# US 2021/0345376 A1 · Apparatus and Methods of Scheduling for Low Power Consumption

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0345376 A1
- Document ID: US20210345376A1
- Status: Published application
- Kind: A1
- Application number: 17/261,153
- Filed: 2019-04-29
- Published: 2021-11-04
- Earliest claimed: 2018-07-16
- Assignees: Huawei Technologies Co., Ltd.
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Young Hoon Kwon; Pengfei Xia
- Web page: https://patentgrep.com/patent/US20210345376A1

## CPC

- H04W 72/1273: of downlink data flows
- H04W 76/28: Discontinuous transmission [DTX]; Discontinuous reception [DRX]
- H04W 52/0235: {where the received signal is a power saving command}
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W 72/569: {of the traffic information}
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

Embodiments of this disclosure provide techniques for communicating in a wireless communications system. In particular, in an embodiment a base station receives a capability message from a user equipment (UE) indicating downlink scheduling delay. The base station transmits a downlink control frame to the UE in response to determining that transmitting a frame to the UE satisfies a scheduling delay condition. The downlink control frame indicates a scheduling delay of the frame equal to or greater than the downlink scheduling delay. The base station then transmits the frame to the UE in accordance with the downlink control frame.

## Claims

### Claim 1

A method for scheduling a wireless communication, the method comprising:
receiving, by a base station, a capability message from a user equipment (UE) indicating a scheduling delay for the UE to receive a transmission from the base station;
transmitting, by the base station, a downlink control frame to the UE indicating a scheduled time for reception of a frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
transmitting, by the base station, the frame to the UE in accordance with the scheduled time.

### Claim 2 (depends on 1)

The method of claim 1, wherein the scheduling delay corresponds to a time delay for transitioning a receive radio frequency (RF) chain of the UE from an OFF state to an ON state.

### Claim 3 (depends on 1, 2)

The method of any one of claims 1-2, wherein the scheduling delay corresponds to a set of modulation and coding schemes (MCSs), and wherein a scheduled MCS of a corresponding frame transmission is within the set of MCSs.

### Claim 4 (depends on 1, 2, 3)

The method of any one of claims 1-3, wherein the scheduling delay corresponds to a set of ranks, and wherein a scheduled rank of the corresponding frame transmission is within the set of ranks.

### Claim 5 (depends on 1, 2, 3, 4)

The method of any one of claims 1-4, wherein the downlink control frame further indicates to the UE to turn ON a receive radio frequency (RF) chain of the UE.

### Claim 6 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, that the frame to be transmitted from the base station to the UE uses a modulation and coding scheme (MCS) index level that is within a set of MCS index levels and, based thereon, transmitting the downlink control frame.

### Claim 7 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, that the frame to be transmitted from the base station to the UE uses a rank that is within a set of ranks and, based thereon, transmitting the downlink control frame.

### Claim 8 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station for a set period of time, no data transmissions being scheduled prior to the transmission of the frame and, based thereon, transmitting the downlink control frame.

### Claim 9 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, that the UE is in a DRX ON duration.

### Claim 10 (depends on 9)

The method of claim 9, wherein the frame is a first data transmission during the DRX ON duration.

### Claim 11 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, that a receive RF chain of the UE is turned OFF before the scheduled transmission of the frame and, based thereon, transmitting the downlink control frame.

### Claim 12 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the scheduling delay is a time delay for transitioning a receive radio frequency (RF) chain of the UE from an OFF state to an ON state, and wherein the transmitting the downlink control frame comprises determining, by the base station, that the receive RF chain of the UE is turned ON before the scheduled transmission of the frame by the base station and, based thereon, transmitting the downlink control frame.

### Claim 13 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, that a transmission of the frame to the UE successfully triggers a transition of a receive RF chain of the UE to an ON state and, based thereon, transmitting the downlink control frame.

### Claim 14 (depends on 1, 2, 3, 4, 5)

The method of any one of claims 1-5, wherein the transmitting the downlink control frame comprises determining, by the base station, a request for a channel state information reference signal (CSI-RS) measurement and, based thereon, transmitting the downlink control frame.

### Claim 15 (depends on 14)

The method of claim 14, wherein the frame comprises a CSI-RS resource for a CSI-RS measurement by the UE.

### Claim 16 (depends on 14)

The method of claim 14, wherein the downlink control frame requests for a CSI measurement.

