# US 2022/0019494 A1 · Failure impact analysis of network events

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0019494 A1
- Document ID: US20220019494A1
- Status: Published application
- Kind: A1
- Application number: 16/946,994
- Filed: 2020-07-14
- Published: 2022-01-20
- Earliest claimed: 2020-07-14
- Assignees: Juniper Networks, Inc.
- Applicants: Juniper Networks, Inc.
- Inventors: Jayanthi R; Javier Antich; Chandrasekhar A
- Web page: https://patentgrep.com/patent/US20220019494A1

## CPC

- H04L 41/0636: {based on a decision tree analysis}
- G06F 11/0709: {in a distributed system consisting of a plurality of standalone computer nodes, e.g. clusters, client-server systems}
- G06F 11/0751: {Error or fault detection not based on redundancy (power supply failures G06F1/30; network fault management H04L41/06)}
- G06F 11/079: {Root cause analysis, i.e. error or fault diagnosis (in a hardware test environment G06F11/22; in a software test environment G06F11/36)}
- H04L 41/145: {involving simulating, designing, planning or modelling of a network}
- H04L 41/149: for prediction of maintenance
- H04L 41/22: comprising specially adapted graphical user interfaces [GUI]
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Failure impact analysis (or “impact analysis”) is a process that involves identifying effects of a network event that are may or will results from the network event. In one example, this disclosure describes a method that includes generating, by a control system managing a resource group, a resource graph that models resource and event dependencies between a plurality of resources within the resource group; detecting, by the control system, a first event affecting a first resource of the plurality of resources, wherein the first event is a network event; and identifying, by the control system and based on the dependencies modeled by the resource graph, a second resource that is expected to be affected by the first event.

## Claims

### Claim at position 1

1: A method comprising:
generating, by a control system managing a resource group, a resource graph that models resource and event dependencies between a plurality of resources within the resource group;
detecting, by the control system, a first event affecting a first resource of the plurality of resources, wherein the first event is a network event;
identifying, by the control system and based on the dependencies modeled by the resource graph, a second resource that is expected to be affected by the first event wherein identifying the second resource includes:
generating, based on the dependencies modeled by the resource graph, a second event caused by the first event, wherein the second event is a logical event, and
identifying the second resource as a resource associated with the second event:
detecting, by the control system and after generating the second event, a third event affecting the second resource, wherein the third event is a network event; and
merging, by the control system, the third event into the second event to avoid duplicative processing associated with the third event.

### Claim 2

(canceled)

### Claim at position 3 (depends on 1)

3: The method of claim 1, further comprising:
identifying, by the control system and based on the dependencies modeled by the resource graph, a third resource that is expected to be affected by the first event.

### Claim at position 4 (depends on 3)

4: The method of claim 3, wherein identifying the third resource includes:
generating, based on the dependencies modeled by the resource graph, a fourth event caused by the second event, wherein the fourth event is a logical event; and
identifying the third resource as a resource associated with the fourth event.

### Claim at position 5 (depends on 1)

5: The method of claim 1, wherein generating the second event includes:
determining that the second resource has both resource and event dependencies on the first resource.

### Claim 6

(canceled)

### Claim at position 7 (depends on 1)

7: The method of claim 1, further comprising:
detecting, by the control system and before generating the second event, a fourth id event affecting the second resource, wherein the fourth event is a network event; and
merging, by the control system and after generating the second event, the second event into the fourth event.

### Claim at position 8 (depends on 1)

8: The method of claim 1, further comprising:
applying, by the control system, the resource graph to generate a plurality of inference rules with respect to the plurality of resources modeled by the resource graph.

### Claim at position 9 (depends on 1)

9: The method of claim 1, further comprising:
performing, by the control system, a forward chaining analysis to identify the second resource.

### Claim at position 10 (depends on 1)

10: The method of claim 1, wherein generating the resource graph includes:
receiving programming input; and
generating the resource graph based on the programming input.

### Claim at position 11 (depends on 1)

11: The method of claim 1, wherein generating the resource graph includes:
applying temporal constraints to each of the dependencies modeled by the resource graph.

### Claim at position 12

12: A system comprising:
a network including a plurality of resources; and
a controller capable of communicating with each of the plurality of resources and configured to:
generate a resource graph that models resource and event dependencies between a plurality of resources within the resource group,
detect a first event affecting a first resource of the plurality of resources, wherein the first event is a network event,
identify, based on the dependencies modeled by the resource graph, a second resource that is expected to be affected by the first event, wherein to identify the second resource, the controller is further configured to:
generate, based on the dependencies modeled by the resource graph, a second event caused by the first event, wherein the second event is a logical event, and
identify the second resource as a resource associated with the second event,
detect, after generating the second event, a third event affecting the second resource, wherein the third event is a network event, and
merge the third event into the second event to avoid duplicative processing associated with the third event.

### Claim 13

(canceled)

### Claim at position 14 (depends on 12)

14: The system of claim 12, wherein the controller is further configured to:
identify, based on the dependencies modeled by the resource graph, a third resource that is expected to be affected by the first event.

### Claim at position 15 (depends on 14)

15: The system of claim 14, wherein to identify the third resource, the controller is further configured to:
generate, by applying the dependencies modeled by the resource graph, a fourth event caused by the second event, wherein the fourth event is a logical event; and
identify the third resource as a resource associated with the fourth event.

### Claim at position 16 (depends on 12)

16: The system of claim 12, wherein to generate the second event, the controller is further configured to:
determine that the second resource has both resource and event dependencies on the first resource.

### Claim 17

(canceled)

### Claim at position 18 (depends on 2)

18: The system of claim 2, wherein the controller is further configured to:
detect, before generating the second event, a third event affecting the second resource, wherein the third event is a network event; and
merge, after generating the second event, the second event into the third event.

### Claim at position 19 (depends on 12)

19: The system of claim 12, wherein the controller is further configured to comprising:
apply the resource graph to generate a plurality of inference rules with respect to the plurality of resources modeled by the resource graph.

### Claim at position 20

20: A non-transitory computer-readable storage medium comprising instructions that, when executed, configure processing circuitry of a computing system to:
generate a resource graph that models resource and event dependencies between a plurality of resources within the resource group;
detect a first event affecting a first resource of the plurality of resources, wherein the first event is a network event;
identify, based on the dependencies modeled by the resource graph, a second resource that is expected to be affected by the first event, wherein to identify the second resource, the processing circuitry is further configured to:
generate, based on the dependencies modeled by the resource graph, a second event caused by the first event, wherein the second event is a logical event, and
identify the second resource as a resource associated with the second event,
detect, after generating the second event, a third event affecting the second resource, wherein the third event is a network event; and
merge the third event into the second event to avoid duplicative processing associated with the third event.
