# US 2021/0341933 A1 · Multi-segment turns

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0341933 A1
- Document ID: US20210341933A1
- Status: Published application
- Kind: A1
- Application number: 16/863,056
- Filed: 2020-04-30
- Published: 2021-11-04
- Earliest claimed: 2020-04-30
- Assignees: Trimble Inc.
- Applicants: Trimble Inc.
- Inventors: Shantnu Kakkar; Juan Carlos Santamaria; Justin Creaby; Brandon Sights
- Web page: https://patentgrep.com/patent/US20210341933A1

## CPC

- G05D 1/0219: {ensuring the processing of the whole working surface}
- G01C 21/005: {with correlation of navigation data from several sources, e.g. map or contour matching (G01C21/30 takes precedence)}
- G01C 21/20: Instruments for performing navigational calculations (G01C21/24, G01C21/26 take precedence)
- G01S 19/42: Determining position
- G05D 1/0212: {with means for defining a desired trajectory (involving a plurality of land vehicles G05D1/0287)}
- G05D 1/0278: {using satellite positioning signals, e.g. GPS}
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- G01S: RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES

## Abstract

A method of path planning for a vehicle includes receiving a request for a turn from a current swath to a next swath, receiving information of the current swath and information of the next swath, determining a trajectory of the turn based on the information of the current swath and the information of the next swath, and outputting the trajectory to a control system of the vehicle for executing the turn. The trajectory includes a first segment and a second segment. The first segment starts from a beginning position of the turn at the current swath and ends at an intermediate position; and the second segment starts from the intermediate position and ends at an ending position of the turn at the next swath. The vehicle changes from a forward gear to a reverse gear, or vice versa, as the vehicle transitions from the first segment to the second segment.

## Claims

### Claim 1

A method of path planning for an autonomous vehicle, the method comprising:
receiving a request for a two-segment turn of a vehicle from a current swath to a next swath in a work area;
in response to receiving the request, receiving information of the current swath and information of the next swath;
determining a trajectory of the turn based on the information of the current swath and the information of the next swath, the trajectory including a first segment and a second segment, wherein:
the first segment starts from a beginning position of the turn at the current swath and ends at an intermediate position; and
the second segment starts from the intermediate position and ends at an ending position of the turn at the next swath, wherein the vehicle changes from a forward gear to a reverse gear, or vice versa, as the vehicle transitions from the first segment to the second segment; and
outputting the trajectory to a control system of the vehicle for executing the turn by following the first segment and the second segment of the trajectory successively.

### Claim 2 (depends on 1)

The method of claim 1, wherein the request specifies the turn to be within a boundary, the method further comprising:
receiving information of the boundary;
wherein determining the trajectory of the turn is performed further based on the information of the boundary, and wherein the trajectory of the turn is confined within the boundary.

### Claim 3 (depends on 1)

The method of claim 1, wherein the request specifies the turn to follow a guidance line in a headland at a periphery of the work area, the method further comprising:
receiving information of the guidance line;
wherein determining the trajectory of the turn is performed further based on the information of the guidance line, and wherein at least a portion of the second segment of the trajectory follows the guidance line.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
receiving a current position of the vehicle;
wherein determining the trajectory of the turn is performed further based on the current position of the vehicle, and wherein the trajectory further includes a third segment that starts from the current position of the vehicle and ends at the beginning position of the turn, and the third segment is to be executed before the first segment and the second segment are executed.

### Claim 5 (depends on 3)

The method of claim 3, wherein the request specifies moving to an end position of the current swath before the turn, and wherein determining the trajectory of the turn is performed further based on the end position of the current swath, and the trajectory further includes:
a third segment that starts from a current position of the vehicle and ends at the end position of the current swath; and
a fourth segment that starts from the end position of the current swath and ends at the beginning position of the turn;
wherein the third segment and the fourth segment are to be executed successively before the first segment and the second segment are executed.

### Claim 6 (depends on 3)

The method of claim 3, wherein the request specifies moving to a beginning position of the next swath after the turn, and wherein determining the trajectory of the turn is performed further based on the beginning position of the next swath, and the trajectory further includes:
a third segment that starts from the ending position of the turn and ends at the beginning position of the next swath, wherein the third segment is to be executed after the first segment and the second segment are executed.

### Claim 7 (depends on 3)

The method of claim 3, wherein the guidance line is curved.

### Claim 8 (depends on 1)

The method of claim 1, wherein determining the trajectory of the turn is performed such that a total distance traversed by the vehicle along the first segment and the second segment is minimized.

### Claim 9 (depends on 1)

The method of claim 1, wherein at least one of the current swath and the next swath is curved.

### Claim 10 (depends on 1)

The method of claim 1, wherein the current swath and the next swath are parallel to each other, or not parallel to each other.