### Claim 17 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)

The method of any one of claims 1-16, wherein the downlink control frame instructs the UE to transition a plurality of receive RF chains of the UE from the OFF state to the ON state.

### Claim 18 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17)

The method of any one of claims 1-17, wherein the downlink control frame is transmitted over a physical downlink control channel (PDCCH).

### Claim 19 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18)

The method of any one of claims 1-18, wherein the frame is transmitted over a physical downlink shared control channel (PDSCH).

### Claim 20 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)

The method of any one of claims 1-19, wherein the capability message further indicates a second scheduling delay for transitioning a transmit RF chain of the UE from an OFF state to an ON state.

### Claim 21 (depends on 20)

The method of claim 20, wherein the frame is a first frame, and wherein the method further comprises transmitting, by the base station, a second downlink control frame indicating a second scheduled time for transmission of a second frame by the UE, a second time delay between the second scheduled time and a reception time of the second downlink control frame being greater than or equal to the second scheduling delay.

### Claim 22 (depends on 21)

The method of claim 21, further comprising receiving, by the base station, the second frame from the UE in accordance with the second scheduled time.

### Claim 23 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22)

The method of any one of claims 1-22, wherein the downlink control frame is a first downlink control frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a reception of a second frame by the UE, the time interval between receiving the second downlink control frame and the frame, by the UE, being greater than a set timer value with an expiration.

### Claim 24 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22)

The method of any one of claims 1-22, wherein the downlink control frame is a first downlink control frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a reception of a second frame by the UE, the time interval between receiving the second downlink control frame and the first downlink control frame, by the UE, being greater than a set timer value with an expiration.

### Claim 25 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22)

The method of any one of claims 1-22, wherein the downlink control frame is a first downlink control frame, and wherein the frame is a first frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a reception of a second frame by the UE, the time interval between receiving the second frame and the first frame, by the UE, being greater than a set timer value with an expiration.

### Claim 26 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22)

The method of any one of claims 1-22, wherein the downlink control frame is a first downlink control frame, and wherein the frame is a first frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a time delay between a reception of a second frame by the UE and the reception of the second downlink control frame by the UE, the time delay between reception of the second frame the first downlink control frame being greater than a set timer value with an expiration.

### Claim 27 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26)

The method of any one of claims 1-26, wherein the scheduling delay corresponds to an activation of a scheduling time delay restriction, the activation corresponding to scheduling the scheduled time in accordance with a minimum time value.

### Claim 28 (depends on 27)

The method of claim 27, wherein the minimum time value is pre-defined in a standard.

### Claim 29 (depends on 27, 28)

The method of any one of claims 27-28, wherein the capability message comprises an activation bit indicating an activation or deactivation of the scheduling time delay restriction.

### Claim 30

A method for scheduling a wireless communication, the method comprising:
receiving, by a base station, a capability message from a user equipment (UE) indicating a scheduling delay for the UE to transmit to the base station;
transmitting, by the base station, a downlink control frame to the UE indicating a scheduled time for a transmission of a frame by the UE, a time delay between the scheduled time and a reception time of the downlink control frame being greater than or equal to the scheduling delay; and
receiving, by the base station, the frame from the UE in accordance with the scheduled time.

### Claim 31 (depends on 30)

The method of claim 30, wherein the scheduling delay corresponds to a time delay for transitioning a transmit radio frequency (RF) chain of the UE from an OFF state to an ON state.

### Claim 32 (depends on 30, 31)

The method of any one of claims 30-31, wherein the scheduling delay corresponds to a set of modulation and coding schemes (MCSs), and wherein a scheduled MCS of a corresponding frame transmission is within the set of MCSs.

### Claim 33 (depends on 30, 31, 32)

The method of any one of claims 30-32, wherein the scheduling delay corresponds to a set of ranks, and wherein a scheduled rank of the corresponding frame transmission is within the set of ranks.

### Claim 34 (depends on 30, 31, 32, 33)

The method of any one of claims 30-33, wherein the downlink control frame further indicates to the UE to turn ON a transmit radio frequency (RF) chain of the UE.

### Claim 35 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station, that the frame to be received by the base station from the UE uses a modulation and coding scheme (MCS) index level that is within a set of MCS index levels and, based thereon, transmitting the downlink control frame.

