# US 2022/0012648 A1 · Information processor, information processing method, and non-temporary storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0012648 A1
- Document ID: US20220012648A1
- Status: Published application
- Kind: A1
- Application number: 17/369,269
- Filed: 2021-07-07
- Published: 2022-01-13
- Earliest claimed: 2020-07-08
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Naoki Uenoyama; Hideo Hasegawa; Yuya Kokubun; Kaede Abe
- Web page: https://patentgrep.com/patent/US20220012648A1

## CPC

- B60L 53/65: involving identification of vehicles or their battery types
- G06Q 10/02: Reservations, e.g. for tickets, services or events
- B60L 53/665: {Methods related to measuring, billing or payment}
- B60L 58/12: responding to state of charge [SoC]
- B60L 58/13: Maintaining the SoC within a determined range
- G06Q 10/0283: {for travel seating}
- G06Q 10/06314: {Calendaring for a resource}
- B60L 2240/622: by satellite navigation
- B60L 2240/80: Time limits
- B60L 2250/16: by display
- B60L 2260/50: by future state prediction
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 10/72: Electric energy management in electromobility
- Y02T 90/12: Electric charging stations
- Y02T 90/16: Information or communication technologies improving the operation of electric vehicles
- Y02T 90/167: Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
- Y04S 30/14: Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The present disclosure provides a technique of efficiently managing the reservation of company vehicles. An information processor according to the, present disclosure includes a controller configured to acquire information on the usage state and the due date and time of the company vehicle having been lent, calculate a preparation time from the due date and time to a state in which the company vehicle is available, based on the information on the usage state of the company vehicle, and set an available date and time when the company vehicle after being returned is available, based on the due date and time and the preparation time.

## Claims

### Claim 1

An information processor for managing a company vehicle to be lent to an employee,
the information processor comprising a controller including at least one processor configured to perform:
acquiring information on a usage state and a due date and time of the company vehicle having been lent;
calculating a preparation time from the due date and time to a state in which the company vehicle is available, based on the information on the usage state of the company vehicle; and
setting an available date and time when the company vehicle after being returned is available, based on the due date and time and the preparation time.

### Claim 2 (depends on 1)

The information processor according to claim 1, wherein the usage state of the company vehicle includes information on a current position of the company vehicle and first remaining battery power as a current storage amount of a battery for driving a motor of the company vehicle, and
the controller calculates second remaining battery power as a predicted value of the storage amount of the battery at a time of return of the company vehicle based on the current position of the company vehicle and the first remaining battery power and calculates the preparation time based on the second remaining battery power.

### Claim 3 (depends on 2)

The information processor according to claim 2, wherein the controller further predicts an actual return date and time as an actual due date and time of the company vehicle based on the current position of the company vehicle, and
when the actual return date and time is delayed from the due date and time, the controller calculates the preparation time based on a delay of the actual return date and time from the due date and time in addition to the second remaining battery power.

### Claim 4 (depends on 2)

The information processor according to claim 2, wherein the controller further acquires information on a scheduled travel distance of a reserving user scheduled to borrow the company vehicle after the company vehicle is returned, and
calculates a battery required amount as a predicted storage amount of the battery necessary for driving the company vehicle for the scheduled travel distance, and
the controller calculates the preparation time based on the battery required amount in addition to the second remaining battery power.

### Claim 5 (depends on 4)

The information processor according to claim 4, wherein the controller sets the preparation time at a predetermined minimum value when the second remaining battery power is at least the battery required amount, and
the controller calculates the preparation time such that the preparation time increases with an increase in a difference between the second remaining battery power and the battery required amount when the second remaining battery power is smaller than the battery required amount.

### Claim 6 (depends on 4)

The information processor according to claim 4, wherein the controller transmits proposal information to a terminal used by the reserving user when the available date and time is delayed from a start date and time of lending of the company vehicle, the start date and time being needed by the reserving user, the proposal information being transmitted as information for proposing a transporter as an alternative to the company vehicle.

### Claim 7 (depends on 6)

The information processor according to claim 6, wherein when a standby vehicle different from the company vehicle is available for the reserving user scheduled to borrow the company vehicle after the company vehicle is returned, the controller adds information on availability of the standby vehicle to the proposal information.

### Claim 8 (depends on 7)

The information processor according to claim 7, wherein when the standby vehicle is unavailable, the controller adds information for recommending use of a rental car to the proposal information.

