# US 2022/0010664 A1 · Method for injecting fluid into a formation to produce oil

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0010664 A1
- Document ID: US20220010664A1
- Status: Published application
- Kind: A1
- Application number: 17/130,784
- Filed: 2020-12-22
- Published: 2022-01-13
- Earliest claimed: 2015-07-28
- Assignees: NCS Multistage Inc.
- Applicants: Ncs Multistage, LLC
- Inventors: WARREN FOSTER PETER MacPHAIL; WOLFGANG FRIEDRICH JOHANN DEEG
- Web page: https://patentgrep.com/patent/US20220010664A1

## CPC

- E21B 43/16: Enhanced recovery methods for obtaining hydrocarbons
- E21B 17/1035: {for plural rods, pipes or lines, e.g. for control lines}
- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- E21B 34/10: operated by control fluid supplied from outside the borehole
- E21B 43/12: Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00)
- E21B 43/14: Obtaining from a multiple-zone well
- E21B 43/26: by forming crevices or fractures
- E21B 17/20: Flexible or articulated drilling pipes {, e.g. flexible or articulated rods, pipes or cables}
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 33/134: Bridging plugs
- E21B 33/138: Plastering the borehole wall; Injecting into the formation
- E21B 43/114: Perforators using direct fluid action {on the wall to be perforated}, e.g. abrasive jets
- E21B 43/38: in the well
- E21B 2200/06: Sleeve valves
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method and system for enhancing petroleum production are provided, in which a fracturing operation can be conducted in a formation through a string and then petroleum is displaced from the fractured formation by selectively injecting fluid into selected fractures in the formation while other non-selected fractures remain without fluid injection. The injected fluid flows out into the fractured formation and enhances recovery from the non-selected fractures. Petroleum is selectively collected from the non-selected fractures.

## Claims

### Claim 1

A method for petroleum production from a well having a well section with a wellbore inner surface in communication with a formation containing reservoir fluid, the method comprising: creating a first set of zones and a second set of zones in the well section accessed through a string, the first set of zones being fluidly sealed from communication through an annulus in the wellbore to the second set of zones in the well section; injecting fracturing fluid through the string into each of the first set of zones and the second set of zones to fracture the formation; and selectively injecting injection fluid through the string into the formation via a selected first zone in the first set of zones.

### Claim 2 (depends on 1)

The method of claim 1 wherein: creating a first set of zones creates a plurality of injection zones in the well section, each injection zone for communicating fluid between an injection conduit and the formation; creating a second set of zones creates a plurality of production zones in the well section, each production zone for communicating fluid between the formation and a production conduit, each production zone being fluidly sealed from the injection zones inside the well section; and further comprising selectively collecting reservoir fluid from the formation via at least one of the production zones; and transporting the collected reservoir fluid to surface.

### Claim 3 (depends on 1)

The method of claim 1 wherein a string is installed in the well section, the string having a production conduit and an injection conduit extending parallel to but fluidly separated from the production conduit and wherein:
injecting injects fracturing fluid down the string and into the selected first zone and a selected second zone of the second set of zones; and
selectively injecting injects fluid through the injection conduit into the selected first zone; and, further comprising:
allowing production from the formation into the production conduit.

### Claim 4 (depends on 3)

The method of claim 3 wherein injecting injects fracturing fluid down each of the injection conduit and the production conduit.

### Claim 5 (depends on 3)

The method of claim 3 wherein injecting injects fracturing fluid through the production conduit to access both the selected first zone and the selected second zone and before selectively injecting, access between the production conduit and the selected first zone is closed.

### Claim 6 (depends on 3)

The method of claim 3 wherein the string further includes an injection flow regulator capable of providing flow from the injection conduit into the annulus in the selected first zone in the first set of zones and a production flow regulator axially distanced along the string from the injection flow regulator and the production flow regulator capable of permitting flow between the production conduit and the annulus in the selected second zone, injecting injects fracturing fluid down the string and out through fracturing ports of the injection flow regulators and ports of the production flow regulators to generate fractures in the formation via the fracturing ports and the ports.

### Claim 7 (depends on 6)

The method of claim 6 wherein the fracturing ports of the injection flow regulator are configured to provide flow from the production conduit into the annulus in the selected first zone in the first set of zones and injecting injects fracturing fluid down the production conduit of the string and out through the fracturing ports of the injection flow regulators and ports of the production flow regulators to generate fractures in the formation via the fracturing ports and the ports; and closing the fracturing ports of the injection flow regulators to restrict fluid communication between the production conduit and the formation via the injection flow regulators.

