# US 2021/0344198 A1 · Reactive Power Control Method for an Integrated Wind and Solar Power System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0344198 A1
- Document ID: US20210344198A1
- Status: Published application
- Kind: A1
- Application number: 17/274,281
- Filed: 2019-09-05
- Published: 2021-11-04
- Earliest claimed: 2018-09-07
- Assignees: General Electric Company
- Applicants: General Electric Company
- Inventors: Arvind Kumar Tiwari; Vaidhya Nath Venkitanarayanan; Yashomani Yashodhan Kolhatkar; Veena Padma Rao
- Web page: https://patentgrep.com/patent/US20210344198A1

## CPC

- H02J 3/18: Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J 3/381: {Dispersed generators}
- H02J 3/46: Controlling the sharing of generated power between the generators, sources or networks
- H02J 3/50: Controlling the sharing of reactive power
- H02J 2101/20: Dispersed power generation using renewable energy sources
- H02J 2101/24: Photovoltaics
- H02J 2101/28: Wind energy
- H02J 2101/40: Hybrid power plants, i.e. a plurality of different generation technologies being operated at one power plant
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 40/30: Reactive power compensation
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method of operating a power generation system (100) employing a generator (110) and a solar power source (120) is provided. The method includes the steps of determining (310) if a wind speed is less than a cut-in speed, calculating (315) a reactive power demand for an electrical grid (102), calculating (320) a reactive power capability of a line side converter (140), determining (325) if the reactive power demand is greater than the reactive power capability, and calculating (330) a reactive power capability of the line side converter (140) and a rotor side converter (130). The method also includes the steps of determining (335) if the reactive power demand is greater than the reactive power capability of the line side converter (140) and the rotor side converter (130), and reducing solar power generation or reconfiguring the line side converter (140) and/or the rotor side converter (130) to meet reactive power demand.

## Claims

### Claim 1

A method of operating a power generation system (100) employing a generator (110) and a solar power source (120), wherein the generator is electrically coupled to a rotor side converter (130) and a point of common coupling (PCC) (103), the PCC being electrically coupled to a line side converter (140), a DC-DC converter (150) is electrically coupled to an output of the rotor side converter and an input of the line side converter, the DC-DC converter electrically coupled to the solar power source, the method comprising:
(a) determining (310) if a wind speed is less than a cut-in speed;
(b) calculating (315) a reactive power demand for an electrical grid (102);
(c) calculating(320) a reactive power capability of the line side converter;
(d) determining (325) if the reactive power demand is greater than the reactive power capability;
(e) calculating (330) a reactive power capability of the line side converter and the rotor side converter;
(f) determining (335) if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter;
(g) reducing (340) solar power generation if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter and repeating the determining if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter step, or reconfiguring at least one of the line side converter and the rotor side converter to meet reactive power demand.

### Claim at position 2

2-14. (canceled)

### Claim 15 (depends on 1)

The method of claim 1, step (a) (310) further comprising:
determining if a wind speed is equal to or greater than the cut-in speed, and if so;
operating the generator in a default mode.

### Claim 16 (depends on 1)

The method of claim 1, wherein step (c) (320) further comprises:
calculating a reactive power capability for a plurality of wind turbines, each of the wind turbines having one line side converter.

### Claim 17 (depends on 1)

The method of claim 1, wherein step (d) (325) further comprises:
determining if the reactive power demand is less than or equal to the reactive power capability, and if so operating the generator in a default mode.

### Claim 18 (depends on 1)

The method of claim 1, wherein step (e) (330) further comprises:
calculating a reactive power capability for a first wind turbine, and determining if the calculated reactive power capability is equal to or greater than the reactive power demand, and if not then repeating the calculating and determining steps for a second wind turbine and repeating these steps until the reactive power capability for all wind turbines in a wind farm has been calculated or the reactive power demand is equal to or less than the calculated reactive power capability.

### Claim 19 (depends on 1)

The method of claim 1, wherein step (f) (335) further comprises:
determining if the reactive power demand is less than or equal to the reactive power capability of the line side converter and the rotor side converter, and if so operating the generator in a default mode.

### Claim 20 (depends on 19)

The method of claim 19, wherein the default mode comprises:
a first default mode where reactive power capability is driven primarily by the generator, and wind speed is equal to or above the cut-in speed; or
a second default mode where reactive power capability is driven primarily by at least one of the line side converter and the rotor side converter, and wind speed is below the cut-in speed and the solar power source is not generating power.

### Claim 21

A method of operating a power generation system (100) employing a generator (1 10) and a secondary power source (120, 795), wherein the generator is electrically coupled to a rotor side converter (130) and a point of common coupling (PCC) (103), the PCC being electrically coupled to a line side converter (140), a DC-DC converter (150) is electrically coupled to an output of the rotor side converter and an input of the line side converter, the DC-DC converter electrically coupled to the secondary power source, the method comprising:
(a) determining (310) if a wind speed is less than a cut-in speed;
(b) calculating (315) a reactive power demand for an electrical grid;
(c) calculating (320) a reactive power capability of the line side converter;
(d) determining (325) if the reactive power demand is greater than the reactive power capability;
(e) calculating (330) a reactive power capability of the line side converter and the rotor side converter;
(f) determining (335) if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter;
(g) reducing (340) secondary power source generation if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter and repeating the determining if the reactive power demand is greater than the reactive power capability of the line side converter and the rotor side converter step, or reconfiguring at least one of the line side converter and the rotor side converter to meet reactive power demand.

### Claim 22 (depends on 21)

The method of claim 21, wherein step (a) further comprises:
determining if a wind speed is equal to or greater than the cut-in speed, and if so;
operating the generator in a default mode.

### Claim 23 (depends on 21)

The method of claim 21, wherein step (c) further comprises:
calculating a reactive power capability for a plurality of wind turbines, each of the wind turbines having one line side converter.

### Claim 24 (depends on 21)

The method of claim 21, wherein step (d) further comprises:
determining if the reactive power demand is less than or equal to the reactive power capability, and if so operating the generator in a default mode.

### Claim 25 (depends on 21)

The method of claim 21, wherein step (e) further comprises:
calculating a reactive power capability for a first wind turbine, and determining if the calculated reactive power capability is equal to or greater than the reactive power demand, and if not then repeating the calculating and determining steps for a second wind turbine and repeating these steps until the reactive power capability for all wind turbines in a wind farm has been calculated or the reactive power demand is equal to or less than the calculated reactive power capability.

### Claim 26 (depends on 21)

The method of claim 21, wherein step (f) further comprises:
determining if the reactive power demand is less than or equal to the reactive power capability of the line side converter and the rotor side converter, and if so operating the generator in a default mode.

### Claim 27 (depends on 26)

The method of claim 26, wherein the default mode comprises:
a first default mode where reactive power capability is driven primarily by the generator, and wind speed is equal to or above the cut-in speed; or
a second default mode where reactive power capability is driven primarily by the at least one of the line side converter and the rotor side converter, and wind speed is below the cut-in speed and the secondary power source is not generating power.