# US 2021/0342246 A1 · Software Conversion Downtime Prediction Tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0342246 A1
- Document ID: US20210342246A1
- Status: Published application
- Kind: A1
- Application number: 16/866,332
- Filed: 2020-05-04
- Published: 2021-11-04
- Earliest claimed: 2020-05-04
- Assignees: Sap SE
- Applicants: Sap SE
- Inventors: Peter Schreiber; Peter Datsichin; Michael Wirtz; Anton Golubev; Mathias Klein
- Web page: https://patentgrep.com/patent/US20210342246A1

## CPC

- G06F 11/3428: {Benchmarking}
- G06F 8/51: Source to source
- G06F 11/3452: {Performance evaluation by statistical analysis}
- G06F 17/18: for evaluating statistical data {, e.g. average values, frequency distributions, probability functions, regression analysis (forecasting specially adapted for a specific administrative, business or logistic context G06Q10/04)}
- G06F 2201/865: Monitoring of software
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Downtime resulting from converting a software program from a source system to a target system, is forecast, explored, and optimized. A benchmark for a practice conversion test run (including a downtime component) is received as a first input and displayed for exploration. A second input is received comprising a statistic stored in a conversion database and reflecting a prior actual software conversion process run. The benchmark and the statistic are processed with reference to an expert rule set, to generate an optimized result comprising an updated benchmark having a changed downtime component. The updated benchmark including the changed downtime component, is displayed. Processing may occur in conjunction with further input comprising an acceptance of a generated recommendation, and/or changing a data volume of the practice conversion test run. Embodiments may feed back to the conversion database, statistics resulting from a formal software conversion run conducted according to the optimized result.

## Claims

### Claim 1

A method comprising:
receiving a benchmark for a practice software conversion process test run, the benchmark comprising an uptime component and a downtime component, the downtime component comprising a first constituent phase and a second constituent phase;
displaying in a user interface, the benchmark including the downtime component;
receiving a statistic stored in a conversion database and reflecting a prior software conversion process;
processing the benchmark and the statistic with reference to an expert rule set to generate an optimized result comprising an updated benchmark having a changed downtime component; and
displaying in the user interface, the updated benchmark including the changed downtime component.

### Claim 2 (depends on 1)

A method as in claim 1 further comprising:
generating a recommendation from the benchmark, wherein the processing is further performed in conjunction with an input accepting the recommendation.

### Claim 3 (depends on 1)

A method as in claim 1 wherein the processing is further performed in conjunction with an ad hoc input based upon the benchmark.

### Claim 4 (depends on 1)

A method as in claim 1 wherein:
the practice software conversion test run is based upon a data volume; and
the processing is further performed in conjunction with an input changing the data volume.

### Claim 5 (depends on 1)

A method as in claim 1 further comprising adding to the conversion database, statistical data fed back from a formal software conversion run conducted according to the optimized result.

### Claim 6 (depends on 1)

A method as in claim 1 wherein the changed downtime component is displayed as a bar having a first color different from a second color of a bar representing the uptime.

### Claim 7 (depends on 1)

A method as in claim 1 wherein:
the first constituent phase comprises a first constituent underphase; and
displaying the business downtime comprises displaying the first constituent underphase proximate to the first constituent phase.

### Claim 8 (depends on 1)

A method as in claim 1 wherein:
the conversion database comprises an in-memory database; and
the processing is performed by an in-memory database engine of the in-memory database.

### Claim 9

A non-transitory computer readable storage medium embodying a computer program for performing a method, said method comprising:
receiving a benchmark for a practice software conversion process test run, the benchmark comprising an uptime component and a downtime component, the downtime component comprising a first constituent phase and a second constituent phase;
displaying in a user interface, the benchmark including the downtime component;
receiving a statistic stored in a conversion database and reflecting a prior software conversion process;
generating a recommendation from the benchmark;
processing the benchmark and the statistic with reference to acceptance of the recommendation and an expert rule set to generate an optimized result comprising an updated benchmark having a changed downtime component; and
displaying in the user interface, the updated benchmark including the changed downtime component.

### Claim 10 (depends on 9)

A non-transitory computer readable storage medium as in claim 9 wherein:
the practice software conversion test run is based upon a data volume; and
the processing is further performed in conjunction with an input changing the data volume.

### Claim 11 (depends on 9)

A non-transitory computer readable storage medium as in claim 9 further comprising adding to the conversion database, statistical data fed back from a formal software conversion run conducted according to the optimized result.

### Claim 12 (depends on 9)

A non-transitory computer readable storage medium as in claim 9 wherein the changed downtime component is displayed with a first color different from a second color of a bar representing the uptime.

### Claim 13 (depends on 12)

A non-transitory computer readable storage medium as in claim 12 wherein the changed downtime component is displayed as a bar labeled with a time duration.

### Claim 14 (depends on 9)

A non-transitory computer readable storage medium as in claim 9 wherein:
the conversion database comprises an in-memory database; and
the processing is performed by an in-memory database engine of the in-memory database.

### Claim 15

A computer system comprising:
one or more processors;
a software program, executable on said computer system, the software program configured to cause an in-memory database engine of an in-memory database to:
receive a benchmark for a practice software conversion process test run, the benchmark comprising an uptime component and a downtime component, the downtime component comprising a first constituent phase and a second constituent phase;
display in a user interface, the benchmark including the downtime component;
receive a statistic stored in the in-memory database and reflecting a prior software conversion process;
process the benchmark and the statistic with reference to an expert rule set to generate an optimized result comprising an updated benchmark having a changed downtime component; and
display in the user interface, the updated benchmark including the changed downtime component.

### Claim 16 (depends on 15)

A computer system as in claim 15 wherein the in-memory database engine is further configured to:
generate a recommendation from the benchmark; and
process the benchmark and the statistic further in conjunction with an input accepting the recommendation.

### Claim 17 (depends on 15)

A computer system as in claim 15 wherein:
the practice software conversion test run is based upon a data volume; and
the in-memory database engine is configured to process the benchmark and the statistic further in conjunction with an input changing the data volume.

### Claim 18 (depends on 15)

A computer system as in claim 15 wherein the in-memory database engine is further configured to add to the in-memory database, statistical data fed back from a formal software conversion run conducted according to the optimized result.

### Claim 19 (depends on 15)

A computer system as in claim 15 wherein the changed downtime component is displayed in a first color different from the uptime component.

### Claim 20 (depends on 15)

A computer system as in claim 15 wherein the changed downtime component is displayed as a bar labeled with a time duration.
