# US 2021/0342791 A1 · Manufacturing schedules that integrate maintenance strategies

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0342791 A1
- Document ID: US20210342791A1
- Status: Published application
- Kind: A1
- Application number: 17/280,223
- Filed: 2018-09-28
- Published: 2021-11-04
- Earliest claimed: 2018-09-28
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Ioannis Akrotirianakis; Amit Chakraborty
- Web page: https://patentgrep.com/patent/US20210342791A1

## CPC

- G06Q 10/20: Administration of product repair or maintenance
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0637: Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- Y02P 90/80: Management or planning
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Systems, techniques, and computer-program products are provided to generate manufacturing schedules that integrate maintenance strategies. A manufacturing schedule can be generated by solving an optimization problem subject to operational constraints that preserve consistency in the order of the operations to be performed during the manufacture of a product, and further subject to maintenance constraints that enforce a desired maintenance strategy. The optimization problem can be solved by minimizing a makespan of a product subject to the operational and maintenance constraints.

## Claims

### Claim 1

A computer-implemented method, comprising:
receiving first data indicative of a group of manufacturing parameters corresponding to a process for manufacturing a product, the process comprising multiple operations executed by respective machines;
configuring second data indicative of a group of processing constraints corresponding to execution of the multiple operations;
configuring third data indicative of a group of maintenance parameters corresponding to respective maintenance tasks for the respective machines;
configuring fourth data indicative of a group of maintenance constraints corresponding to performance of the maintenance tasks; and
generating, using at least the group of processing constraints and the group of maintenance constraints, a schedule for the machines to execute the process for manufacturing the product.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the generating comprises solving an optimization problem with respect to a makespan of the product subject to the group of processing constraints and the group of maintenance constraints.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein the solving the optimization problem comprises:
configuring a first group of binary parameters for respective ones of the multiple operations;
configuring a second group of binary parameters for the respective ones of the multiple operations;
updating iteratively the first group of binary parameters and the second group of binary parameters subject at least to at least the group of processing constraints and the group of maintenance constraints until a converge criterion is satisfied, resulting in a first group of optimal binary parameters and a second group of optimal binary parameters; and
generating the schedule using at least the first group of optimal binary parameters and the second group of optimal parameters.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3, wherein the updating comprises performing a branch-and-bound process.

### Claim 5 (depends on 4)

The computer-implemented method of claim 4, wherein the group of processing constraints comprises a first processing constraint based at least on a first processing time of the processing times and the quality assurance parameter, the first processing time corresponding to a first operation of the multiple operations, and wherein the first processing constraint requires that the first operation is completed before a second operation consecutive to the first operation is initiated.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the group of manufacturing parameters comprises processing time intervals corresponding to completion of respective ones of the multiple operations.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein the group of manufacturing parameters comprises a reiteration parameter indicative of a number of times a first operation of the operations is performed.

### Claim 8 (depends on 1)

The computer-implemented method of claim 1, wherein the group of maintenance constraints comprises a first maintenance constraint based at least on a defined period of maintenance events for a first machine of the machines and a decommission time interval of the first machine.

### Claim 9

A system, comprising:
at least one memory device having stored therein computer-executable instructions; and
at least one processor configured to access the at least one memory device and further configured to execute the computer-executable instructions to:
receive first data indicative of a group of manufacturing parameters corresponding to a process for manufacturing a product, the process comprising multiple operations executed by respective machines;
configure second data indicative of a group of processing constraints corresponding to execution of the multiple operations;
configure third data indicative of a group of maintenance parameters corresponding to respective maintenance tasks for the respective machines;
configure fourth data indicative of a group of maintenance constraints corresponding to performance of the maintenance tasks; and
generate, using at least the group of processing constraints and the group of maintenance constraints, a schedule for the machines to execute the process for manufacturing the product.

### Claim 10 (depends on 9)

The system of claim 9, wherein to generate the schedule, the at least one processor being further configured to execute the computer-executable instructions to solve an optimization problem with respect to a makespan of the product subject to the group of processing constraints and the group of maintenance constraints.

### Claim 11 (depends on 10)

The system of claim 10, wherein to solve the optimization problem, the at least one processor being further configured to execute the computer-executable instructions to:
configure a first group of binary parameters for respective ones of the multiple operations;
configure a second group of binary parameters for the respective ones of the multiple operations;
update iteratively the first group of binary parameters and the second group of binary parameters subject at least to at least the group of processing constraints and the group of maintenance constraints until a converge criterion is satisfied, resulting in a first group of optimal binary parameters and a second group of optimal binary parameters; and
generate the schedule using at least the first group of optimal binary parameters and the second group of optimal parameters.

### Claim 12 (depends on 11)

The system of claim 11, wherein to update iteratively the first group of binary parameters and the second group of binary parameters, the at least one processor being further configured to execute the computer-executable instructions to perform a branch-and-bound process.

### Claim 13 (depends on 9)

The system of claim 9, wherein the group of manufacturing parameters comprises processing time intervals corresponding to completion of respective ones of the multiple operations.

### Claim 14 (depends on 9)

The system of claim 9, wherein the group of maintenance constraints comprises a first maintenance constraint based at least on a defined period of maintenance events for a first machine of the machines and a decommission time interval of the first machine.

### Claim 15 (depends on 9)

The system of claim 9, wherein the group of manufacturing parameters comprises a reiteration parameter indicative of a number of times a first operation of the operations is performed.

### Claim 16 (depends on 15)

The system of claim 15, wherein the group of processing constraints comprises a first processing constraint based at least on a first processing time interval of the processing time intervals and the reiteration parameter, the first processing time interval corresponding to a first operation of the multiple operations, and wherein the first processing constraint requires that the first operation is completed before a second operation consecutive to the first operation is initiated.

### Claim 17

A computer program product comprising at least one non-transitory storage medium readable by at least one processing circuit, the non-transitory storage medium having encoded thereon instructions executable by the at least one processing circuit to perform or facilitate operations comprising:
receiving first data indicative of a group of manufacturing parameters corresponding to a process for manufacturing a product, the process comprising multiple operations executed by respective machines;
configuring second data indicative of a group of processing constraints corresponding to execution of the multiple operations;
configuring third data indicative of a group of maintenance parameters corresponding to respective maintenance tasks for the respective machines;
configuring fourth data indicative of a group of maintenance constraints corresponding to performance of the maintenance tasks; and
generating, using at least the group of processing constraints and the group of maintenance constraints, a schedule for the machines to execute the process for manufacturing the product.

### Claim 18 (depends on 17)

The computer program product of claim 17, wherein the generating comprises solving an optimization problem with respect to a makespan of the product subject to the group of processing constraints and the group of maintenance constraints.

### Claim 19 (depends on 18)

The computer program product of claim 18, wherein the solving the optimization problem comprises:
configuring a first group of binary parameters for respective ones of the multiple operations;
configuring a second group of binary parameters for the respective ones of the multiple operations;
updating iteratively the first group of binary parameters and the second group of binary parameters subject at least to at least the group of processing constraints and the group of maintenance constraints until a converge criterion is satisfied, resulting in a first group of optimal binary parameters and a second group of optimal binary parameters; and
generating the schedule using at least the first group of optimal binary parameters and the second group of optimal parameters.

### Claim 20 (depends on 19)

The computer program product of claim 19, wherein the updating comprises performing a branch-and-bound process.