### Claim 11 (depends on 1)

The method of claim 1, wherein:
in response to determining that the vehicle is traversing the current swath in the forward gear before the turn, determining gear settings of the vehicle during the turn such that the vehicle traverses the first segment in the forward gear, and traverses the second segment in the reverse gear; and
in response to determining that the vehicle is traversing the current swath in the reverse gear before the turn, determining the gear settings of the vehicle during the turn such that the vehicle traverses the first segment in the reverse gear, and traverses the second segment in the forward gear.

### Claim 12 (depends on 1)

The method of claim 1, wherein the trajectory includes a plurality of points, each respective point of the plurality of points characterized by a respective two-dimensional spatial coordinate, a respective yaw angle, and a respective curvature of the vehicle, and the method further comprising:
determining a speed profile along the trajectory, the speed profile including a respective speed for each respective point of the plurality of points; and
outputting the speed profile to the control system of the vehicle.

### Claim 13 (depends on 1)

The method of claim 1, wherein the vehicle has an implement attached thereto, and the method further comprising:
determining an implement profile along the trajectory; and
outputting the implement profile to the control system of the vehicle.

### Claim 14 (depends on 1)

The method of claim 1, further comprising:
displaying the trajectory on a user display.

### Claim 15

A method of path planning for an autonomous vehicle, the method comprising:
receiving a request for a three-segment turn of a vehicle from a current swath to a next swath in a work area, the request specifying the turn to follow a guidance line in a headland at a periphery of the work area;
in response to receiving the request, receiving information of the current swath, information of the next swath, and information of the guidance line;
determining a trajectory of the turn based on the information of the current swath, the information of the next swath, and the information of the guidance line, the trajectory including a first segment, a second segment, and a third segment, wherein:
the first segment starts from a beginning position of the turn at the current swath and ends at a first intermediate position on the guidance line;
the second segment starts from the first intermediate position, moving along the guidance line, and ends at a second intermediate position on the guidance line, wherein the vehicle changes from a forward gear to a reverse gear, or vice versa, as the vehicle transitions from the first segment to the second segment; and
the third segment starts from the second intermediate position and ends at an ending position of the turn at the next swath, wherein the vehicle changes from the reverse gear to the forward gear, or vice versa, as the vehicle transitions from the second segment to the third segment; and
outputting the trajectory to a control system of the vehicle for executing the turn by following the first segment, the second segment, and the third segment of the trajectory successively.

### Claim 16 (depends on 15)

The method of claim 15, wherein the guidance line is curved.

### Claim 17 (depends on 15)

The method of claim 15, wherein at least one of the current swath and the next swath is curved.

### Claim 18 (depends on 15)

The method of claim 15, wherein the current swath and the next swath are parallel to each other, or not parallel to each other.

### Claim 19 (depends on 15)

The method of claim 15, further comprising:
receiving a current position of the vehicle;
wherein determining the trajectory of the turn is performed further based on the current position of the vehicle, and wherein the trajectory further includes a fourth segment that starts from the current position of the vehicle and ends at the beginning position of the turn, and the fourth segment is to be executed before the first segment, the second segment, and the third segment are executed.

### Claim 20 (depends on 15)

The method of claim 15, wherein the request specifies moving to an end position of the current swath before the turn, and wherein determining the trajectory of the turn is performed further based on the end position of the current swath, and the trajectory further includes:
a fourth segment that starts from a current position of the vehicle and ends at the end of the current swath; and
a fifth segment that starts from the end of the current swath and ends at the beginning position of the turn; and
wherein the fourth segment and the fifth segment are to be executed successively before the first segment, the second segment, and the third segment are executed.

### Claim 21 (depends on 19)

The method of claim 19, wherein the request specifies moving to a beginning position of the next swath after the turn, and wherein determining the trajectory of the turn is performed further based on the beginning position of the next swath, and the trajectory further includes:
a fourth segment that starts from the ending position of the turn and ends at the beginning position of the next swath, wherein the fourth segment is to be executed after the first segment, the second segment, and the third segment are executed.

### Claim 22 (depends on 15)

The method of claim 15, wherein:
in the first segment of the trajectory, the vehicle moves from the beginning position of the turn toward the guidance line and in a direction toward the next swath;
in the second segment of the trajectory, the vehicle moves from the first intermediate position along the guidance line in a direction toward the current swath to the second intermediate position; and
in the third segment of the trajectory, the vehicle moves from the second intermediate position toward the next swath.

### Claim 23 (depends on 15)

The method of claim 15, wherein:
in the first segment of the trajectory, the vehicle moves from the beginning position of the turn toward the guidance line and in a direction away from the next swath;
in the second segment of the trajectory, the vehicle moves from the first intermediate position along the guidance line toward the next swath to the second intermediate position; and
in the third segment of the trajectory, the vehicle moves from the second intermediate position toward the next swath.

### Claim 24 (depends on 15)

The method of claim 15, wherein determining the trajectory of the turn is performed such that a total distance traversed by the vehicle along the first segment, the second segment, and the third segment is minimized.
