# US 2022/0010676 A1 · System and method of intelligent electrical completion in reservoirs that allow open-hole completion

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0010676 A1
- Document ID: US20220010676A1
- Status: Published application
- Kind: A1
- Application number: 17/368,910
- Filed: 2021-07-07
- Published: 2022-01-13
- Earliest claimed: 2020-07-07
- Assignees: Petroleo Brasileiro S.A. - Petrobras
- Applicants: Petróleo Brasileiro S.A. - Petrobrás
- Inventors: Manoel Feliciano da Silva Junior; Marcello Marques; Fabio Rosas Gutterres; Eduardo Schnitzler; Luciano Ferreira Goncalez
- Web page: https://patentgrep.com/patent/US20220010676A1

## CPC

- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B 23/06: for setting packers
- E21B 34/04: in underwater well heads
- E21B 34/06: in wells
- E21B 43/14: Obtaining from a multiple-zone well
- E21B 43/25: Methods for stimulating production {(by vibrating earth formations E21B43/003)}
- E21B 47/06: Measuring temperature or pressure
- E21B 47/13: by electromagnetic energy, e.g. radio frequency
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The present invention relates to a system and method to be applied to multiple inflow and outflow control zones in an open-hole uncoupled completion. The invention can handle, for example, the complexities and limitations of hydraulic control found in carbonate reservoirs in the Brazilian Pre-Salt, which are characterized by high pressures and flows, large vertical extensions of the reservoir, high scaling potential, and high potential for losses during drilling and completion operations.

## Claims

### Claim at position 1

-14. (canceled)

### Claim 15

An electrical intelligent completion system, comprising:
a supervision and control system (SCS);
a telemetry and control cystem (TCS);
a proximity coupler (PC);
a flow control system (FCS); and
a well monitoring system (WMS).

### Claim 16 (depends on 15)

The system of claim 15, wherein the SCS is a distributed control system on a fault-tolerant automation network.

### Claim 17 (depends on 15)

The system of claim 15, wherein the SCS is formed by a set of power-over-communication modems, of the point-multipoint type, from the surface to the completion subsea control module (COMP-SCM).

### Claim 18 (depends on 15)

The system of claim 15, wherein the SCS provides electricity supply and communication of nodes of a transparent network to a subsea physical layout.

### Claim 19 (depends on 17)

The system of claim 17, wherein the COMP-SCM serves as an intelligent repeater that allows control and data access of the system in an event of failure in an umbilical or in the Electro-Hydraulic Distribution Unit (EHDU).

### Claim 20 (depends on 15)

The system of claim 15, wherein the TCS comprises a workover TCS equipped with a wireless telemetry module, battery module and top module of the PC.

### Claim 21 (depends on 15)

The system of claim 15, wherein the TCS serves as an intelligent gateway that allows control and data access and conversion of a network into an industry standard network.

### Claim 22 (depends on 15)

The system of claim 15, wherein the PC allows an uncoupled lower completion.

### Claim 23 (depends on 15)

The system of claim 15, wherein the PC allows electrical supply and communication during installation and re-entry of an intelligent electrical completion.

### Claim 24 (depends on 15)

The system of claim 15, wherein the FCS is a valve actuated by an Axial Flux Permanent Magnet (AFPM) spiral motor.

### Claim 25 (depends on 24)

The system of claim 24, wherein the AFPM spiral motor allows control of a valve position through helical movement of a cage-type valve or a ball-type valve.

### Claim 26 (depends on 15)

The system of claim 15, wherein the WMS has spot or almost-distributed pressure and temperature sensors.

### Claim 27 (depends on 15)

A method of intelligent completion in with the system defined in claim 15, the method comprising:
lowering a working column with a running tool, workover TCS (TCS+upper proximity coupler (PC)+wireless telemetry module (WTM)+battery module (BM)) and lower completion with a lower PC with open valves;
closing intelligent completion valves (ICVs) upon actuation via the workover TCS or a proximity telemetry module (PTM);
seating packer feedthrough and expandable open hole packers against the running tool and valves;
performing a packer feedthrough integrity test;
performing an integrity test on expandable packers;
closing ICVs and testing for tightness;
releasing the running tool with the workover TCS;
removing the working column;
lowering superior completion with an upper PC and an electrical expansion joint (EEJ);
seating and locking the upper PC;
releasing the EEJ;
seating and locking a tubing hanger (TH) and performing TH and production column/injection column tests;
opening a lower ICV of the ICVs;
performing a lower zone stimulation;
closing the lower ICV of the ICVs and opening a lower intermediate ICV of the ICVs;
performing stimulation of a lower intermediate zone;
closing the lower intermediate ICV and opening an upper intermediate ICV of the ICVs;
performing stimulation of an upper intermediate zone;
closing the upper intermediate ICV and opening an upper ICV of the ICVs;
performing an upper zone stimulation;
closing and testing the ICVs and a downhole safety valve (DHSV); and
abandoning well to a subsea equipment support vessel (SESV) and installing a wet christmas tree (WCT).

### Claim 28 (depends on 27)

The method of claim 27, further comprising positioning a chelator or weak acid in an open hole.

### Claim 29 (depends on 27)

The method of claim 27, wherein the step of performing the integrity test comprises monitoring, via intelligent completion pressure and temperature sensors, a differential fall-off.

### Claim 30 (depends on 27)

The method of claim 27, wherein the step of perfoming the integrity test further comprises opening ICVs and injecting into reserviors.

### Claim 31 (depends on 15)

A method of intelligent completion in with the system defined in claim 15, the method comprising:
lowering a production column/injection column with open intelligent completion valves (ICVs);
seating and locking tubing hanger (TH) and performing TH and production column/injection column tests;
closing the ICVs;
seating a feedthrough packer and expandable open hole packers;
performing an integrity test on the expandable packers;
opening a lower ICV of the ICVs;
performing a lower zone stimulation;
closing the lower ICV of the ICVs and opening a lower intermediate ICV of the ICVs;
performing stimulation of the lower intermediate zone;
closing the lower intermediate ICV and opening an upper intermediate ICV of the ICVs;
performing stimulation of an upper intermediate zone;
closing the upper intermediate ICV and opening an upper ICV of the ICVs;
performing an upper zone stimulation;
closing and testing the ICVs and a downhole safety valve (DHSV); and
abandoning well to a subsea equipment support vessel (SESV) and installing a wet christmas tree (WCT).

### Claim 32 (depends on 31)

The method of claim 31, further comprising positioning a chelator or weak acid in an open hole.

### Claim 33 (depends on 31)

The method of claim 31, wherein the step of performing the integrity test comprises monitoring, via intelligent completion pressure and temperature sensors, a differential fall-off.

### Claim 34 (depends on 31)

The method of claim 31, wherein the step of perfoming the integrity test further comprises opening ICVs and injecting into reserviors.