# US 2022/0010678 A1 · Optimization of discrete fracture network (dfn) using streamlines and machine learning

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0010678 A1
- Document ID: US20220010678A1
- Status: Published application
- Kind: A1
- Application number: 16/922,769
- Filed: 2020-07-07
- Published: 2022-01-13
- Earliest claimed: 2020-07-07
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Anwar Rahim Awan; Otto E. Meza Camargo; Mustafa Amari; Marei Al-Garni
- Web page: https://patentgrep.com/patent/US20220010678A1

## CPC

- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B 49/0875: {determining specific fluid parameters}
- E21B 43/00: Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells (applicable only to water E03B)
- E21B 49/00: Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- G06N 3/04: Architecture, e.g. interconnection topology
- G06N 3/08: Learning methods
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B 2200/22: Fuzzy logic, artificial intelligence, neural networks or the like
- G01V 20/00: Geomodelling in general
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A methodology is provided to optimize the dynamic connectivity of a discrete fracture network (DFN) model of a subsurface reservoir against observed reservoir production measures using streamlines and machine learning. Adjustment of discrete fracture network properties of the reservoir is made locally and minimizes computer processing time spent in history matching. An iterative workflow identifies history match issues between measured and predicted or simulated water cut of reservoir produced fluids. Streamline analysis quantifies injector-producer communication and identifies reservoir grid block bundles that dominate dynamic response. A genetic algorithm updates discrete fracture network properties of the reservoir model to improve dynamic history match response.

## Claims

### Claim 1

A method of determining a location for drilling a well in a subsurface geological structure of a subsurface hydrocarbon reservoir having existing wells producing fluids comprising hydrocarbons and exhibiting water cut representing water mixed in the fluids being produced, the location being determined indicated by an optimized natural fracture network model of the reservoir, comprising the steps of:
(a) obtaining reservoir parameters representing properties of the subsurface reservoir for processing in a data processing system, the reservoir properties including observed cumulative water cut of the produced fluids during production from the existing wells;
(b) forming a proposed discrete fracture network model indicating the nature and extent of discrete fractures and fracture flow paths in the reservoir;
(c) performing a reservoir simulation history match from the obtained reservoir parameters to determine simulated cumulative water cut of the fluids;
(d) determining a measure of the difference between the determined simulated cumulative water cut from the performed reservoir simulation history match and the observed water cut of the produced hydrocarbon fluids from the existing wells;
(e) determining if the determined simulated cumulative water cut from the performed reservoir simulation history match matches specified production criteria;
(f) when the determined simulated cumulative water cut from the performed reservoir simulation history match does not match specified production criteria, determining an amount and type of water cut present in the determined simulated cumulative water cut from the performed reservoir simulation history match;
(g) adjusting the proposed discrete fracture network model by a genetic algorithm optimization to form another proposed discrete fracture network for optimization of the natural fracture network of the reservoir;
(h) performing streamline analysis of fluid flow in the reservoir based on the proposed discrete fracture network and the determined simulated cumulative water cut to identify the fracture flow paths for the fluids in the reservoir:
(i) returning to step (c) and repeating the processing to form another realization of a proposed discrete fracture network for continued processing, and
(j) when the determined cumulative water cut from the performed reservoir simulation history match satisfies the specified production criteria,
(1) adjusting the proposed discrete fracture network to conform to the optimized natural fracture network; and
(2) drilling the proposed well at the location indicated by the optimized natural fracture network.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of performing streamline analysis comprises the steps of:
(a) mapping streamlines between existing injector wells and producing wells in the reservoir; and
(b) recording locations in the reservoir model where streamlines are present.

### Claim 3 (depends on 1)

The method of claim 1, wherein the reservoir parameters further comprise reservoir geological model and observed reservoir production flow rates and pressures.

### Claim 4 (depends on 1)

The method of claim 1, wherein the specified production criteria comprises water cut being less than a specified percentage of cumulative fluid production from the reservoir.

### Claim 5 (depends on 5)

The method of claim 5, wherein the specified percentage of cumulative fluid production from the reservoir comprises about 2%.

### Claim 6 (depends on 1)

The method of claim 1, further including the step of forming a double porosity, double permeability model of the reservoir based on the form another proposed discrete fracture network.

### Claim 7 (depends on 1)

The method of claim 1, wherein the determined amount and type of water cut present comprises high water cut.

### Claim 8 (depends on 1)

The method of claim 1, wherein the determined amount and type of water cut present comprises low water cut.

### Claim 9 (depends on 1)

The method of claim 1, wherein the determined amount and type of water cut present comprises absence of water cut.

