# US 2022/0021238 A1 · Single phase fault isolation and restoration with loop avoidance for multiple tie-in devices

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0021238 A1
- Document ID: US20220021238A1
- Status: Published application
- Kind: A1
- Application number: 16/933,653
- Filed: 2020-07-20
- Published: 2022-01-20
- Earliest claimed: 2020-07-20
- Assignees: G & W Electric Company
- Applicants: G & W Electric Company
- Inventors: Erich Keller; Nicholas Carmine DiFonzo
- Web page: https://patentgrep.com/patent/US20220021238A1

## CPC

- H02H 3/13: for multiphase applications, e.g. phase interruption
- H02J 13/34: the equipment being switches, relays or circuit breakers
- G01R 31/086: {in power transmission or distribution networks, i.e. with interconnected conductors}
- H02H 7/261: {involving signal transmission between at least two stations (transmission of signals in general H02H1/0061)}
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/18: using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
- Y04S 10/20: using protection elements, arrangements or systems
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method for controlling a power distribution network includes receiving, via an electronic processor, a fault indication associated with a fault from a first isolation device of a plurality of isolation devices. The processor identifies a first subset of a plurality of phases associated with the fault indication and a second subset not associated with the fault indication. The processor sends a first open command to each member of a set of downstream isolation devices for each phase in the first subset. The processor identifies a plurality of tie-in isolation devices to be closed to restore power. Responsive to identifying a first potential loop configuration, for each of the plurality of tie-in devices, the processor sends a close command to the tie-in isolation device for each of the plurality of phases and sends a second open command to the associated downstream isolation device for each phase in the second subset.

## Claims

### Claim 1

A system for controlling a power distribution network providing power using a plurality of phases, the system comprising:
an electronic processor configured to:
receive a first fault indication associated with a fault in the power distribution network from a first isolation device of a plurality of isolation devices;
identify a first subset of the plurality of phases associated with the first fault indication and a second subset of the plurality of phases not associated with the first fault indication, wherein the first subset and the second subset each include at least one member;
identify a set of downstream isolation devices downstream of the fault;
send a first open command to each member of the set of downstream isolation devices for each phase in the first subset;
identify a plurality of tie-in isolation devices to be closed to restore power, each of the tie-in isolation devices being associated with one of the set of downstream isolation devices; and
responsive to identifying a first potential loop configuration, for each of the plurality of tie-in devices:
send a close command to the tie-in isolation device for each of the plurality of phases; and
send a second open command to the associated downstream isolation device for each phase in the second subset, wherein the sending of the close command and the second open command are completed for each of the plurality of tie-in isolation devices prior to processing remaining ones of the plurality of tie-in isolation devices.

### Claim 2 (depends on 1)

The system of claim 1, wherein the electronic processor is configured to:
identify the potential loop configuration responsive to at least two of the plurality of tie-in isolation devices being supplied by a common power source.

### Claim 3 (depends on 1)

The system of claim 1, wherein the electronic processor is configured to:
responsive to identifying a second potential loop configuration associated with a selected one of the plurality of tie-in isolation devices, sending the second open command prior to sending the close command.

### Claim 4 (depends on 3)

The system of claim 3, wherein the electronic processor is configured to:
identify the second potential loop configuration responsive to a first source supplying the selected one of the plurality of tie-in isolation devices and the downstream isolation device associated with the selected one of the plurality of tie-in isolation devices.

### Claim 5 (depends on 3)

The system of claim 3, wherein the electronic processor is configured to:
identify a processing exception responsive to the downstream isolation device associated with a selected one of the plurality of tie-in isolation devices failing to execute the second open command after the selected tie-in isolation device executes the close command; and
send a third open command to the selected one of the plurality of tie-in isolation devices for each of the plurality of phases responsive to identifying the processing exception.

### Claim 6 (depends on 1)

The system of claim 1, wherein the electronic processor is configured to:
identify a processing exception associated with the sending of the first open command, the close command, or the second open command; and
generate an exception report indicating the processing exception and uncompleted steps associated with the processing of the first fault indication.

### Claim 7 (depends on 1)

The system of claim 1, wherein the electronic processor is configured to:
identify an upstream isolation device upstream of the fault; and
responsive to the first isolation device not being the upstream isolation device, send a close command to the first isolation device for each phase in the first subset.