### Claim 8 (depends on 6)

The method of claim 6 further comprising allowing flow back of fluid from the formation in the production conduit via the fracturing ports of the injection flow regulators and the ports of the production flow regulators.

### Claim 9 (depends on 6)

The method of claim 6 further comprising after injecting, opening injection ports in the injection flow regulators to open fluid communication between the injection conduit and the annulus, thereby permitting selectively injecting.

### Claim 10 (depends on 3)

The method of claim 3 further comprising cementing the well section to fill the annulus with cement about the injection conduit and the production conduit.

### Claim 11 (depends on 1)

The method of claim 1 wherein injecting includes staged fracturing wherein fracturing proceeds through some of the first set of zones before fracturing through one or more zones in the first or second set of zones.

### Claim 12

A system for petroleum production from a wellbore defined within a wellbore wall in communication with a formation containing reservoir fluid, the system comprising: a well installation including an injection conduit extending inside the wellbore; and a production conduit extending inside the wellbore;
an injection zone in the wellbore in fluid communication with an injection passage of the injection conduit;
a production zone in the wellbore in fluid communication with a production passage inside the production conduit, the production zone being fluidly sealed from the injection zone inside the wellbore;
a preformed hydraulic fracturing port in the injection zone; and
a preformed port on the production conduit configured to permit fracturing of the production zone.

### Claim 13 (depends on 12)

The system of claim 12 wherein the preformed hydraulic fracturing port is on the production conduit and includes a closure for closing the preformed hydraulic fracturing port and further comprising an injection port on the injection conduit configured to permit injection of fluids into the injection zone.

### Claim 14 (depends on 12)

The system of claim 12 further comprising at least one injection flow regulator in association with the at least one injection zone, the at least one injection flow regulator having a hydraulic fracturing configuration which allows fluid communication through the preformed hydraulic fracturing port between the production conduit and the wellbore wall in the injection zone and an injection configuration which allows fluid communication between the injection conduit and the wellbore wall in the at least one injection zone, while the fluid communication between the production conduit and the wellbore wall in the injection zone is stopped; and at least one production flow regulator in the production zone, the at least one production flow regulator having an open configuration which allows fluid communication through the preformed port between the production conduit and the wellbore wall in the production zone.

### Claim 15 (depends on 12)

The system of claim 12 further comprising clamps engaging the injection conduit to the production conduit.

### Claim 16 (depends on 12)

The system of claim 12 further comprising an actuator tool to manipulate the preformed hydraulic fracturing port and the preformed port.

### Claim 17

A wellbore string for installation in a wellbore defined within a wellbore wall in communication with a formation containing reservoir fluid, the wellbore string comprising:
an injection conduit;
a production conduit extending parallel to the injection conduit but fluidly isolated from the injection conduit, the production conduit having a wall with an outer wall surface and defining a production conduit fluid passage;
at least one injection flow regulator connected into the string and including: an outer surface, an injection passage through which the injection conduit passes, a preformed port for providing fluid communication through the preformed port to the outer surface, and a closure for the preformed port configured for manipulation by a fracturing actuator tool; and
at least one production flow regulator connected into the string and axially offset along the string from the at least one injection flow regulator and including: an exterior surface, an injection bore through which the injection conduit extends, a production bore connected in communication with the production conduit fluid passage, and a production port for providing fluid communication between the production bore and the exterior surface.

### Claim 18 (depends on 17)

The wellbore string of claim 17 wherein the preformed port opens from the injection passage to the outer surface.

### Claim 19 (depends on 18)

The wellbore string of claim 18 wherein the production conduit has an outer diameter and the injection conduit has a diameter across its outer surface similar to the outer diameter.

### Claim 20 (depends on 18)

The wellbore string of claim 18 wherein each of the injection conduit and the production conduit have an outer diameter of greater than 2 inches.

### Claim 21 (depends on 17)

The wellbore string of claim 17 further comprising a production passage through which the production conduit fluid passage extends and wherein the preformed port opens from the production passage to the outer surface and further comprising an injection port for providing fluid communication between the injection passage and the outer surface.

### Claim 22 (depends on 21)

The wellbore string of claim 21 wherein the at least one injection flow regulator has a hydraulic fracturing configuration which allows fluid flow through the fracturing port and an injection configuration which allows fluid flow through the injection port, while the fracturing port is closed.

### Claim 23 (depends on 21)

The wellbore string of claim 21 wherein in the hydraulic fracturing configuration, the injection port is closed.

### Claim 24 (depends on 21)

The wellbore string of claim 21 wherein the at least one production flow regulator includes an open configuration which allows fluid flow through the production port.

### Claim 25 (depends on 17)

The wellbore string of claim 17 further comprising clamps engaging the injection conduit to the production conduit.
