# US 2022/0011738 A1 · Process management device, process management method, and process management program storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0011738 A1
- Document ID: US20220011738A1
- Status: Published application
- Kind: A1
- Application number: 17/289,563
- Filed: 2019-10-28
- Published: 2022-01-13
- Earliest claimed: 2018-11-01
- Assignees: NEC Corporation
- Applicants: NEC Corporation
- Inventors: Kenji ODA
- Web page: https://patentgrep.com/patent/US20220011738A1

## CPC

- G05B 19/406: characterised by monitoring or safety (G05B19/19 takes precedence)
- G05B 19/41875: {characterised by quality surveillance of production}
- G05B 23/0235: {based on a comparison with predetermined threshold or range, e.g. "classical methods", carried out during normal operation; threshold adaptation or choice; when or how to compare with the threshold}
- G05B 2219/31455: Monitor process status
- G05B 2219/37533: Real time processing of data acquisition, monitoring
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

An abnormality in a process is grasped and a clue for determining a cause is obtained quickly. A process management device includes: a monitoring data acquisition means, a process capability index calculation means, a process capability index transition curve calculation means, a separation determination means, a change information acquisition means, and a target change information output means. The process capability index transition curve calculation means calculates a process capability index transition curve. The separation determination means calculates a separation between a process capability index and the process capability index transition curve, and determines that the separation is abnormal when the separation is equal to or more than a predetermined threshold. The change information acquisition means acquires, when the separation is abnormal, change information representing a change regarding a process in a period from a time when an abnormality is detected to a predetermined time before the time.

## Claims

### Claim 1

A process management device comprising:
a memory storing instructions; and
one or more processors configured to execute the instructions to:
acquire monitoring data representing a state of a process;
calculate, from monitoring data of sections divided by a predetermined period or a predetermined number, a process capability index in the sections;
perform a regression analysis of a plurality of the process capability indices calculated in the sections, and calculate a process capability index transition curve representing a transition of the process capability indices in the sections and in a future;
calculate a separation between the process capability index calculated at a present time and the process capability index transition curve, and determining that the separation is abnormal when the separation is equal to or more than a predetermined threshold;
acquire, when the separation determination means has determined that the separation is abnormal, change information representing a change regarding the process in a period from a time when an abnormality is detected to a predetermined time before the time; and
output as target information the change information that is acquired.

### Claim 2 (depends on 1)

The process management device according to claim 1, wherein the process is a production process, and the monitoring data is data regarding production facilities related to the production process.

### Claim 3 (depends on 1)

The process management device according to claim 1, wherein the process is an inspection process, and the monitoring data is data regarding inspection facilities related to the inspection process.

### Claim 4 (depends on 1)

The process management device according to claim 1, wherein the change information includes at least one of person change information regarding a person, facility change information regarding facilities, material change information regarding a material, and method change information regarding a method.

### Claim 5 (depends on 1)

The process management device according to claim 1, wherein the process capability index is a process capability index (Cpk) in consideration of bias.

### Claim 6

A process management method comprising:
acquiring monitoring data representing a state of a process;
calculating, from monitoring data of sections divided by a predetermined period or a predetermined number, a process capability index in the sections;
performing a regression analysis of a plurality of the process capability indices calculated in the sections, and calculating a process capability index transition curve representing a transition of the process capability indices in the sections and in a future;
calculating a separation between the process capability index calculated at a present time and the process capability index transition curve;
determining that the separation is abnormal when the separation is equal to or more than a predetermined threshold;
acquiring, when it has been determined that the separation is abnormal, change information representing a change regarding the process in a period from a time when an abnormality is detected to a predetermined time before the time; and
outputting as target information the change information that is acquired.

### Claim 7 (depends on 6)

The process management method according to claim 6, wherein the change information includes at least one of person change information regarding a person, facility change information regarding facilities, material change information regarding a material, and method change information regarding a method.

### Claim 8 (depends on 6)

The process management method according to claim 6, wherein the process capability index is a process capability index (Cpk) in consideration of bias.

### Claim 9

A non-transitory computer-readable process management program storage medium storing a process management program for causing a computer to execute processing comprising:
a step of acquiring monitoring data representing a state of a process;
a step of calculating, from monitoring data of sections divided by a predetermined period or a predetermined number, a process capability index in the sections;
a step of performing a regression analysis of a plurality of the process capability indices calculated in the sections, and calculating a process capability index transition curve representing a transition of the process capability indices in the sections and in a future;
a step of calculating a separation between the process capability index calculated at a present time and the process capability index transition curve;
a step of determining that the separation is abnormal when the separation is equal to or more than a predetermined threshold;
a step of acquiring, when it has been determined that the separation is abnormal, change information representing a change regarding the process in a period from a time when an abnormality is detected to a predetermined time before the time; and
a step of outputting as target information the change information that is acquired.

### Claim 10 (depends on 9)

The non-transitory process management program storage medium according to claim 9, wherein the change information includes at least one of person change information regarding a person, facility change information regarding facilities, material change information regarding a material, and method change information regarding a method.