### Claim 10

A data processing system for determining a location for drilling a well in a subsurface geological structure of a subsurface hydrocarbon reservoir having existing wells producing fluids comprising hydrocarbons and exhibiting water cut representing water mixed in the fluids being produced, the location being determined indicated by an optimized natural fracture network model of the reservoir, comprising:
a memory storing computer operable program instructions to control the data processing system to optimize the natural fracture network;
a data input obtaining reservoir parameters representing properties of the subsurface reservoir for processing in a data processing system, the reservoir properties including observed cumulative water cut of the produced fluids during production from the existing wells;
a processor operating under the control of the stored computer operable program instructions and performing the steps of:
(a) forming a proposed discrete fracture network model indicating the nature and extent of discrete fractures and fracture flow paths in the reservoir;
(b) performing a reservoir simulation history match from the obtained reservoir parameters to determine simulated cumulative water cut of the fluids;
(c) determining a measure of the difference between the determined simulated cumulative water cut from the performed reservoir simulation history match and the observed water cut of the produced hydrocarbon fluids from the existing wells;
(d) determining if the determined simulated cumulative water cut from the performed reservoir simulation history match matches specified production criteria;
(e) when the determined simulated cumulative water cut from the performed reservoir simulation history match does not match specified production criteria, determining an amount and type of water cut present in the determined simulated cumulative water cut from the performed reservoir simulation history match;
(f) adjusting the proposed discrete fracture network model by a genetic algorithm optimization to form another proposed discrete fracture network for optimization of the natural fracture network of the reservoir;
(g) performing streamline analysis of fluid flow in the reservoir based on the proposed discrete fracture network and the determined simulated cumulative water cut to identify the fracture flow paths for the fluids in the reservoir;
(h) returning to step (b) and repeating the processing to form another realization of a proposed discrete fracture network for continued processing, and
(i) when the determined cumulative water cut from the performed reservoir simulation history match satisfies the specified production criteria, adjusting the proposed discrete fracture network to conform to the optimized natural fracture network for drilling the proposed well at the location indicated by the optimized natural fracture network.

### Claim 11 (depends on 10)

The data processing system of claim 10, wherein the step of performing streamline analysis comprises the steps of;
(a) mapping streamlines between existing injector wells and producing wells in the reservoir; and
(b) recording locations in the reservoir model where streamlines are present.

### Claim 12 (depends on 10)

The data processing system of claim 10, wherein the reservoir parameters further comprise reservoir geological model and observed reservoir production flow rates and pressures.

### Claim 13 (depends on 10)

The data processing system of claim 10, wherein the specified production criteria comprises water cut being less than a specified percentage of cumulative fluid production from the reservoir.

### Claim 14 (depends on 13)

The data processing system of claim 13 wherein the specified percentage of cumulative fluid production from the reservoir comprises about 2%.

### Claim 15 (depends on 10)

The data processing system of claim 10, wherein the processor further performs the step of forming a double porosity, double permeability model of the reservoir based on the form another proposed discrete fracture network.

### Claim 16 (depends on 10)

The data processing system of claim 10, wherein the determined amount and type of water cut present comprises high water cut.

### Claim 17 (depends on 10)

The data processing system of claim 10, wherein the determined amount and type of water cut present comprises low water cut.

### Claim 18 (depends on 10)

The data processing system of claim 10, wherein the determined amount and type of water cut present comprises absence of water cut.

### Claim 19

A computer implemented method of determining a location for drilling a well in a subsurface geological structure of a subsurface hydrocarbon reservoir having existing wells producing fluids comprising hydrocarbons and exhibiting water cut representing water mixed in the fluids being produced, the location being determined indicated by an optimized natural fracture network model of the reservoir, the method being performed in a data processing system comprising a memory, a processor and a reservoir simulation history match module, the computer implemented method comprising the steps of:
(a) storing in the data processing memory computer operable program instructions to control the data processing system to optimize the natural fracture network;
(b) obtaining reservoir parameters representing properties of the subsurface reservoir for processing in a data processing system, the reservoir properties including observed cumulative water cut of the produced fluids during production from the existing wells;
(c) forming a proposed discrete fracture network model indicating the nature and extent of discrete fractures and fracture flow paths in the reservoir;
(d) performing a reservoir simulation history match from the obtained reservoir parameters to determine simulated cumulative water cut of the fluids;
(e) determining a measure of the difference between the determined simulated cumulative water cut from the performed reservoir simulation history match and the observed water cut of the produced hydrocarbon fluids from the existing wells;
(f) determining if the determined simulated cumulative water cut from the performed reservoir simulation history match matches specified production criteria;
(g) when the determined simulated cumulative water cut from the performed reservoir simulation history match does not match specified production criteria, determining an amount and type of water cut present in the determined simulated cumulative water cut from the performed reservoir simulation history match;
(h) adjusting the proposed discrete fracture network model by a genetic algorithm optimization to form another proposed discrete fracture network for optimization of the natural fracture network of the reservoir;
(i) performing streamline analysis of fluid flow in the reservoir based on the proposed discrete fracture network and the determined simulated cumulative water cut to identify the fracture flow paths for the fluids in the reservoir;
(j) returning to step (d) and repeating the processing to form another realization of a proposed discrete fracture network for continued processing, and
(k) when the determined cumulative water cut from the performed reservoir simulation history match satisfies the specified production criteria, adjusting the proposed discrete fracture network to conform to the optimized natural fracture network for drilling the proposed well at the location indicated by the optimized natural fracture network

### Claim 20 (depends on 19)

The computer implemented method of claim 19, wherein the step of performing streamline analysis comprises the steps of:
(a) mapping streamlines between existing injector wells and producing wells in the reservoir; and
(b) recording locations in the reservoir model where streamlines are present.

