# US 2022/0009569 A1 · Scallop-resistant track link and method of making same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0009569 A1
- Document ID: US20220009569A1
- Status: Published application
- Kind: A1
- Application number: 17/484,788
- Filed: 2021-09-24
- Published: 2022-01-13
- Earliest claimed: 2018-08-27
- Assignees: Caterpillar Inc.
- Applicants: Caterpillar Inc.
- Inventors: Kevin Steiner
- Web page: https://patentgrep.com/patent/US20220009569A1

## CPC

- B62D 55/21: Links connected by transverse pivot pins
- B62D 55/06: with tracks without ground wheels
- C21D 1/18: Hardening (C21D1/02 takes precedence); Quenching with or without subsequent tempering (quenching devices C21D1/62)
- C21D 9/0087: {for chains, for chain links}
- C21D 2221/00: Treating localised areas of an article
- B62D: MOTOR VEHICLES; TRAILERS (steering, or guiding on a desired track, of agricultural machines or implements A01B69/00; wheels, castors, axles, increasing wheel adhesion B60B; vehicle tyres, tyre inflation or tyre changing B60C; connections between vehicles of a train or the like B60D; vehicles for use on rail and road, amphibious or convertible vehicles B60F; suspension arrangements B60G; heating, cooling, ventilating or other air treating devices B60H; windows, windscreens, non-fixed roofs, doors or similar devices, protective coverings for vehicles not in use B60J; propulsion plant arrangements, auxiliary drives, transmissions, controls, instrumentation or dashboards B60K; electric equipment or propulsion of electrically-propelled vehicles B60L; power supply for electrically-propelled vehicles B60M; passenger accommodation not otherwise provided for B60N; adaptations for load transportation or to carry special loads or objects B60P; arrangement of signalling or lighting devices, the mounting or supporting thereof or circuits therefor, for vehicles in general B60Q; vehicles, vehicle fittings or vehicle parts not otherwise provided for B60R; servicing, cleaning, repairing, supporting, lifting, or manoeuvring, not otherwise provided for, B60S; brake arrangements, brake control systems or parts thereof B60T; air-cushion vehicles B60V; motor-cycles, accessories therefor B62J, B62K; testing of vehicles G01M)
- C21D: MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING (surface treatment of metallic material involving at least one process provided for in class C23 and at least one process covered by this subclass C23F17/00; unidirectional solidification of eutectic materials or unidirectional demixing of eutectoid materials C30B)

## Abstract

A track link includes an elongate link body formed of a link body material that varies in hardness to form a first lower hardness zone, a second lower hardness zone, and a higher hardness zone. The higher hardness zone includes an upper rail surface of the elongate link body and extends substantially throughout the elongate link body outside of the first and second lower hardness zones, which surround the track pin bores. Related methodology for making a track link is also disclosed.

## Claims

### Claim 1

A method of making a track link comprising:
heat treating an elongate link body having a lower shoe-mounting surface and an upper rail surface such that a material extending throughout the elongate link body is hardened;
tempering the elongate link body such that a portion of the material that is hardened and forms a first and a second track pin bore in the elongate link body is softened; and
forming, by way of the heat treating and the tempering of the elongate link body, a scallop-retarding pattern of varying hardness where the elongate link body has a first lower hardness zone extending circumferentially around a first track pin bore, a second lower hardness zone extending circumferentially around a second track pin bore, and a higher hardness zone that includes the upper rail surface.

### Claim 2 (depends on 1)

The method of claim 1 wherein the heat treating of the elongate link body includes hardening the material extending throughout the elongate link body to a hardness greater than 50 HRC.

### Claim 3 (depends on 2)

The method of claim 2 wherein the tempering of the elongate link body includes softening the material that is hardened to a hardness less than 50 HRC.

