# US 2021/0342898 A1 · System and method for generating cost estimation for damage restoration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0342898 A1
- Document ID: US20210342898A1
- Status: Published application
- Kind: A1
- Application number: 17/242,680
- Filed: 2021-04-28
- Published: 2021-11-04
- Earliest claimed: 2020-04-29
- Applicants: The Solutions Company, LLC
- Inventors: Thomas McGuire
- Web page: https://patentgrep.com/patent/US20210342898A1

## CPC

- G06Q 30/0283: Price estimation or determination
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/103: {Workflow collaboration or project management}
- G06Q 10/063118: {Staff planning in a project environment}
- G06Q 40/12: Accounting
- G06Q 50/163: Real estate management
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Methods and apparatus for a budget and reserve estimation system for restoring property damage include a remotely accessible content server and storage device for storing and processing project data. Individual project data may be uploaded to the content server via a dashboard or graphical user interface displayed on a user device. Project data may then be processed by the content server to generate individualized budget and reserve cost estimates for a property restoration project. The dashboard may allow the user to review a default set of cost parameters based on entered data and adjust, alter, or add additional information to further customize the generated individualized budget and reserve cost estimates.

## Claims

### Claim 1

A method for generating a budget and reserve estimation for recovery and restoration of property damage, comprising:
storing a set of project data in a network-based non-transitory storage device;
providing a content server communicatively linked to the set of project data in the network-based non-transitory storage device;
providing remote access to the content server over a network in real time to a user device to allow the user device to create a new project estimate through a graphical user interface on the user device;
receiving, by the content server, a preliminary set of project data entered from the user device comprising: a square footage for the project, a number of calendar days to complete the project, and a project mitigation level selected from a list of mitigations levels;
generating, by the content server, an initial project estimate and an estimate of required staff labor for the project based on the preliminary set of project data and transmitting the initial project estimate to the user device;
receiving, by the content server, a detailed set of project data entered from the user device;
updating, by the content server, the initial project estimate according to the received detailed set of project data to generate a final project estimate; and
transmitting the final project estimate to the user device in real time for display in the graphical user interface.

### Claim 2 (depends on 1)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 1, further comprising saving the final project estimate and the estimate of required staff labor to the network-based non-transitory storage device.

### Claim 3 (depends on 1)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 1, further comprising generating a completed estimate bid package based on the final project estimate.

### Claim 4 (depends on 3)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 3, wherein the completed estimate bid package comprises a scope of work.

### Claim 5 (depends on 4)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 4, wherein content server prompts the user device to select from a predetermined list of factors used to generate the scope of work.

### Claim 6 (depends on 1)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 1, wherein the estimate of required staff labor for the project is determined according to a production rate associated with the selected mitigation level, the square footage of the project, and the number of calendar days to complete the project.

### Claim 7 (depends on 6)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 6, wherein the detailed set of project data comprises a set of additional projected project costs initially determined according to a predetermined percentage of a calculated cost corresponding to the estimate of required staff labor for the project.

### Claim 8 (depends on 7)

A method for generating a budget and reserve estimation for recovery and restoration of property damage according to claim 7, wherein:
the content server displays to the user device the set of additional projected project costs;
the graphical user interface allows a user to edit each element in the set of additional projected project costs and transmit any changes back to the content server; and
the content service updates the initial project estimate according to any changes received from the user device.

### Claim 9

An internet-based budget and reserve estimation system for recovery and restoration of property damage accessible by a user device connected to the internet via a network, comprising:
a network-based non-transitory storage device storing a set of project data;
a content server communicatively linked to the set of project data in the network-based non-transitory storage device, wherein the content server is configured to:
be accessible to the user device over the network and display a graphic user interface on the user device;
receive a preliminary set of project data entered from the user device via the graphic user interface, wherein the preliminary set of project data comprises: a square footage for a project, a number of calendar days to complete the project, and a project mitigation level selected from a list of mitigations levels;
generate an initial project estimate and an estimate of required staff labor for the project based on the preliminary set of project data; and
transmit the initial project estimate and the estimate of required staff labor to the user device for display;
receive a detailed set of project data entered from the user device;
update the initial project estimate according to the received detailed set of project data to generate a final project estimate; and
transmit the final project estimate to the user device in real time for display in the graphical user interface.

### Claim 10 (depends on 1)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 1, wherein the content server is configured to save the final project estimate and the estimate of required staff labor to the network-based non-transitory storage device.

### Claim 11 (depends on 1)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 1, wherein the content server is configured to generate a completed estimate bid package based on the final project estimate in response to a command from the user device.

### Claim 12 (depends on 11)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 11, wherein the completed estimate bid package comprises a scope of work.

### Claim 13 (depends on 12)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 12, wherein content server prompts the user device to select from a predetermined list of factors used to generate the scope of work.

### Claim 14 (depends on 1)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 1, wherein the estimate of required staff labor for the project is determined according to a production rate associated with the selected mitigation level, the square footage of the project, and the number of calendar days to complete the project.

### Claim 15 (depends on 12)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 12, wherein the detailed set of project data comprises a set of additional projected project costs initially determined according to a predetermined percentage of a calculated cost corresponding to the estimate of required staff labor for the project.

### Claim 16 (depends on 15)

An internet-based budget and reserve estimation system for recovery and restoration of property damage according to claim 15, wherein:
the content server displays to the user device the set of additional projected project costs;
the graphical user interface allows a user to edit each element in the set of additional projected project costs and transmit any changes back to the content server; and
the content service updates the initial project estimate according to any changes received from the user device.