# US 2021/0341297 A1 · Route subdivision apparatus

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0341297 A1
- Document ID: US20210341297A1
- Status: Published application
- Kind: A1
- Application number: 17/272,969
- Filed: 2019-08-30
- Published: 2021-11-04
- Earliest claimed: 2018-09-06
- Assignees: Honda Motor Co., Ltd.
- Applicants: Honda Motor Co., Ltd.
- Inventors: Takahiro Oyama
- Web page: https://patentgrep.com/patent/US20210341297A1

## CPC

- G01C 21/3407: {specially adapted for specific applications}
- G01C 21/343: {Calculating itineraries (travelling salesman problem G06Q10/04; optimisation of routes G06Q10/047)}
- G06Q 10/047: Optimisation of routes or paths, e.g. travelling salesman problem
- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G08G 1/123: indicating the position of vehicles, e.g. scheduled vehicles; {Managing passenger vehicles circulating according to a fixed timetable, e.g. buses, trains, trams}(transmission of navigation instructions to vehicles G08G1/0968)
- G06Q 10/08355: {Routing methods}
- G08G 1/096811: {where the route is computed offboard}
- G01C: MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY (measuring liquid level G01F; radio navigation, determining distance or velocity by use of propagation effects, e.g. Doppler effects, propagation time, of radio waves, analogous arrangements using other waves G01S)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})

## Abstract

A route subdivision apparatus configured to subdivide a travel route for conducting work that includes: an area setting unit configured to set a plurality of work areas on a map; a route setting unit configured to set a scheduled route from a start point to an end point so that the scheduled route passes through consecutive first to third areas of the plurality of work areas; an entry/exit point setting unit f configured to set an entry point and an exit point of the scheduled route in each work area; a boundary setting unit configured to set a boundary point between the exit point of the first area and the entry point of the second area and between the exit point of the second area and the entry point of the third area; and a distance calculation unit configured to calculate a length of a distance of each section divided by the boundary point on the scheduled route.

## Claims

### Claim 1

A route subdivision apparatus configured to subdivide a travel route for conducting work, comprising:
a microprocessor and a memory coupled to the microprocessor, wherein
the microprocessor is configured to function as:
an area setting unit configured to set a plurality of work areas on a map;
a route setting unit configured to set a scheduled route from a start point to an end point so that the scheduled route passes consecutively through a first area, a second area, and a third area of the plurality of work areas;
an entry/exit point setting unit configured to set an entry point and an exit point of the scheduled route set by the route setting unit in each work area of the plurality of work areas;
a boundary setting unit configured to set a boundary point between the exit point of the first area and the entry point of the second area and between the exit point of the second area and the entry point of the third area; and
a distance calculation unit configured to calculate a length of a distance of each section divided by a plurality of the boundary points set by the boundary setting unit on the scheduled route.

### Claim 2 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the microprocessor is configured to function as:
a required time calculation unit configured to calculate a required time for passing through the length of the distance based on the length of the distance calculated by the distance calculation unit and a predetermined scheduled travel speed.

### Claim 3 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the route setting unit sets the scheduled route so that the scheduled route passes through the start point and then the first area, wherein
the boundary setting unit further sets the boundary point between the start point and the entry point of the first area.

### Claim 4 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the route setting unit sets the scheduled route so that the scheduled route passes through the third area and then the end point, wherein
the boundary setting unit further sets the boundary point between the exit point of the third area and the end point.

### Claim 5 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the area setting unit sets a non-work area between the first area and the second area or between the second area and the third area, wherein
the boundary setting unit further sets the boundary point between the first area or the second area immediately before the non-work area, and between the non-work area and the second area or the third area immediately behind the non-work area.

### Claim 6 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the area setting unit sets a non-work area between the first area and the second area or between the second area and the third area when the length of the distance between the exit point of the first area and the entry point of the second area or between the exit point of the second area and the entry point of the third area on the scheduled route is equal to or longer than a predetermined value, wherein
the boundary setting unit further sets the boundary point between the first area or the second area immediately before the non-work area and between the non-work area and the second area or the third area immediately behind the non-work area.