### Claim 4 (depends on 3)

The method of claim 3 wherein the forming of the scallop-retarding pattern of varying hardness further includes:
forming a greater depth of the higher hardness zone from the upper rail surface to the lower shoe-mounting surface at a longitudinal location between the first and the second track pin bores; and
forming a lesser depth of the higher hardness zone that extends from the upper rail surface to the first and the second lower hardness zones at longitudinal locations of the first and the second track pin bores, respectively.

### Claim 5 (depends on 4)

The method of claim 4 wherein the lesser depth is about 20 millimeters or less.

### Claim 6 (depends on 4)

The method of claim 4 wherein each of the first lower hardness zone and the second lower hardness zone forms an arcuate interface with the higher hardness zone.

### Claim 7 (depends on 1)

The method of claim 1 wherein the elongate link body includes an outer perimetric surface that includes the upper rail surface and the lower shoe-mounting surface, and further comprising forming the first lower hardness zone and the second lower hardness zone as a negative image of the higher hardness zone within a boundary formed by the outer perimetric surface.

### Claim 8

A method of making a track link comprising:
hardening a material forming a track link;
selectively softening the hardened material of the track link; and
producing, by way of the hardening and the softening, a first lower hardness zone forming a first track pin bore, a second lower hardness zone forming a second track pin bore, and a higher hardness zone extending to each of a first end and a second end of the track link and including at least a majority of an upper rail surface of the track link.

### Claim 9 (depends on 8)

The method of claim 8 wherein the softening of the hardened material includes softening the hardened material using heating elements within the first track pin bore and the second track pin bore.

### Claim 10 (depends on 8)

The method of claim 8 further comprising forming the higher hardness zone extending throughout the track link outside of the first lower hardness zone and the second hardness zone.

### Claim 11 (depends on 8)

The method of claim 8 further comprising forming peaks of the first lower hardness zone and the second lower hardness zone each located at a depth from the upper rail surface.

### Claim 12 (depends on 8)

The method of claim 8 wherein the higher hardness zone includes an entirety of the upper rail surface.

### Claim 13 (depends on 12)

The method of claim 12 wherein a hardness of the hardened material forming the higher hardness zone is about 50 HRC or greater.

### Claim 14 (depends on 8)

The method of claim 8 wherein the first lower hardness zone includes a first link strap of the track link and the second lower hardness zone includes a second link strap of the track link, and the higher hardness zone extends, between the first track pin bore and the second track pin bore, from the upper rail surface to a lower shoe-mounting surface of the track link.

### Claim 15 (depends on 14)

The method of claim 14 wherein a first arcuate interface is formed between the first lower hardness zone and the higher hardness zone, and a second arcuate interface is formed between the second lower hardness zone and the higher hardness zone.

### Claim 16

A method of processing a track link for extended service life comprising:
selectively tempering a track link including an upper rail surface, a lower shoe-mounting surface, a first link strap, a second link strap, a first track pin bore and a second track pin bore each extending through the track link;
softening previously hardened material of the track link by way of the selective tempering such that softened material forms the first track pin bore and at least a portion of the first link strap;
softening previously hardened material of the track link by way of the selective tempering such that softened material forms the second track pin bore and at least a portion of the second link strap; and
limiting driving heat during the selective tempering into the previously hardened material such that at least a majority of the upper rail surface remains formed of the previously hardened material.

### Claim 17 (depends on 16)

The method of claim 16 wherein the limiting driving heat into the previously hardened material includes limiting driving heat such that an entirety of the upper rail surface and at least a portion of the lower shoe-mounting surface remains formed of the previously hardened material.

### Claim 18 (depends on 16)

The method of claim 16 further comprising receiving the track link prior to the selectively tempering formed throughout of the previously hardened material.

### Claim 19 (depends on 18)

The method of claim 18 further comprising heat treating the track link to form the track link of the previously hardened material, and advancing the track link to final machining after a total of one heat treating stage and a total of one selective tempering stage.

### Claim 20 (depends on 18)

The method of claim 18 wherein the previously hardened material has a hardness of about 55 HRC or greater.
