# US 2022/0024727 A1 · Method for operating a construction site device and construction site device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0024727 A1
- Document ID: US20220024727A1
- Status: Published application
- Kind: A1
- Application number: 17/309,322
- Filed: 2019-12-13
- Published: 2022-01-27
- Earliest claimed: 2018-12-18
- Assignees: Inventio AG
- Applicants: Inventio AG
- Inventors: Christian Studer; Gabriele Bizzozero; Oliver Simmonds; Stefan Weber
- Web page: https://patentgrep.com/patent/US20220024727A1

## CPC

- B66B 19/00: Mining-hoist operation
- E04G 11/22: Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising {and which are not anchored in the hardened concrete}; Arrangements of lifting means therefor
- B66B 1/3492: {Position or motion detectors or driving means for the detector (B66B1/40, B66B1/50 take precedence; length measuring G01B; speed measuring G01P)}
- B66B 9/00: Kinds or types of lifts in, or associated with, buildings or other structures (characterised by control systems B66B1/00; apparatus for raising or lowering persons on stages of theatres A63J5/12)
- B66B 9/187: with a liftway specially adapted for temporary connection to a building or other structure (B66B9/193 takes precedence)
- E04G 21/166: {Landings, receiving platforms}
- E04G 27/00: Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps (for scaffolds E04G5/10; gangways B63; lifts B66)
- B66B: ELEVATORS; ESCALATORS OR MOVING WALKWAYS ({apparatus for raising or lowering persons on theatrical stages or the like A63J5/12} ; funicular railbound systems with rigid ground-supported tracks and cable traction, e.g. cliff railways, B61B9/00; arrangements of ammunition handlers in vessels B63G3/00; hoists, lifts, or conveyors for loading or unloading in general B65G; braking or detent devices controlling normal movements of winding drums or barrels B66D; ship-lifting devices E02C; garages for many vehicles with mechanical means for lifting vehicles E04H6/12; hoists for feeding ammunition or projectiles to launching apparatus or to loading mechanisms F41A9/00)
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A method and construction site device for vertical transportation during a building construction phase include a climbing formwork platform arranged in a currently uppermost region of the building for concreting at least part of the building core, an elevator car intermittently adjusted to a current building height in a first elevator shaft by hoisting a mechanical platform to a higher level and fixing it there, a construction elevator temporarily installed in a second elevator shaft and attached to the climbing formwork platform with a construction elevator car vertically movable in a construction elevator frame, and wherein people and/or material are transported to a floor associated with an access opening of the construction elevator by the elevator system and then are transported from this floor to a floor situated in the currently uppermost region of the building or to the climbing formwork platform by the construction elevator.

## Claims

### Claim at position 1

1-15. (canceled)

### Claim 16

A method for vertical transportation of people and/or material in a building during a construction phase of the building, the method comprising the steps of:
arranging a climbing formwork device in a currently uppermost region of the building to concrete at least part of a building core of the building, the climbing formwork device including a climbing formwork platform and being adapted to be hoisted in steps;
installing an elevator system in a first elevator shaft of the building, the elevator system adapted to adjust to an increasing building height and having an elevator car, wherein a conveying height of the elevator system is intermittently adjusted to a current building height by hoisting a mechanical platform including an elevator drive machine to a higher level and fixing the mechanical platform in the first elevator shaft, and wherein at least two currently uppermost floors of the building cannot be reached by the elevator car after the conveying height is adjusted;
installing a construction elevator temporarily in a second elevator shaft in the currently uppermost region of the building and attaching the construction elevator to the climbing formwork platform, wherein the construction elevator includes a construction elevator frame, a construction elevator car vertically movable in the construction elevator frame, and at least two access openings arranged in the construction elevator frame and corresponding to adjacent shaft door clearances in a shaft wall of the second elevator shaft;
transporting people and/or material by the elevator system to a first floor in the building associated with one of the at least two access openings; and
transporting the people and/or material from the first floor to a higher second floor in the currently uppermost region of the building or to the climbing formwork platform using the construction elevator.

### Claim 17 (depends on 16)

The method according to claim 16 including hoisting the climbing formwork platform in steps each corresponding to a whole floor height.

### Claim 18 (depends on 16)

The method according to claim 16 including using the elevator system during the construction phase of the building to transport people and/or material in a region of already inhabited or commercially used floors of the building, and after completion of the building leaving the elevator system permanently installed for use as a building elevator system.

### Claim 19 (depends on 16)

The method according to claim 16 wherein a part of the construction elevator lying below the climbing formwork platform is high enough that a floor of the building currently adjacent to a lowermost one of the at least two access openings can be reached by the elevator car of the elevator system when the mechanical platform is temporarily positioned at a predetermined maximum vertical distance from the climbing formwork platform.

