Assurance module
AssigneeRockwell Collins, Inc.
InventorsLeonardo Mangeruca, Marco Marazza, Stefano Minopoli
Life of this patent
Estimating the term…
Loading patent…
AssigneeRockwell Collins, Inc.
InventorsLeonardo Mangeruca, Marco Marazza, Stefano Minopoli
Estimating the term…
A run-time assurance module (6) comprises a contingency planner (26) arranged to generate an initial contingency plan having an associated safety-critical decision point, where the initial contingency plan (ICP) is stored as a current contingency plan in a memory (30). The assurance module (6) receives a mission plan (MP) from a mission planner (4). When the mission plan (MP) is being carried out, the contingency planner (26) processes at least one condition input, and generates a new contingency plan (NCP) based on the condition input. When the new contingency plan (NCP) satisfies a safety criterion and the safety-critical decision point associated with the new contingency plan (NCP) will occur later in time than the safety-critical decision point associated with the current contingency plan (CCP), the new contingency plan (NCP) is stored in the memory (30) as the current contingency plan (CCP).
A run-time assurance module comprising:
A method of mission planning for an aerospace application, the method comprising:
A non-transitory computer-readable medium comprising instructions that, when executed by a processor, cause the processor to carry out a method of mission planning for an aerospace application, the method comprising:
Dependencies are inferred from the claim text.