinerated air at the Burner of the Thermal Oxidizer (TO) to one end of the First Hot-Side Pipeline in the First Heat Exchanger, then, transporting the incinerated air to one end of the Third Hot-Side Pipeline in the Third Heat Exchanger through the other end of the First Hot-Side Pipeline in the First Heat Exchanger, next, transporting the incinerated air to one end of the Second Hot-Side Pipeline in the Second Heat Exchanger through the other end of the Third Hot-Side Pipeline in the Third Heat Exchanger, then, transporting it to one end of the Second Hot-Side Pipeline in the Second Heat Exchanger through the other end of the Third Hot-Side Pipeline in the Third Heat Exchanger, finally, transporting the incinerated air to the Exit of the Thermal Oxidizer (TO) through the other end of the First Hot-Side Pipeline in the First Heat Exchanger;
Adsorption of the Second Adsorption Rotor: Transporting the adsorbed air in the First Purified Air Discharge Pipeline to one side of the Adsorption Zone in the Second Adsorption Rotor to perform secondary adsorption, then, transporting the secondary adsorbed air to the Chimney and discharge it therein via the Second Purified Air Discharge Pipeline;
Inputting the second cooling air: Transporting the cooling air to the Cooling Zone of the Second Adsorption Rotor to performing cooling through the other end of the Second Cooling Air Intake Pipeline, then, transporting the cooling air to one end of the Second Cold-Side Pipeline in the Second Heat Exchanger through the other end of the Second Cooling Air Transporting Pipeline that is passing through the Cooling Zone of the Second Adsorption Rotor;
Transporting of the second desorbed hotter air: Transporting the hotter air to the Desorption Zone of the Second Adsorption Rotor to perform desorption via the Second Hotter Air Transporting Pipeline which is connected with the other end of the Second Cold-Side Pipeline in the Second Heat Exchanger, then output the desorbed hotter air through the other end of the Second Desorption-Treated Air Pipeline; and
Control of the Cold-Side Proportional Damper: Equipping a Cold-Side Proportional Damper in the First Desorption-Treated Air Pipeline, use this Cold-Side Proportional Damper to control the airflow of the First Desorption-Treated Air Pipeline.

### Claim 57 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the Exit of the Thermal Oxidizer (TO) is further connected with the Chimney.

### Claim 58 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the First Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 59 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the Second Cooling Air Intake Pipeline is further used to allow the access of fresh air or external air.

### Claim 60 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the Exhaust Air Intake Pipeline is further equipped with a Waste Air Linking Pipeline, the Waste Air Linking Pipeline is connected with the First Cooling Air Intake Pipeline, the Waste Air Linking Pipeline is further equipped with a Waste Air Linking Control Valve, which is used to control the airflow of the Waste Air Linking Pipeline.

### Claim 61 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the First Purified Air Discharge Pipeline is further equipped with a First Purified Air Linking Pipeline, the First Purified Air Linking Pipeline is connected with the Second Cooling Air Intake Pipeline, the First Purified Air Linking Pipeline is further equipped with a First Purified Air Linking Control Valve and use it to control the airflow of the First Purified Air Linking Pipeline.

### Claim 62 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the First Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 63 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the Second Desorption-Treated Air Pipeline is further equipped with a fan.

### Claim 64 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the Second Purified Air Discharge Pipeline is further equipped with a fan.

### Claim 65 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the Exhaust Air Intake Pipeline.

### Claim 66 (depends on 56)

The Method to prevent the oxidizer overheating using cold side bypass for a VOCs treatment system with series rotor as claimed in claim 56, wherein the step of transporting the second desorbed hotter air, the other end of the Second Desorption-Treated Air Pipeline is further connected with the First Cooling Air Intake Pipeline.