### Claim 36 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station, that the frame to be received by the base station from the UE uses a rank that is within a set of ranks and, based thereon, transmitting the downlink control frame.

### Claim 37 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station for a set period of time, no data receptions being scheduled prior to the transmission of the frame and, based thereon, transmitting the downlink control frame.

### Claim 38 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station, that the UE is in a DRX ON duration.

### Claim 39 (depends on 38)

The method of claim 38, wherein the frame is a first data reception during the DRX ON duration.

### Claim 40 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station, that a transmit RF chain of the UE is turned ON before the scheduled transmission of the frame by the UE and, based thereon, transmitting the downlink control frame.

### Claim 41 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the scheduling delay is a time delay for transitioning a transmit radio frequency (RF) chain of the UE from an OFF state to an ON state, and wherein the transmitting the downlink control frame comprises determining, by the base station, that the transmit RF chain of the UE is turned ON before the scheduled transmission of the frame by the UE and, based thereon, transmitting the downlink control frame.

### Claim 42 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the RF chain of the UE is a transmit RF chain, and wherein the transmitting the downlink control frame comprises determining, by the base station, that the transmit RF chain of the UE is turned ON before the scheduled reception of the frame and, based thereon, transmitting the downlink control frame.

### Claim 43 (depends on 30, 31, 32, 33, 34)

The method of any one of claims 30-34, wherein the transmitting the downlink control frame comprises determining, by the base station, that a transmission of the frame by the UE successfully triggers a transition of a transmit RF chain of the UE to an ON state and, based thereon, transmitting the downlink control frame.

### Claim 44 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43)

The method of any one of claims 30-43, wherein the downlink control frame instructs the UE to transition a plurality of transmit RF chains of the UE from the OFF state to the ON state.

### Claim 45 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44)

The method of any one of claims 30-44, wherein the downlink control frame is transmitted over a physical downlink control channel (PDCCH).

### Claim 46 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45)

The method of any one of claims 30-45, wherein the frame is received over a physical downlink shared control channel (PUSCH).

### Claim 47 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46)

The method of any one of claims 30-46, wherein the capability message further indicates a second scheduling delay for transitioning a receive RF chain of the UE from an OFF state to an ON state.

### Claim 48 (depends on 47)

The method of claim 47, wherein the frame is a first frame, and wherein the method further comprises transmitting, by the base station, a second downlink control frame indicating a second scheduled time for reception of a second frame by the UE, a second time delay between the second scheduled time and a reception time of the second downlink control frame being greater than or equal to the second scheduling delay.

### Claim 49 (depends on 48)

The method of claim 48, further comprising transmitting, by the base station, the second frame to the UE in accordance with the second scheduled time.

### Claim 50 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49)

The method of any one of claims 30-49, wherein the downlink control frame is a first downlink control frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a transmission of a second frame by the UE, the time interval between transmitting the second downlink control frame and receiving the frame, by the base station, being greater than a set timer value with an expiration.

### Claim 51 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50)

The method of any one of claims 30-50, wherein the downlink control frame is a first downlink control frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a transmission of a second frame by the UE, the time interval between transmitting the second downlink control frame and the first downlink control frame, by the base station, being greater than a set timer value with an expiration.

### Claim 52 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51)

The method of any one of claims 30-51, wherein the downlink control frame is a first downlink control frame, and wherein the frame is a first frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a scheduled time for a transmission of a second frame by the UE, the time interval between transmitting the second frame and the first frame, by the UE, being greater than a set timer value with an expiration.

### Claim 53 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52)

The method of any one of claims 30-52, wherein the downlink control frame is a first downlink control frame, and wherein the frame is a first frame, the method further comprising:
transmitting, by the base station, a second downlink control frame to the UE prior to the transmitting the first downlink control frame, the second downlink control frame indicating a time delay between a transmission of a second frame by the UE and the reception of the second downlink control frame by the UE, the time delay between transmission of the second frame by the UE and reception of the first downlink control frame by the UE being greater than a set timer value with an expiration.

### Claim 54 (depends on 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53)

The method of any one of claims 30-53, wherein the scheduling delay corresponds to an activation of a scheduling time delay restriction, the activation corresponding to scheduling the scheduled time in accordance with a minimum time value.

