# US 2021/0363836 A1 · Method to Attain Full Annular Coverage During Cementing or Mud Circulation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0363836 A1
- Document ID: US20210363836A1
- Status: Published application
- Kind: A1
- Application number: 16/618,886
- Filed: 2019-01-07
- Published: 2021-11-25
- Earliest claimed: 2019-01-07
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Siva Rama Krishna JANDHYALA; Sunita KADAM; Rahul Chandrakant PATIL; Wiliam SHUMWAY
- Web page: https://patentgrep.com/patent/US20210363836A1

## CPC

- E21B 17/1014: {Flexible or expansible centering means, e.g. with pistons pressing against the wall of the well (E21B17/1042 takes precedence)}
- E21B 17/1042: {Elastomer protector or centering means}
- C09K 8/422: {specially adapted for sealing expandable pipes, e.g. of the non-hardening type}
- C09K 8/5083: {obtained by reactions only involving carbon-to-carbon unsaturated bonds}
- E21B 33/14: for cementing casings into boreholes
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE

## Abstract

Methods and systems are directed to the uniform distribution of a fluid through an annulus between a pipe and a wellbore wall, primarily when there is a preferential flow in one side of the annulus relative to another side of the annulus. Generally, the methods and systems involve introducing a first agent into the annulus, wherein the first agent is configured to cause swelling of a cladding on the exterior of the section of the pipe. The swelling reduces flow in the annulus on the side of the pipe with preferential flow so as to reduce the preferential flow on that side of the pipe.

## Claims

### Claim 1

A method comprising:
providing a pipe in a wellbore defined by a wellbore wall, wherein an annulus is formed between the pipe and wellbore wall, and a section of the pipe has an exterior facing the wellbore wall, wherein the exterior of the section is coated in a cladding; and
introducing a first agent into the annulus, wherein the first agent is configured to cause swelling of the cladding on the exterior of the section of the pipe.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
introducing a second agent into the annulus, wherein the second agent is configured to reduce swelling of the cladding.

### Claim 3 (depends on 1)

The method of claim 1, wherein, when the pipe is provided in the wellbore, the annulus has a first portion adjacent to a first side of the section and a second portion adjacent to a second side of the section such that the first portion has a larger width than the second portion so that fluids preferentially flow through the first portion relative to the second portion; and
wherein the first agent is configured to cause swelling of a cladding such that the swelling results in shifting preferential flow such that fluids flow at least equally through the first portion and second portion or preferentially flow through the second portion relative to flowing through the first portion.

### Claim 4 (depends on 3)

The method of claim 3, wherein the cladding is formed from a swellable polymer.

### Claim 5 (depends on 3)

The method of claim 3, wherein the swellable polymer swells when in contact with acid, and the first agent has a pH less than 7.

### Claim 6 (depends on 5)

The method of claim 5, wherein the first agent is a fluid that generates acid in situ within the borehole.

### Claim 7 (depends on 3)

The method of claim 3, further comprising:
introducing a second agent into the annulus, wherein the second agent is configured to reduce swelling of the cladding such that fluids preferentially flow through the first portion of the annulus relative to flowing through the second portion of the annulus.

### Claim 8 (depends on 7)

The method of claim 7, wherein the cladding is formed from an acid swellable polymer, the first agent has a pH less than 7, and the second agent has a pH more than 7.

### Claim 9 (depends on 8)

The method of claim 8, wherein the pipe is a casing and the second agent is a cement composition and wherein, when introduction of the cement composition into the annulus starts, the swelling of the cladding causes the cement to preferentially flow through the second portion of the annulus relative to flowing through the first portion of the annulus, and the cement composition causes reduction in swelling of the cladding so that preferential flow shifts to the first portion of the annulus relative to the second portion of the annulus, thus resulting in uniform distribution of cement through the annulus.

### Claim 10 (depends on 3)

The method of claim 3, wherein the pipe is part of a drill string and the method further comprises:
introducing drilling mud into the annulus after introduction of the first agent into the annulus such that drilling mud preferentially flows through the second portion of the annulus relative to the first portion of the annulus; and
introducing a second agent into the annulus, wherein the second agent is configured to reduce swelling of the cladding such that fluids preferentially flow through the first portion of the annulus relative to the second portion of the annulus.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
introducing drilling mud into the annulus after introduction of the second agent into the annulus such that drilling mud preferentially flows through the first portion of the annulus relative to the second portion of the annulus.

### Claim 12 (depends on 11)

The method of claim 11, wherein the cladding is formed from an acid swellable polymer, the first agent has a pH less than 7, and the second agent has a pH more than 7.

### Claim 13 (depends on 12)

The method of claim 12, wherein the first agent, the second agent and the drilling mud are introduced downhole using pumping equipment.

### Claim 14 (depends on 13)

The method of claim 13, wherein the steps of introducing the first agent and introducing the second agent are alternately repeated between introduction of drilling mud into the annulus so as to achieve uniform flow of drilling mud through the annulus during drilling.

### Claim 15

A method of cementing a casing in a wellbore defined by a wellbore wall, the method comprising:
introducing the casing into the wellbore such that an annulus is formed between the casing and the wellbore wall with a section of the casing having an exterior facing the wellbore wall, and wherein after introduction, the section of the casing has a first side farther from the wellbore wall than a second side of the casing opposing the first side so that a first portion of the annulus adjacent to the first side of the casing has a larger width than a second portion of the annulus adjacent to the second side of the casing which results in fluids preferentially flowing through the first portion of the annulus relative to the second portion of the annulus;
introducing a first agent into the annulus, wherein the first agent is configured to cause swelling of a cladding on the exterior of the section of the casing such that the swelling results in fluids flowing at least equally through the first portion and second portion or preferentially flowing through the second portion of the annulus relative to the first portion of the annulus; and
introducing a cement composition into the annulus, wherein at least when introduction of the cement starts, the cement composition preferentially flows through the second portion of the annulus relative to the first portion of the annulus, and the cement composition causes reduction in swelling of the cladding so that preferential flow shifts to the first portion of the annulus relative to the second portion of the annulus, thus resulting in uniform distribution of cement through the annulus.

### Claim 16 (depends on 15)

The method of claim 15, wherein the cladding is formed from a swellable polymer.

### Claim 17 (depends on 16)

The method of claim 16, wherein the swellable polymer swells when in contact with acid and the swelling is reduced when the swellable polymer is in contact with a base.

### Claim 18 (depends on 17)

The method of claim 17, wherein the first agent has a pH less than 7, and the cement has a pH of more than 7.

### Claim 19 (depends on 18)

The method of claim 18, wherein the cladding is placed on the section of casing prior to introduction of the casing into the wellbore.

### Claim 20 (depends on 19)

The method of claim 19, wherein the first agent and the cement are introduced downhole using pumping equipment.