- Number: US 2021/0340872 A1
- Document ID: US20210340872A1
- Status: Published application
- Kind: A1
- Application number: 16/624,541
- Filed: 2018-10-29
- Published: 2021-11-04
- Earliest claimed: 2018-08-20
- Assignees: China University of Mining and Technology
- Applicants: China University of Mining and Technology
- Inventors: Nong ZHANG; Zhengzheng Xie; Junyao Zhou; Qun Wei
- Web page: https://patentgrep.com/patent/US20210340872A1

## CPC

- E21D 20/026: {Cartridges; Grouting charges}
- E21D 20/021: {Grouting with inorganic components, e.g. cement}
- E21D 21/0006: {characterised by the bolt material}
- E21D 21/0033: {having a jacket or outer tube}
- E21D 21/006: {Anchoring-bolts made of cables or wires}
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)

## Abstract

The present invention provides a single-anchor centrally grouted full-length anchored steel wire bundle and a supporting method thereof, which are suitable for use in supporting engineering for the deep dynamic pressure roadway or soft rock roadway. The steel wire bundle consists of parallel steel wires and a central pipe, wherein multiple strands of parallel steel wires are arranged around the central pipe, the central pipe is provided with a slurry output bracket which divides the parallel steel wires into a front part and a rear part, the front part is provided with large stirring jackets, and the rear part is provided with a threaded casing on its tail end. After the coal is cut by a tunneling machine and a roadway is formed, the steel wire bundle is anchored at the ends, and the roadway tunneling speed is increased on a premise of ensuring roadway safety; central grouting is carried out for the steel wire bundle with a pump truck without affecting the quick roadway tunneling, so as to anchor the steel wire bundle in full length and ensure long-time stability of the roadway. The length of the steel wire bundle may be selected according to the geological conditions and the mining environment of the mine, and is not limited by the height of the roadway; the single-anchor centrally grouted supporting method realizes full-length anchoring of the steel wire bundle, and it not only improves the roadway tunneling speed and relieves mining imbalance in the mine, but also solves the problem of large deformation of the roadway.

## Claims

### Claim 1

A single-anchor centrally grouted full-length anchored steel wire bundle, comprising a main body of steel wire bundle and a tray and a nut arranged on a tail end of the main body of steel wire bundle, wherein, the main body of steel wire bundle comprises a central pipe and multiple strands of parallel steel wires which are arranged in parallel around the central pipe and in the same length as the central pipe, the central pipe is provided with a slurry output bracket which divides the main body of steel wire bundle into a front part and a rear part, the front part of the main body of steel wire bundle is provided with a plurality of large stirring jackets, the rear part of the main body of steel wire bundle is provided with a plurality of clamps at intervals, a threaded casing is provided on the tail end of the rear part of the main body of steel wire bundle, a slurry stop plug is provided on the main body of steel wire bundle at the front end of the threaded casing, the threaded casing is divided into a front part and a rear part, the front part of the threaded casing is provided with a plurality of welding grooves II, the rear part of the threaded casing is provided with threads on the outside, and the tray and the nut are arranged on the threads.

### Claim 2 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the central pipe is hollow and comprises a steel pipe and a plastic hose, the plastic hose is arranged at the front end, the steel pipe is arranged at the rear end, the threaded casing and the slurry stop plug are arranged outside the main body of steel wire bundle at the steel pipe, the central pipe in the remaining part of the main body of steel wire bundle is the plastic hose, barbs are arranged in the interior of a port of the plastic hose, the plastic hose is connected with the steel pipe via the barbs, the central pipe has a wall thickness of 1.5 millimeter-2.5 mm and a length of 3,000 mm-4,000 mm, the steel pipe has a length of 400 mm-600 mm, the plastic hose has a length of 2,500 mm-3,500 mm, and the steel pipe is connected with the plastic hose via the barbs so that the central pipe is sealed at the joint.

### Claim 3 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the slurry output bracket comprises a hollow spindle-shaped pressure bearing body, U-shaped limit grooves matching the number and diameter of the parallel steel wires and a plurality of slurry outlets connected with the interior of the central pipe are arranged on the thickest part of a middle section of the pressure bearing body, the tail end of the pressure bearing body is provided with an interface for connection with the central pipe, the parallel steel wires fix the slurry output bracket by means of the limit grooves, the surfaces of the spindle-shaped pressure bearing body are fitted to the parallel steel wires, the bottom of the limit groove has a diameter of 5 millimeter-9 mm at the position where the steel wire is fixed, the slurry outlets and the limit grooves are arranged in misalignment, the slurry outlets has a diameter of 3 mm-6 mm for discharge of the slurry, and the plurality of slurry outlets decrease the probability of grouting failure resulted from clogging of the slurry outlets.

### Claim 4 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the large stirring jacket is a hollow tubular structure and have a plurality of welding grooves I on both ends respectively, the welding grooves on the front end and the rear end of the large stirring jacket are located at the grooves between two parallel steel wires, stirring threads with the height of 5 millimeter and the thickness of 1 mm are arranged on the middle part of the large stirring jacket to facilitate stirring of an anchoring agent.

### Claim 5 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, there are 6 strands of parallel steel wires, which are made of cold-drawn low-carbon steel wires with the diameter of 4 millimeter-8 mm and the length of 3,000 mm-4,000 mm.

### Claim 6 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the welding groove of the threaded casing is located at the groove between two parallel steel wires, and has threads on the tail part, and the inner diameter of the threaded casing is 12-24 millimeter.

### Claim 7 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the slurry stop plug is a rubber product in a horn shape, the inner diameter of a narrower opening of which is 12-24 millimeter, the inner diameter of a wider opening of which is 15-30 mm and the wall thickness of which is 2 mm, for sealing the slurry and preventing the slurry from flowing out of the hole.

### Claim 8 (depends on 1)

The single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, the clamps have a width of 8 millimeter and a thickness of 1 mm for fastening the steel wire bundle, and the number of the clamps is determined according to the length of the steel wire bundle.

### Claim 9 (depends on 1)

A supporting method using the single-anchor centrally grouted full-length anchored steel wire bundle according to claim 1, wherein, it comprises the following steps:
after cutting the coal with a tunneling machine, drilling an anchor rod borehole in the roadway roof with a jumbolter, wherein the length of the borehole is 100 millimeter-150 mm smaller than the length of anchor rod;
putting a resin cartridge into the borehole and then the steel wire bundle, screwing the steel wire bundle into the borehole with the jumbolter, and utilizing the large stirring jacket at the front end of the steel wire bundle to stir the resin cartridge thoroughly to enhance the cohesion force between the resin cartridge and the roof strata;
mounting a slurry stop plug, a tray and a nut on the tail end of the steel wire bundle sequentially, then applying pre-tightening force to the steel wire bundle; thus, the anchoring work of the ends of the steel wire bundle is finished; and
subsequently, performing central grouting for the steel wire bundle with a mobile pump truck without affecting quick tunneling of the working face; connecting a plurality of grouting pipes on the mobile pump truck to the central pipe in the steel wire bundle and starting grouting, so that the slurry flows through the central pipe via the grouting pipes and flows out of the slurry outlets of the slurry output bracket, after the entire borehole is fully filled with the slurry, loading the grouting pressure to 2 Megapascals and maintaining the grouting pressure for 5 minutes, then stopping the grouting and waiting for curing; thus, the steel wire bundle is anchored in full length so that the multiple strands of parallel steel wires form an organic whole and bear the stress uniformly when the rock mass deforms, and thereby the problem of large deformation and instability of the roadway is solved.