### Claim 55 (depends on 54)

The method of claim 54, wherein the minimum time value is pre-defined in a standard.

### Claim 56 (depends on 54, 55)

The method of any one of claims 54-55, wherein the capability message comprises an activation bit indicating an activation or deactivation of the scheduling time delay restriction.

### Claim 57

A method for scheduling a wireless communication, the method comprising:
transmitting, by a user equipment (UE), a capability message to a base station indicating a scheduling delay for transmitting a frame to the base station;
receiving, by the UE, a downlink control frame from the base station over a receive radio frequency (RF) chain of the UE, the downlink control frame indicating a scheduled time for transmitting the frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
transmitting, by the UE, the frame to the base station over a transmit RF chain of the UE in accordance with the scheduled time.

### Claim 58 (depends on 57)

The method of claim 57, wherein the frame is transmitted over a physical uplink shared control channel (PUSCH).

### Claim 59 (depends on 57, 58)

The method of any one of claims 57-58, wherein the downlink control frame is received, by the UE, over a physical downlink control channel (PDCCH), the method further comprising:
monitoring, by the UE, the PDCCH over the receive RF chain; and
decoding, by the UE, the downlink control frame after the receiving.

### Claim 60

A method for scheduling a wireless communication, the method comprising:
transmitting, by a user equipment (UE), a capability message to a base station indicating a scheduling delay for receiving a frame from the base station;
receiving, by the UE, a downlink control frame from the base station over a first receive radio frequency (RF) chain of the UE, the downlink control frame indicating a scheduled time for receiving the frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
receiving, by the UE, the frame from the base station over the first receive RF chain and a second receive RF chain in accordance with the scheduled time.

### Claim 61 (depends on 60)

The method of claim 60, wherein the frame is received over a physical downlink shared control channel (PDSCH).

### Claim 62 (depends on 60, 61)

The method of any one of claims 60-61, wherein the downlink control frame is received over a physical downlink control channel (PDCCH), the method further comprising:
monitoring, by the UE, the PDCCH over the first receive RF chain; and
decoding, by the UE, the downlink control frame after the receiving.

### Claim 63 (depends on 60, 61, 62)

The method of any one of claims 60-62, wherein the downlink control frame is a first downlink control frame, the frame is a first frame, the first downlink control frame further indicating to the UE that a transmission rank of the frame is two (2) or higher, the method further comprising:
receiving, by the UE, a second downlink control frame from the base station over the first receive RF chain prior to receiving the first downlink control frame, the second downlink control frame indicating a second scheduled time for a reception of a second frame having a transmission rank of one (1); and
receiving, by the UE, the second frame from the base station over the first receive RF chain prior to the receiving of the first downlink control frame.

### Claim 64 (depends on 63)

The method of claim 63, further comprising:
decoding, by the UE, the first downlink control frame; and
turning ON, by the UE, the second receive RF chain.

### Claim 65 (depends on 60, 61, 62, 63, 64)

The method of any one of claims 60-64, wherein the UE is configured to turn ON the second receive RF chain in response to receiving a message indicating that a transmission rank of a frame to be received is of rank two (2) or higher.

### Claim 66 (depends on 65)

The method of claim 65, wherein the UE comprises a timer having a set ON time before expiring, the timer configured to control the ON and OFF status of the second receive RF chain, the second receive RF chain in the OFF state in response to expiring of the timer, the method further comprising:
setting, by the UE, the timer to the set ON time in response to receiving a signal indicating that a transmission rank of a frame to be received is of rank two (2) or higher.

### Claim 67 (depends on 65)

The method of claim 65, wherein the timer continues to decrease in response to receiving a signal indicating a transmission rank of a frame to be received is of rank one (1).

### Claim 68

A method for scheduling a wireless communication, the method comprising:
transmitting, by a user equipment (UE), a capability message to a base station indicating a scheduling delay for receiving a frame from the base station;
receiving, by the UE operating in a discontinuous reception (DRX) ON state, a downlink control frame from the base station over a first receive RF chain of the UE, the downlink control frame indicating a scheduled time for receiving the frame by the UE, a time delay between reception of the frame and the downlink control frame, by the UE, being greater than or equal to the scheduling delay; and
receiving, by the UE operating in the DRX ON state, the frame from the base station in accordance with the scheduled time over the first receive RF chain and a second receive RF chain.