### Claim 21 (depends on 19)

The computer implemented method of claim 19, wherein the reservoir parameters further comprise reservoir geological model and observed reservoir production flow rates and pressures.

### Claim 22 (depends on 19)

The computer implemented method of claim 19, wherein the specified production criteria comprises water cut being less than a specified percentage of cumulative fluid production from the reservoir.

### Claim 23 (depends on 23)

The computer implemented method of claim 23, wherein the specified percentage of cumulative fluid production from the reservoir comprises about 2%.

### Claim 24 (depends on 19)

The computer implemented method of claim 19, further including the step of forming a double porosity, double permeability model of the reservoir based on the form another proposed discrete fracture network.

### Claim 25 (depends on 19)

The computer implemented method of claim 19, wherein the determined amount and type of water cut present comprises high water cut.

### Claim 26 (depends on 19)

The computer implemented method of claim 19, wherein the determined amount and type of water cut present comprises low water cut.

### Claim 27 (depends on 19)

The computer implemented method of claim 19, wherein the determined amount and type of water cut present comprises absence of water cut.

### Claim 28

A data storage device having stored in a non-transitory computer readable medium computer operable instructions for causing a data processing system to determine a location for drilling a well in a subsurface geological structure of a subsurface hydrocarbon reservoir having existing wells producing fluids comprising hydrocarbons and exhibiting water cut representing water mixed in the fluids being produced, the location being determined indicated by an optimized natural fracture network model of the reservoir, the method being performed in a data processing system comprising a memory, a processor and a reservoir simulation history match module, the instructions stored in the data storage device causing the data processing system to perform the following steps:
(a) storing in the data processing memory computer operable program instructions to control the data processing system to optimize the natural fracture network;
(b) obtaining reservoir parameters representing properties of the subsurface reservoir for processing in a data processing system, the reservoir properties including observed cumulative water cut of the produced fluids during production from the existing wells;
(c) forming a proposed discrete fracture network model indicating the nature and extent of discrete fractures and fracture flow paths in the reservoir;
(d) performing a reservoir simulation history match from the obtained reservoir parameters to determine simulated cumulative water cut of the fluids;
(e) determining a measure of the difference between the determined simulated cumulative water cut from the performed reservoir simulation history match and the observed water cut of the produced hydrocarbon fluids from the existing wells;
(f) determining if the determined simulated cumulative water cut from the performed reservoir simulation history match matches specified production criteria;
(g) when the determined simulated cumulative water cut from the performed reservoir simulation history match does not match specified production criteria, determining an amount and type of water cut present in the determined simulated cumulative water cut from the performed reservoir simulation history match;
(h) adjusting the proposed discrete fracture network model by a genetic algorithm optimization to form another proposed discrete fracture network for optimization of the natural fracture network of the reservoir;
(i) performing streamline analysis of fluid flow in the reservoir based on the proposed discrete fracture network and the determined simulated cumulative water cut to identify the fracture flow paths for the fluids in the reservoir;
(j) returning to step (d) and repeating the processing to form another realization of a proposed discrete fracture network for continued processing, and
(k) when the determined cumulative water cut from the performed reservoir simulation history match satisfies the specified production criteria, adjusting the proposed discrete fracture network to conform to the optimized natural fracture network for drilling the proposed well at the location indicated by the optimized natural fracture network.

### Claim 29 (depends on 28)

The data storage device of claim 28, wherein the stored instructions for performing streamline analysis comprise instructions for performing steps of:
(a) mapping streamlines between existing injector wells and producing wells in the reservoir; and
(b) recording locations in the reservoir model where streamlines are present.

### Claim 30 (depends on 28)

The data storage device of claim 28, wherein the obtained reservoir parameters further comprise reservoir geological model and observed reservoir production flow rates and pressures.

### Claim 31 (depends on 28)

The data storage device of claim 28, wherein the specified production criteria comprises water cut being less than a specified percentage of cumulative fluid production from the reservoir.

### Claim 32 (depends on 31)

The data storage device of claim 31, wherein the specified percentage of cumulative fluid production from the reservoir comprises about 2%.

### Claim 33 (depends on 28)

The data storage device of claim 28, wherein the stored instructions further include instructions for performing the step of forming a double porosity, double permeability model of the reservoir based on the form another proposed discrete fracture network.

### Claim 34 (depends on 28)

The data storage device of claim 28, wherein the determined amount and type of water cut present comprises high water cut.

### Claim 35 (depends on 28)

The data storage device of claim 28, wherein the determined amount and type of water cut present comprises low water cut.

### Claim 36 (depends on 28)

The data storage device of claim 28, wherein the determined amount and type of water cut present comprises absence of water cut.
