# US 2021/0342768 A1 · Reserve System and Method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0342768 A1
- Document ID: US20210342768A1
- Status: Published application
- Kind: A1
- Application number: 16/862,892
- Filed: 2020-04-30
- Published: 2021-11-04
- Earliest claimed: 2020-04-30
- Assignees: The Boeing Company
- Applicants: The Boeing Company
- Inventors: Oleksandr Basanets; Dhruv Raj Sharma
- Web page: https://patentgrep.com/patent/US20210342768A1

## CPC

- G06Q 10/063116: {Schedule adjustment for a person or group}
- G06N 5/04: Inference or reasoning models
- G06N 7/00: Computing arrangements based on specific mathematical models
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 50/40: Business processes related to the transportation industry (shipping G06Q10/083)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A reserve system and method for determining a quantity of forecasted reserve for a crew-grouping for a quantity of scheduled flights in a future time period is disclosed. The reserve system may comprise a controller configured to receive a crew-grouping and a quantity of scheduled flights for an aircraft in a future time period, and a historical data set associated with the crew-grouping for a previous time period. The controller is further configured to determine a quantity of forecasted reserve based on: an interquartile range of values in the historical data set for a quantity of actual used reserve of the crew-grouping per day for the aircraft; or the quantity of scheduled flights per day in the future time period and a transformed interquartile range of a plurality of data points associated with the historical data set; and to transmit the quantity of forecasted reserve to a crew rostering system.

## Claims

### Claim 1

A reserve system comprising:
a controller configured to:
receive a quantity of scheduled flights for an aircraft family or aircraft type for each day in a future time period;
receive a crew-grouping associated with the aircraft family or aircraft type;
receive a historical data set associated with the crew-grouping for a previous time period, the historical data set including a quantity of actual flights per day for the crew-grouping and a quantity of actual used reserve of the crew-grouping per day for the aircraft family or aircraft type;
determine a quantity of forecasted reserve for the crew-grouping for the quantity of scheduled flights in the future time period based on: (a) an interquartile range (IQR) of values in the historical data set for the quantity of actual used reserve of the crew-grouping per day for the aircraft family or aircraft type; or (b) the quantity of scheduled flights per day in the future time period and a transformed interquartile range (IQRT) of a plurality of data points associated with the historical data set; and
transmit the quantity of forecasted reserve to a crew rostering system in communication with the reserve system,
wherein each of the plurality of data points comprises the quantity of actual used reserve of the crew-grouping per day and the quantity of actual flights per day associated with the quantity of actual used reserve of the crew-grouping per day.

### Claim 2 (depends on 1)

The reserve system of claim 1, wherein the crew-grouping includes a rank and a base.

### Claim 3 (depends on 2)

The reserve system of claim 2, wherein the crew-grouping further includes one or more technical qualifications.

### Claim 4 (depends on 1)

The reserve system of claim 1, wherein the quantity of forecasted reserve is further based on an outlier upper threshold for the IQR or a transformed outlier upper threshold for the IQRT.

### Claim 5 (depends on 1)

The reserve system of claim 1, in which the controller is further configured to determine a coefficient of determination for a continuous linear regression model fitted to the plurality of data points.

### Claim 6 (depends on 5)

The reserve system of claim 5, in which the controller is further configured to plot the plurality of data points and to fit the continuous linear regression model to the plurality of data points.

### Claim 7 (depends on 5)

The reserve system of claim 5, wherein the controller is configured to, when the coefficient of determination is at least a coefficient threshold, determine the quantity of forecasted reserve based on the quantity of scheduled flights per day in the future time period and the IQRT of the plurality of data points associated with the historical data set.

### Claim 8 (depends on 5)

The reserve system of claim 5, wherein the controller is configured to, when the coefficient of determination is less than a coefficient threshold, determine the quantity of forecasted reserve based on the IQR of the values in the historical data set for the quantity of actual used reserve of the crew-grouping per day for the aircraft family or aircraft type.