### Claim 69 (depends on 68)

The method of claim 68, wherein the frame comprises a transmission rank of two (2) or higher.

### Claim 70 (depends on 68, 69)

The method of any one of claims 68-69, wherein the UE switches between the DRX ON state and a DRX OFF state in a DRX cycle.

### Claim 71 (depends on 68, 69, 70)

The method of any one of claims 68-70, wherein the UE operates under a DRX operation comprising a long DRX cycle and a short DRX cycle.

### Claim 72 (depends on 68, 69, 70, 71)

The method of any one of claims 68-71, wherein the UE operates under a DRX operation comprising a long DRX cycle.

### Claim 73 (depends on 68, 69, 70, 71, 72)

The method of any one of claims 68-72, further comprising:
turning ON, by the UE operating in the DRX ON state, the second receive RF chain in response to the receiving the downlink control frame.

### Claim 74 (depends on 68, 69, 70, 71, 72, 73)

The method of any one of claims 68-73, further comprising:
receiving, by the UE operating in the DRX ON state, a second downlink control frame from the base station indicating a second scheduled time for receiving a second frame by the UE; and
receiving, by the UE, the second frame from the base station over the first and second receive RF chains in accordance with the second scheduled time.

### Claim 75 (depends on 68, 69, 70, 71, 72, 73, 74)

The method of any one of claims 68-74, wherein the second frame comprises a transmission rank of two (2) or higher.

### Claim 76 (depends on 68, 69, 70, 71, 72, 73, 74, 75)

The method of any one of claims 68-75, the method further comprising:
receiving, by the UE operating in a second DRX ON state, a third downlink control frame from the base station indicating a third scheduled time for receiving a third frame having a rank of 1; and
receiving, by the UE operating in the second DRX ON state, the third frame over the first receive RF chain of the UE in accordance with the third scheduled time.

### Claim 77 (depends on 68, 69, 70, 71, 72, 73, 74, 75, 76)

The method of any one of claims 68-76, further comprising turning OFF, by the UE, the first and second receive RF chains in response to the UE operating in a DRX OFF state.

### Claim 78 (depends on 68, 69, 70, 71, 72, 73, 74, 75, 76, 77)

The method of any one of claims 68-77, further comprising turning ON, by the UE, the first receive RF chain in response to the UE operating in the DRX ON state.

### Claim 79 (depends on 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78)

The method of any one of claims 68-78, further comprising turning ON, by the UE, the second receive RF chain in response to the UE operating in the DRX ON state and in response to receiving, by the UE, a transmission with a transmission rank of two (2) or higher.

### Claim 80

A method for scheduling a wireless communication, the method comprising:
transmitting, by a user equipment (UE), a capability message to a base station indicating a scheduling delay for transmitting a frame to the base station;
receiving, by the UE operating in a discontinuous reception (DRX) ON state, a downlink control frame from the base station over a receive radio frequency (RF) chain of the UE, the downlink control frame indicating a scheduled time for transmitting the frame by the UE, a time delay between a transmission of the frame and a reception of the downlink control frame by the UE being greater than or equal to the scheduling delay; and
transmitting, by the UE operating in the DRX ON state, the frame to the base station over a transmit RF chain in accordance with the scheduled time.

### Claim 81 (depends on 79)

The method of claim 79, wherein the frame comprises a transmission rank of two (2) or higher.

### Claim 82 (depends on 80, 81)

The method of any one of claims 80-81, wherein the UE switches between the DRX ON state and a DRX OFF state in a DRX cycle.

### Claim 83 (depends on 80, 81, 82)

The method of any one of claims 80-82, wherein the UE operates under a DRX operation comprising a long DRX cycle and a short DRX cycle.

### Claim 84 (depends on 80, 81, 82, 83)

The method of any one of claims 80-83, wherein the UE operates under a DRX operation comprising a long DRX cycle.

### Claim 85 (depends on 80, 81, 82, 83, 84)

The method of any one of claims 80-84, further comprising turning ON, by the UE operating in the DRX ON state, the transmit RF chain in response to the receiving the downlink control frame.