### Claim 8 (depends on 1)

The system of claim 1, wherein the electronic processor is configured to:
send the close command to the tie-in isolation device by sending a ganged close command to concurrently close all of the phases of the tie-in isolation device.

### Claim 9 (depends on 1)

The system of claim 1, wherein the fault comprises a lockout fault that results in the first isolation device opening a first subset of the plurality of phases.

### Claim 10 (depends on 1)

The system of claim 1, wherein the fault comprises a loss of voltage fault.

### Claim 11

A method for controlling a power distribution network providing power using a plurality of phases, comprising:
receiving, via an electronic processor, a first fault indication associated with a fault in the power distribution network from a first isolation device of a plurality of isolation devices;
identifying, via the electronic processor, a first subset of the plurality of phases associated with the first fault indication and a second subset of the plurality of phases not associated with the first fault indication, wherein the first subset and the second subset each include at least one member;
identifying, via the electronic processor, a set of downstream isolation devices downstream of the fault;
sending, via the electronic processor, a first open command to each member of the set of downstream isolation devices for each phase in the first subset;
identifying, via the electronic processor, a set of downstream isolation devices downstream of the fault;
sending, via the electronic processor, a first open command to each member of the set of downstream isolation devices for each phase in the first subset;
identifying, via the electronic processor, a plurality of tie-in isolation devices to be closed to restore power, each of the tie-in isolation devices being associated with one of the set of downstream isolation devices; and
responsive to identifying, via the electronic processor, a first potential loop configuration, for each of the plurality of tie-in devices:
sending, via the electronic processor, a close command to the tie-in isolation device for each of the plurality of phases; and
sending, via the electronic processor, a second open command to the associated downstream isolation device for each phase in the second subset, wherein the sending of the close command and the second open command are completed for each of the plurality of tie-in isolation devices prior to processing remaining ones of the plurality of tie-in isolation devices.

### Claim 12 (depends on 11)

The method of claim 11, comprising:
identifying, via the electronic processor, the potential loop configuration responsive to at least two of the plurality of tie-in isolation devices being supplied by a common power source.

### Claim 13 (depends on 11)

The method of claim 11, comprising:
responsive to identifying, via the electronic processor, a second potential loop configuration associated with a selected one of the plurality of tie-in isolation devices, sending the second open command prior to sending the close command.

### Claim 14 (depends on 13)

The method of claim 13, comprising:
identifying, via the electronic processor, the second potential loop configuration responsive to a first source supplying the selected one of the plurality of tie-in isolation devices and the downstream isolation device associated with the selected one of the plurality of tie-in isolation devices.

### Claim 15 (depends on 13)

The method of claim 13, comprising:
identifying, via the electronic processor, a processing exception responsive to the downstream isolation device associated with a selected one of the plurality of tie-in isolation devices failing to execute the second open command after the selected tie-in isolation device executes the close command; and
sending, via the electronic processor, a third open command to the selected one of the plurality of tie-in isolation devices for each of the plurality of phases responsive to identifying the processing exception.

### Claim 16 (depends on 11)

The method of claim 11, comprising:
identifying, via the electronic processor, a processing exception associated with the sending of the first open command, the close command, or the second open command; and
generating, via the electronic processor, an exception report indicating the processing exception and uncompleted steps associated with the processing of the first fault indication.

### Claim 17 (depends on 11)

The method of claim 11, comprising:
identifying, via the electronic processor, an upstream isolation device upstream of the fault; and
responsive to the first isolation device not being the upstream isolation device, sending, via the electronic processor, a close command to the first isolation device for each phase in the first subset.

### Claim 18 (depends on 11)

The method of claim 11, comprising:
sending, via the electronic processor, the close command to the tie-in isolation device by sending a ganged close command to concurrently close all of the phases of the tie-in isolation device.

### Claim 19 (depends on 11)

The method of claim 11, wherein the fault comprises a lockout fault that results in the first isolation device opening the first subset of the plurality of phases.

### Claim 20 (depends on 11)

The method of claim 11, wherein the fault comprises a loss of voltage fault.