### Claim 9

A method for determining a quantity of forecasted reserve for scheduling a reserve crew, the method comprising:
receiving, by a controller, a quantity of scheduled flights for an aircraft for each day in a future time period;
receiving, by the controller, a crew-grouping associated with the aircraft;
receiving, by the controller, a historical data set associated with the crew-grouping for a previous time period, the historical data set including a quantity of actual flights per day for the crew-grouping and a quantity of actual used reserve of the crew-grouping per day for the aircraft;
determining, by the controller, the quantity of forecasted reserve for the crew-grouping for the quantity of scheduled flights in the future time period based on: (a) an interquartile range (IQR) of values in the historical data set for the quantity of actual used reserve of the crew-grouping per day for the aircraft; or (b) the quantity of scheduled flights per day in the future time period and a transformed interquartile range (IQRT) of a plurality of data points associated with the historical data set; and
providing the quantity of forecasted reserve to a crew rostering system for scheduling a crew member as reserve crew for the crew-grouping,
wherein each of the plurality of data points comprises the quantity of actual used reserve of the crew-grouping per day and the quantity of actual flights per day associated with the quantity of actual used reserve of the crew-grouping per day, and
wherein the aircraft is an aircraft family or an aircraft type.

### Claim 10 (depends on 9)

The method of claim 9, wherein the aircraft is an aircraft type.

### Claim 11 (depends on 10)

The method of claim 10, wherein the crew-grouping includes a rank, a base and a technical qualification.

### Claim 12 (depends on 9)

The method of claim 9, wherein the crew-grouping includes a rank and a base.

### Claim 13 (depends on 9)

The method of claim 9, wherein the quantity of forecasted reserve is based on an outlier upper threshold for the IQR or a transformed outlier upper threshold for the IQRT.

### Claim 14 (depends on 13)

The method of claim 13 further comprising determining, by the controller, a coefficient of determination for a continuous linear regression model fitted to the plurality of data points.

### Claim 15 (depends on 14)

The method of claim 14, wherein, when the coefficient of determination is less than a coefficient threshold, determining the quantity of forecasted reserve based on the IQR of the values in the historical data set for the quantity of actual used reserve of the crew-grouping per day for the aircraft.

### Claim 16 (depends on 14)

The method of claim 14, wherein, when the coefficient of determination is at least a coefficient threshold, determining the quantity of forecasted reserve based on the quantity of scheduled flights per day in the future time period and the IQRT of the plurality of data points associated with the historical data set.

### Claim 17

A reserve system comprising:
a controller configured to:
receive a quantity of scheduled flights for an aircraft family or an aircraft type for each day in a future time period;
receive a crew-grouping associated with the aircraft family or aircraft type;
receive a historical data set associated with the crew-grouping for a previous time period, the historical data set including a quantity of actual flights for each day for the crew-grouping in the previous time period and a quantity of actual used reserve of the crew-grouping each day for the aircraft family or the aircraft type in the previous time period;
plot plurality of data points for a plurality of days in the previous time period to create a scatter plot, each data point of the plurality of data points representative of a quantity of actual used reserve of the crew-grouping associated with the quantity of actual flights on a day in the plurality of days;
determine a coefficient of determination for a continuous linear regression model fitted to the plot of the plurality of data points;
when the coefficient of determination is at least a coefficient threshold, determine a quantity of forecasted reserve based on the quantity of scheduled flights per day in the future time period and an IQRT of the plurality of data points associated with the historical data set;
when the coefficient of determination is less than the coefficient threshold, determine the quantity of forecasted reserve based on an IQR of values in the historical data set for the quantity of actual used reserve of the crew-grouping per day for the aircraft family or aircraft type; and
transmit the quantity of forecasted reserve to a crew rostering system configured to schedule a crew member as reserve crew for the crew-grouping.

### Claim 18 (depends on 17)

The reserve system of claim 17, wherein the crew-grouping includes a rank and a base.

### Claim 19 (depends on 18)

The reserve system of claim 18, wherein the crew-grouping further includes one or more technical qualifications.

### Claim 20 (depends on 17)

The reserve system of claim 17, wherein the quantity of forecasted reserve is further based on: (a) an outlier upper threshold for the IQR when the coefficient of determination is less than the coefficient threshold and (b) a transformed outlier upper threshold for the IQRT when the coefficient of determination is at least the coefficient threshold.