### Claim 86 (depends on 80, 81, 82, 83, 84, 85)

The method of any one of claims 80-85, further comprising:
receiving, by the UE operating in the DRX ON state, a second downlink control frame from the base station over the first receive RF chain, the second downlink control frame indicating a second scheduled time for a transmission of a second frame by the UE, a time delay between a reception of the second downlink control frame by the UE and the scheduled time being less than the scheduling delay; and
transmitting, by the UE, the second frame from the base station over the transmit RF chain in accordance with the second scheduled time.

### Claim 87 (depends on 80, 81, 82, 83, 84, 85, 86)

The method of any one of claims 80-86, wherein the second frame comprises a transmission rank of two (2) or higher.

### Claim 88 (depends on 80, 81, 82, 83, 84, 85, 86, 87)

The method of any one of claims 80-87, further comprising turning OFF, by the UE, the receive RF chain and the transmit RF chain in response to the UE operating in a DRX OFF state.

### Claim 89 (depends on 80, 81, 82, 83, 84, 85, 86, 87, 88)

The method of any one of claims 80-88, further comprising turning ON, by the UE, the receive RF chain in response to the UE operating in the DRX ON state.

### Claim 90 (depends on 80, 81, 82, 83, 84, 85, 86, 87, 88, 89)

The method of any one of claims 80-89, further comprising turning ON, by the UE, the transmit RF chain in response to the UE operating in the DRX ON state and in response to a transmission with a rank of two (2) or higher.

### Claim 91

A base station comprising:
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
receive a capability message from a user equipment (UE) indicating a scheduling delay for the UE to receive a transmission from the base station;
transmit a downlink control frame to the UE indicating a scheduled time for reception of a frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
transmit the frame to the UE in accordance with the scheduled time.

### Claim 92

A base station comprising:
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
receive a capability message from a user equipment (UE) indicating a scheduling delay for the UE to transmit to the base station;
transmit a downlink control frame to the UE indicating a scheduled time for a transmission of a frame by the UE, a time delay between the scheduled time and a reception time of the downlink control frame being greater than or equal to the scheduling delay; and
receive the frame from the UE in accordance with the scheduled time.

### Claim 93

A user equipment (UE) comprising:
a receive radio frequency (RF) chain;
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
transmit a capability message to a base station indicating a scheduling delay for transmitting a frame to the base station;
receive a downlink control frame from the base station over the receive RF chain of the UE, the downlink control frame indicating a scheduled time for transmitting the frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
transmit the frame to the base station over a transmit RF chain of the UE in accordance with the scheduled time.

### Claim 94

A user equipment (UE) comprising:
a first and a second receive radio frequency (RF) chain;
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
transmit a capability message to a base station indicating a scheduling delay for receiving a frame from the base station;
receive a downlink control frame from the base station over the first receive RF chain of the UE, the downlink control frame indicating a scheduled time for receiving the frame by the UE, a time delay between the scheduled time and reception time of the downlink control frame being greater than or equal to the scheduling delay; and
receive the frame from the base station over the first receive RF chain and the second receive RF chain in accordance with the scheduled time.

### Claim 95

A user equipment (UE) operating in a discontinuous reception (DRX) mode, the UE comprising:
a first and a second receive radio frequency (RF) chain;
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
transmit a capability message to a base station indicating a scheduling delay for receiving a frame from the base station;
receive a downlink control frame from the base station over the first receive RF chain of the UE in a DRX ON state, the downlink control frame indicating a scheduled time for receiving the frame by the UE, a time delay between reception of the frame and the downlink control frame, by the UE, being greater than or equal to the scheduling delay; and
receive the frame from the base station in accordance with the scheduled time over the first receive RF chain and the second receive RF chain of the UE in the DRX ON state.

### Claim 96

A user equipment (UE) operating in a discontinuous reception (DRX) mode, the UE comprising:
a receive radio frequency (RF) chain;
a transmit RF chain;
a non-transitory memory storage comprising instructions; and
one or more processors in communication with the non-transitory memory storage, wherein the one or more processors execute the instructions to:
transmit a capability message to a base station indicating a scheduling delay for transmitting a frame to the base station;
receive a downlink control frame from the base station over the receive RF chain of the UE in a DRX ON state, the downlink control frame indicating a scheduled time for transmitting the frame by the UE, a time delay between a transmission of the frame and a reception of the downlink control frame by the UE being greater than or equal to the scheduling delay; and
transmit the frame to the base station over the transmit RF chain in accordance with the scheduled time, the UE operating in a DRX ON state.
