# US 2021/0340824 A1 · Systems and methods for tubular element handling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0340824 A1
- Document ID: US20210340824A1
- Status: Published application
- Kind: A1
- Application number: 17/374,434
- Filed: 2021-07-13
- Published: 2021-11-04
- Earliest claimed: 2018-07-23
- Assignees: Helmerich & Payne, Inc.
- Applicants: Helmerich & Payne, Inc.
- Inventors: Jerry Ray PRESCOTT; Joel FERLAND; Matthew Wyatt MACDANIELS; Christopher Alan MAJOR; Patrick L. GUSTAFSON; Robert Lee STAUDER; Bernard L. COOK; DeWayne SPEER
- Web page: https://patentgrep.com/patent/US20210340824A1

## CPC

- E21B 15/00: Supports for the drilling machine, e.g. derricks or masts
- E21B 19/00: Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B 19/165: {Control or monitoring arrangements therefor}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A system and method for transferring tubular elements may include a first structure having a first horizontal platform attached to the first structure on a bottom side and a monorail attached to the first structure on a top side, a second structure having a second horizontal platform attached to the second structure. The first structure and the second structure may be located proximate to each other, while the monorail can extend from the first structure to the second structure. The monorail can have a motion controlled assembly to move a tubular element or assembly of tubular elements.

## Claims

### Claim 1

A system for transferring tubular elements, comprising:
a first drilling structure, wherein the first drilling structure has a first portion of a monorail attached thereto proximate a top portion of the first drilling structure;
a second drilling structure, wherein the second drilling structure has a second portion of the monorail attached thereto proximate a top portion of the second drilling structure;
wherein the first drilling structure and the second drilling structure are located proximate to each other, and wherein the monorail extends between the first drilling structure and the second drilling structure; and
wherein the monorail has a movable trolley attached to the monorail and the movable trolley is configured to hold a tubular element or assembly of tubular elements and move from a first position proximate the first drilling structure to a second position proximate the second drilling structure.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the movable trolley is movable in response to an operator command.

### Claim 3 (depends on 1)

The system according to claim 1, wherein the first drilling structure and the second drilling second structure are attached to a first drilling rig and a second drilling rig, respectively, at substantially a same height.

### Claim 4 (depends on 1)

The system according to claim 1, wherein the movable trolley is configured to lift a tubular element or assembly of tubular elements in response to an operator command.

### Claim 5 (depends on 1)

The system according to claim 1, wherein the movable trolley is configured to lower a tubular element or assembly of tubular elements in response to an operator command.

### Claim 6 (depends on 1)

The system according to claim 1, wherein the first drilling structure is located proximate to a first well borehole that contains a portion of a drillstring.

### Claim 7 (depends on 6)

The system according to claim 6, wherein the second drilling structure is located proximate to a second well borehole.

### Claim 8 (depends on 7)

The system according to claim 7, wherein the first drilling structure is configured to move a tubular element or assembly of tubular elements from the drillstring in the first well borehole and transfer the tubular element or assembly of tubular elements to the second drilling structure.

### Claim 9

A method for drilling a well, comprising:
positioning a first drilling rig proximate to a surface location for drilling a first wellbore;
positioning a second drilling rig proximate to a surface location of a second wellbore and proximate to the first drilling rig, wherein the first drilling rig and the second drilling rig each comprise a structure having a portion of a monorail attached thereto, wherein the monorail has a movable trolley attached thereto, and wherein the movable trolley is configured to move a tubular element or assembly of tubular elements from the second drilling rig to the first drilling rig;
with the second drilling rig, breaking out a connection of a tubular element or assembly of tubular elements from a drillstring of the second wellbore;
lifting the tubular element or assembly of tubular element elements; and
with the movable trolley, moving the tubular element or assembly of tubular elements from a first position from the second drilling rig to a second position at the first drilling rig.

### Claim 10 (depends on 9)

The method according to claim 9, further comprising:
attaching the tubular element or assembly of tubular elements to a drillstring in the first wellbore;
releasing the tubular element or assembly of tubular elements from the a hoist; and
moving the movable trolley from the first drilling rig back to the second drilling rig.

### Claim 11 (depends on 9)

The method according to claim 9, further comprising:
drilling the first wellbore by the first drilling rig; and
tripping out the drillstring from the second wellbore by the second drilling rig.

### Claim 12 (depends on 9)

The method according to claim 9, wherein the method is automated and performed by a computer system executing computer software instructions stored on the computer system.

### Claim 13 (depends on 9)

The method according to claim 9, wherein the first drilling rig and the second drilling rig are 200 feet or less from one another.

### Claim 14 (depends on 9)

The method according to claim 9, wherein the method is performed in 60 seconds or less, 75 seconds or less, 90 seconds or less, or 120 seconds or less.

### Claim 15 (depends on 9)

The method according to claim 9, wherein performing the method takes from 40 seconds to 90 seconds to complete.

### Claim 16

A system for transferring tubular elements, comprising:
a first structure attached to a first drilling rig for drilling a first well;
a second structure attached to a second drilling rig for drilling a second well, wherein the first structure and the second structure are located within 200 feet of one another;
a monorail having a first portion attached to the first structure and a second portion attached to the second structure; and
a trolley attached to the monorail, wherein the trolley is configured to hold a tubular or assembly of tubulars and to move from a first position associated with the first structure to a second position associated with the second structure.

### Claim 17 (depends on 16)

The system according to claim 16, wherein movement of the trolley is responsive to an operator command.

### Claim 18 (depends on 16)

The system according to claim 16, wherein the first structure and the second structure are at substantially a same height.

### Claim 19 (depends on 16)

The system according to claim 16, wherein the trolley is configured to lift the tubular element or assembly of tubular elements in response to an operator command.

### Claim 20 (depends on 16)

The system according to claim 16, wherein the trolley is configured to lower the tubular element or assembly of tubular elements in response to an operator command.

### Claim 21 (depends on 16)

The system according to claim 16, wherein the first drilling rig is located proximate to a borehole of the first well that contains a portion of a drillstring.

### Claim 22 (depends on 21)

The system according to claim 21, wherein the second drilling rig is located proximate to a borehole of the second well.
