# US 2022/0010500 A1 · High Strength Porous Cement-Based Materials

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0010500 A1
- Document ID: US20220010500A1
- Status: Published application
- Kind: A1
- Application number: 17/293,314
- Filed: 2019-11-13
- Published: 2022-01-13
- Earliest claimed: 2018-11-13
- Assignees: Imperial College Innovations Limited
- Applicants: Imperial College of Science, Technology and Medicine
- Inventors: Alalea Kia; Hong S. Wong; Christopher R. Cheeseman
- Web page: https://patentgrep.com/patent/US20220010500A1

## CPC

- E01C 11/225: {Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage (E01C9/004, E01C9/008, E01C9/08, E01C9/10, E01C11/228, E01C13/00 take precedence)}
- E01C 5/065: {characterised by their structure or component materials, e.g. concrete layers of different structure, special additives}
- E01C 2201/20: Drainage details
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)

## Abstract

Method of forming a cement-based material pad (3) comprising a plurality of drainage holes and forms for use in such a method.

## Claims

### Claim 1

A method of forming a cement-based material pad comprising a plurality of drainage holes, the method comprising:
providing a form comprising a sheet and a plurality of straight conduits, each conduit having an upper end and a lower end, wherein each conduit has a constant cross-section and forms a channel from the upper end to the lower end that passes through the sheet; and the form being an open-top form whereby a cement-based material can be poured onto the sheet to surround the conduits;
placing said form; and
pouring a cement-based material into said form until the cement-based material surrounds the conduits, leaving the upper ends of the conduits exposed.

### Claim 2 (depends on 1)

The method of claim 1, wherein each of the plurality of conduits are arranged substantially perpendicular to the sheet and/or wherein each of the plurality of conduits are arranged parallel to one another.

### Claim 3 (depends on 1)

The method of claim 1, wherein the sheet is a flexible sheet.

### Claim 4 (depends on 1)

The method of claim 1, wherein the sheet and the lower end of the conduits are adjacent.

### Claim 5 (depends on 1)

The method of claim 1, wherein the form further comprises a connecting means holding each of the plurality of conduits parallel to one another and wherein when the cement-based material is poured onto the sheet to surround the conduits, the upper ends of the conduits and the connecting means are left exposed.

### Claim 6

A method of forming a cement-based material pad comprising a plurality of drainage holes, the method comprising:
providing a form comprising a plurality of parallel pins each having a shaft, a head and a pointed end; a connecting means configured to hold the plurality of pins parallel to each other, wherein the connecting means connects the head of each of the plurality of parallel pins; a plurality of straight conduits, each having an upper end and a lower end; wherein each conduit has a constant cross-section and receives one of the plurality of parallel pins such that the pointed ends of each of the plurality of parallel pins extend beyond the lower end of each conduit; whereby a cement-based material can be poured to surround the conduits;
placing said form; and
pouring a cement-based material into said form until the cement-based material surrounds the conduits, leaving the upper ends of the conduits exposed.

### Claim 7 (depends on 6)

The method of claim 6, wherein the cement-based material pad is to be formed on a surface and the step of placing said form comprises placing said form such that the pointed ends of each of the parallel pins penetrate the surface to anchor the form.

### Claim 8 (depends on 6)

The method of claim 6, wherein each of the pointed ends of each of the parallel pins extends beyond the lower end of each conduit so as to seal the lower end of the conduit.

### Claim 9 (depends on 6)

The method of claim 6, wherein the connecting means extends substantially perpendicular from each of the plurality of parallel pins.

### Claim 10 (depends on 6)

The method of claim 6, wherein each conduit reversibly receives one of the plurality of parallel pins.

### Claim 11

(canceled)

### Claim 12 (depends on 10)

The method of claim 10, wherein each of the plurality of conduits independently has a diameter of about 1 to about 20 mm.

### Claim 13 (depends on 1)

The method of claim 1, wherein each of the plurality of conduits and/or the sheet is formed from plastic or a biodegradable material.

### Claim 14 (depends on 1)

The method of claim 1, wherein the form further comprises side walls to contain the cement-based material.

### Claim 15 (depends on 1)

The method of claim 1 further comprising the step of setting the cement-based material.

### Claim 16 (depends on 1)

The method of claim 1 further comprising the step of removing the plurality of pins from each of said conduits.

### Claim 17 (depends on 1)

The method of claim 1 further comprising the step of trimming a portion of each of the plurality of conduits exposed from the cement-based material.

### Claim 18 (depends on 1)

The method of claim 1 wherein the plurality of conduits are arranged such that a cement-based material pad having porosity of about 1 to about 50% is formed.

### Claim 19

(canceled)

### Claim 20 (depends on 1)

The method of claim 1 wherein the method is carried out on site.

### Claim 21

(canceled)

### Claim 22

(canceled)

### Claim 23

(canceled)

### Claim 24

(canceled)

### Claim 25

(canceled)

### Claim 26 (depends on 1)

The method of claim 1 wherein the cement-based material pad formed from the method has a compressive strength of about 50 MPa or greater.

### Claim 27

A form for use in producing a cement-based material pad comprising a plurality of drainage holes, the form being selected from
a) a form comprising:
a sheet; and
a plurality of straight conduits, each having an upper end and a lower end;
wherein each conduit has a constant cross-section and forms a channel from the upper end to the lower end that passes through the sheet; and the form being an open-top form whereby a cement-based material can be poured onto the sheet to surround the conduits, leaving the upper ends of the conduits exposed; and
b) a form comprising.
a plurality of parallel pins each having a shaft, a head and a pointed end;
a connecting means configured to hold the plurality of pins parallel to each other, wherein the connecting means connects the head of each of the plurality of parallel pins;
a plurality of straight conduits, each having an upper end and a lower end;
wherein each conduit has a constant cross-section and is configured to receive one of the plurality of parallel pins;
wherein a cement-based material can be poured to surround the conduits, leaving the upper ends of the conduits exposed; and
each of the parallel pins being configured such that the pointed end extends beyond the lower end of each conduit so as to prevent a cement-based material obstructing the lower end of each conduit when the cement-based material is poured to surround the conduits.

### Claim 28

(canceled)

### Claim 29

(canceled)

### Claim 30

(canceled)

### Claim 31

(canceled)

### Claim 32 (depends on 1)

A cement-based material pad comprising a plurality of drainage holes formed by a method as described in claim 1.

### Claim 33

(canceled)