### Claim 20 (depends on 16)

The method according to claim 16 wherein the construction elevator car has a conveying height that is in a range of four times to ten times an average floor height of the building.

### Claim 21 (depends on 16)

The method according to claim 16 including steps of delivering the construction elevator to a construction site of the building as a unit preassembled in a manufacturing plant, lowering the unit into the second elevator shaft using a hoisting device, and attaching the unit to the climbing formwork platform of the climbing formwork device.

### Claim 22 (depends on 16)

The method according to claim 16 wherein further access openings with assigned shaft doors are arranged on the construction elevator frame between a lowest one of the at least two access openings and an uppermost one of the at least two access openings.

### Claim 23 (depends on 16)

The method according to claim 16 wherein the construction elevator is attached to the climbing formwork platform of the climbing formwork device such that an uppermost region of the construction elevator frame with an uppermost access opening and a top shaft door protrude upwards beyond the climbing formwork platform.

### Claim 24 (depends on 16)

The method according to claim 16 wherein the construction elevator is attached to the climbing formwork platform of the climbing formwork device such that an entirety of construction elevator frame lies below the climbing formwork platform.

### Claim 25 (depends on 16)

The method according to claim 16 wherein the construction elevator frame of the construction elevator extends at least over an entire conveying height of the construction elevator car, the construction elevator car is equipped with a first car door, a drive device for raising and lowering the construction elevator car is installed at the construction elevator frame, and the at least two access openings in a locking position of the climbing formwork device correspond to the shaft door clearances in the shaft wall of the second elevator shaft, wherein shaft doors that work together with the first car door of the construction elevator car are attached to the construction elevator frame to close off the shaft door clearances.

### Claim 26 (depends on 25)

The method according to claim 25 wherein the at least two access openings and the shaft doors are arranged on the construction elevator frame such that levels of door sills of the shaft doors arranged below the climbing formwork platform match with levels of floors already constructed in the building when the climbing formwork device is in one of a plurality of predetermined locking positions, wherein at each of the locking positions another wall section of the building core is concreted with a wall section height corresponding to a floor height for the building.

### Claim 27 (depends on 25)

The method according to claim 25 wherein at least one of the at least two access openings and an associated one of the shaft door are arranged on the construction elevator frame such a vertical position of the at least one access opening and the associated shaft door to be adjusted to different floor heights or to different distances between floor levels of the building.

### Claim 28 (depends on 25)

The method according to claim 25 wherein the construction elevator is arranged in the second elevator shaft such that a first side of the construction elevator having the first car door and the shaft doors that work together with the first cabin door lie parallel to and adjacent to a first shaft wall of the second elevator shaft containing the shaft door clearances, wherein a second side of the construction elevator and a second shaft wall of the second elevator shaft parallel to the second side are spaced apart by at least 0.5 meters, wherein a second car door parallel to the second side of the construction elevator is attached to the construction elevator car and at least one access opening corresponding with the second car door and having an associated shaft door is attached to the construction elevator frame, and wherein, at a level of a door sill of the at least one shaft door corresponding to the second car door, in a space available between the second side of the construction elevator and the second shaft wall of the second elevator shaft parallel thereto, a walkable, horizontal platform is attached to the construction elevator frame, via which platform access to an interior of the second elevator shaft is possible from the construction elevator.

### Claim 29 (depends on 25)

The method according to claim 25 wherein information about a current vertical position of the construction elevator is transmitted to a controller of the elevator system, and the controller evaluates the position information to determine a transfer floor to which both the elevator car and the construction elevator car can move as a transfer stop for moving the people and/or material between the elevator system and the construction elevator.

### Claim 30 (depends on 16)

A construction site device adapted to perform the steps of the method according to claim 16 in a building during a construction phase of the building, the building including a plurality of floors that are built and the first elevator shaft that extends up to a current building height of the building, the device comprising:
the climbing formwork device including the climbing formwork platform arranged in the uppermost region of the building;
the elevator system installed in the first elevator shaft for transporting the people and/or material in a region of the floors that are built, the elevator system including the elevator car and the mechanical platform having the elevator drive machine for moving the elevator car, wherein at least the two uppermost floors are not accessible for the elevator car;
the construction elevator temporarily installed in the second elevator shaft and including the construction elevator frame forming a construction elevator shaft in which the construction elevator car is vertically movable and the at least two access openings corresponding to the shaft door clearances in the shaft wall of the second elevator shaft;
wherein the construction elevator is fixed to the climbing formwork platform, the people and/or material can be transported in the first step to the first floor by the elevator system, and the people and/or material can be transported in the second step to the second floor or to the climbing formwork platform by the construction elevator.