# US 2021/0342769 A1 · Consumable waste identification

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0342769 A1
- Document ID: US20210342769A1
- Status: Published application
- Kind: A1
- Application number: 17/257,952
- Filed: 2019-01-10
- Published: 2021-11-04
- Earliest claimed: 2019-01-10
- Assignees: Hewlett-Packard Development Company, L.P.
- Applicants: Hewlett-Packard Development Company, L.P.
- Inventors: Dean H. Ouchida; Armando Ugarte
- Web page: https://patentgrep.com/patent/US20210342769A1

## CPC

- B29C 64/393: for controlling or regulating additive manufacturing processes
- G06Q 10/083: Shipping
- B33Y 50/02: for controlling or regulating additive manufacturing processes
- G06Q 30/06: Buying, selling or leasing transactions
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING

## Abstract

Examples disclosed herein relate to creating a shipment order comprising a first consumable of a consumable type, calculating an expected waste cost for a second consumable of the consumable type, determining whether a shipping cost for the second consumable exceeds the expected waste cost, and in response to determining that the shipping cost exceeds the expected waste cost, adding the second consumable to the shipment order.

## Claims

### Claim 1

A non-transitory machine readable medium storing instructions executable by a processor to:
identify an average waste cost for a consumable type;
calculate a shipping cost for the consumable type;
determine whether the shipping cost exceeds the average waste cost; and
in response to determining that the shipping cost exceeds the average waste cost, create a shipment for the consumable type.

### Claim 2 (depends on 1)

The non-transitory machine readable medium of claim 1, wherein the average waste cost is calculated according to at least one waste cost associated with an amount of stranded material in the consumable type.

### Claim 3 (depends on 2)

The non-transitory machine readable medium of claim 2, wherein the at least one waste cost associated with the amount of stranded material comprises a value of the amount of stranded material left in the consumable type when it is replaced by a new consumable type.

### Claim 4 (depends on 3)

The non-transitory machine readable medium of claim 3, wherein the consumable type comprises a print material container.

### Claim 5 (depends on 1)

The non-transitory machine readable medium of claim 1, wherein the average waste cost is calculated for a plurality of discarded consumables of the consumable type.

### Claim 6 (depends on 1)

The non-transitory machine readable medium of claim 1, wherein a first consumable of the consumable type is scheduled for shipment and the average waste cost is calculated for a second consumable of the consumable type.

### Claim 7 (depends on 6)

The non-transitory machine readable medium of claim 6, wherein the instructions to create the shipment of the consumable type comprise instructions to bundle the first consumable and the second consumable into a single shipment

### Claim 8 (depends on 7)

The non-transitory machine readable medium of claim 7, further comprising:
in response to determining that the shipping cost does not exceed the average waste cost for the second consumable, create the shipment only for the first consumable.

### Claim 9 (depends on 1)

The non-transitory machine readable medium of claim 1, wherein the instructions to calculate the shipping cost for the consumable type comprise instructions to identify the lower of a historical average waste of the consumable type and a maximum potential waste for the consumable type.

### Claim 10

A method comprising:
creating a shipment order comprising a first consumable of a consumable type;
calculating an expected waste cost for a second consumable of the consumable type;
determining whether a shipping cost for the second consumable exceeds the expected waste cost; and
in response to determining that the shipping cost exceeds the expected waste cost, adding the second consumable to the shipment order.

### Claim 10 (depends on 10)

The method of claim 10, wherein the expected waste cost is calculated according to a remaining amount of consumable material in the second consumable of the consumable type.

### Claim 10 (depends on 10)

The method of claim 10, wherein the expected waste cost is calculated according to an average amount of discarded consumable material in a plurality of consumables of the consumable type.

### Claim 11 (depends on 10)

The method of claim 10, furthers comprising, in response to, determining that the shipping cost does not exceed the expected waste cost, causing the shipment order to be sent with only the first consumable.

### Claim 14 (depends on 10)

The method of claim 10 wherein the expected waste cost comprises a value of a consumable material left in the second consumable when it is discarded without being used.

### Claim 15

A system, comprising:
a consumable engine to:
detect a first consumable of a consumable type needs replacement, and
calculate an expected waste cost for a second consumable of the consumable type; and
a shipment engine to:
create a shipment order comprising a first consumable of a consumable type;
determine whether a shipping cost for the second consumable exceeds the expected waste cost, and
in response to determining that the shipping cost exceeds the expected waste cost, add the second consumable to the shipment order.