### Claim 7 (depends on 3)

The route subdivision apparatus according to claim 3, wherein
the area setting unit sets a non-work area between the start point and the first area, wherein
the boundary setting unit sets the boundary point between the start point and the non-work area and between the non-work area and the entry point of the first area.

### Claim 8 (depends on 4)

The route subdivision apparatus according to claim 4, wherein
the area setting unit sets a non-work area between the third area and the end point, wherein
the boundary setting unit sets the boundary point between the exit point of the third area and the non-work area and between the non-work area and the end point.

### Claim 9 (depends on 1)

The route subdivision apparatus according to claim 1, wherein
the microprocessor is configured to function as:
an information acquisition unit configured to acquire location information of a worker who conducts work traveling on the plurality of work areas and time information corresponding to the location information; and
a route calculation unit configured to calculate an actual route of the worker based on the location information and the time information acquired by the information acquisition unit, wherein
the required time calculation unit further calculates a required time for passing through each section divided by a plurality of the boundary points set by the boundary setting unit on the actual route calculated by the route calculation unit based on the time information acquired by the information acquisition unit.

### Claim 10

A route subdivision apparatus configured to subdivide a travel route for conducting work, comprising:
a microprocessor and a memory coupled to the microprocessor, wherein
the microprocessor is configured to perform:
setting a plurality of work areas on a map;
setting a scheduled route from a start point to an end point so that the scheduled route passes consecutively through a first area, a second area, and a third area of the plurality of work areas;
setting an entry point and an exit point of the scheduled route in each work area of the plurality of work areas;
setting a boundary point between the exit point of the first area and the entry point of the second area and between the exit point of the second area and the entry point of the third area; and
calculating a length of a distance of each section divided by a plurality of the boundary points on the scheduled route.

### Claim 11 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
calculating a required time for passing through the length of the distance based on the length of the distance and a predetermined scheduled travel speed.

### Claim 12 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
the route setting including setting the scheduled route so that the scheduled route passes through the start point and then the first area; and
the boundary setting including further setting the boundary point between the start point and the entry point of the first area.

### Claim 13 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
the route setting including setting the scheduled route so that the scheduled route passes through the third area and then the end point; and
the boundary setting including further setting the boundary point between the exit point of the third area and the end point.

### Claim 14 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
the area setting including setting a non-work area between the first area and the second area or between the second area and the third area; and
the boundary setting including further setting the boundary point between the first area or the second area immediately before the non-work area, and between the non-work area and the second area or the third area immediately behind the non-work area.

### Claim 15 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
the area setting including setting a non-work area between the first area and the second area or between the second area and the third area when the length of the distance between the exit point of the first area and the entry point of the second area or between the exit point of the second area and the entry point of the third area on the scheduled route is equal to or longer than a predetermined value; and
the boundary setting including further setting the boundary point between the first area or the second area immediately before the non-work area, and between the non-work area and the second area or the third area immediately behind the non-work area.

### Claim 16 (depends on 12)

The route subdivision apparatus according to claim 12, wherein
the microprocessor is configured to perform:
the area setting including setting a non-work area between the start point and the first area; and
the boundary setting including setting the boundary point between the start point and the non-work area and between the non-work area and the entry point of the first area.

### Claim 17 (depends on 13)

The route subdivision apparatus according to claim 13, wherein
the microprocessor is configured to perform:
the area setting including setting a non-work area between the third area and the end point; and
the boundary setting including setting the boundary point between the exit point of the third area and the non-work area and between the non-work area and the end point.

### Claim 18 (depends on 10)

The route subdivision apparatus according to claim 10, wherein
the microprocessor is configured to perform:
acquiring location information of a worker who conducts work traveling on the plurality of work areas and time information corresponding to the location information; and
calculating an actual route of the worker based on the location information and the time information acquired in the acquiring, wherein
the microprocessor is configured to perform:
the required time calculating including further calculating a required time for passing through each section divided by a plurality of the boundary points on the actual route calculated in the calculating based on the time information acquired in the acquiring.