### Claim 9

An information processing method for managing a company vehicle to be lent to an employee, the method causing a computer to perform steps of:
acquiring information on a usage state and a due date and time of the company vehicle having been lent;
calculating a preparation time from the due date and time to a state in which the company vehicle is available, based on the information on the usage state of the company vehicle; and
setting an available date and time when the company vehicle after being returned is available, based on the due date and time and the preparation time.

### Claim 10 (depends on 9)

The information processing method according to claim 9, wherein the usage state of the company vehicle includes information on a current position of the company vehicle and first remaining battery power as a current storage amount of a battery for driving a motor of the company vehicle, and in the step of calculating the preparation time, second remaining battery power is calculated as a predicted value of the storage amount of the battery at a time of return of the company vehicle based on the current position of the company vehicle and the first remaining battery power, and the preparation time is calculated based on the second remaining battery power.

### Claim 11 (depends on 10)

The information processing method according to claim 10, further comprising a step of predicting an actual return date and time as an actual due date and time of the company vehicle based on the current position of the company vehicle,
wherein in the step of calculating the preparation time, when the actual return date and time is delayed from the due date and time, the preparation time is calculated based on a delay of the actual return date and time from the due date and time in addition to the second remaining battery power.

### Claim 12 (depends on 10)

The information processing method according to claim 10, further comprising steps of:
acquiring information on a scheduled travel distance of a reserving user scheduled to borrow the company vehicle after the company vehicle is returned, and
calculating a battery required amount as a predicted battery storage amount for driving the company vehicle for the scheduled travel distance,
wherein in the step of calculating the preparation time, the preparation time is calculated based on the battery required amount in addition to the second remaining battery power.

### Claim 13 (depends on 12)

The information processing method according to claim 12, wherein in the step of calculating the preparation time,
the preparation time is set at a predetermined minimum value when the second remaining battery power is at least the battery required amount, and
when the second remaining battery power is smaller than the battery required amount, the preparation time is calculated such that that the preparation time increases with an increase in a difference between the second remaining battery power and the battery required amount.

### Claim 14 (depends on 12)

The information processing method according to claim 12, further comprising the step of transmitting proposal information to a terminal used by the reserving user when the available date and time is delayed from a start date and time of lending of the company vehicle, the start date and time being needed by the reserving user, the proposal information being transmitted as information for proposing a transporter as an alternative to the company vehicle.

### Claim 15 (depends on 14)

The information processing method according to claim 14, wherein when a standby vehicle different from the company vehicle is available for the reserving user scheduled to borrow the company vehicle after the company vehicle is returned, information on availability of the standby vehicle is added to the proposal information.

### Claim 16 (depends on 15)

The information processing method according to claim 15, wherein when the standby vehicle is unavailable, information for recommending use of a rental car is added to the proposal information.

### Claim 17

A non-temporary storage medium for storing an information processing program for managing a company vehicle to be lent to an employee, the information processing program causing a computer to perform steps of:
acquiring information on a usage state and a due date and time of the company vehicle having been lent
calculating a preparation time from the due date and time to a state in which the company vehicle is available, based on the information on the usage state of the company vehicle; and
setting an available date and time when the company vehicle after being returned is available, based on the due date and time and the preparation time.

### Claim 18 (depends on 17)

The non-temporary storage medium for storing an information processing program according to claim 17, wherein the usage state, of the company vehicle includes information on a current position of the company vehicle and first remaining battery power as a current storage amount of a battery for driving a motor of the company vehicle, and
in the step of calculating the preparation time, second remaining battery power is calculated as a predicted value of the storage amount of the battery at a time of return of the company vehicle based on the current position of the company vehicle and the first remaining battery power, and the preparation time is calculated based on the second remaining battery power.

### Claim 19 (depends on 18)

The non-temporary storage medium for storing an information processing program according to claim 18, the program further comprising a step of predicting an actual return date and time as an actual due date and time of the company vehicle based on the current position of the company vehicle,
wherein in the step of calculating the preparation time, when the actual return date and time is delayed from the due date and time, the preparation time is calculated based on a delay of the actual return date and time from the due date and time in addition to the second remaining battery power.

### Claim 20 (depends on 18)

The non-temporary storage medium for storing an information processing program according to claim 18, the program further comprising steps of:
acquiring information on a scheduled travel distance of a reserving user scheduled to borrow the company vehicle after the company vehicle is returned; and
calculating a battery required amount as a predicted storage amount of the battery required for driving the company vehicle for the scheduled travel distance,
wherein in the step of calculating the preparation time, the preparation time is calculated based on the battery required amount in addition to the second remaining battery power.
