# US 2021/0340428 A1 · System and method for optimized production of hydrocarbons from shale oil reservoirs via cyclic injection

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0340428 A1
- Document ID: US20210340428A1
- Status: Published application
- Kind: A1
- Application number: 17/138,355
- Filed: 2020-12-30
- Published: 2021-11-04
- Earliest claimed: 2020-01-17
- Assignees: Shale Ingenuity, LLC
- Inventors: Robert A. Downey
- Web page: https://patentgrep.com/patent/US20210340428A1

## CPC

- C09K 8/594: Compositions used in combination with injected gas {, e.g. CO2 orcarbonated gas}(C09K8/592 takes precedence)
- E21B 43/16: Enhanced recovery methods for obtaining hydrocarbons
- E21B 43/166: {Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium (CO2 injection E21B43/164; steam injection E21B43/24)}
- E21B 43/168: {Injecting a gaseous medium}
- E21B 47/06: Measuring temperature or pressure
- E21B 49/087: {Well testing, e.g. testing for reservoir productivity or formation parameters}
- C09K 2208/10: Nanoparticle-containing well treatment fluids
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

System and method for the optimized production of hydrocarbons from shale oil reservoirs via cyclic injection to achieve an improved and optimal recovery of oil. The method can determine and optimize the composition of injected fluids to be injected, the rate, pressure and duration of injection, the production rate and pressure of produced fluids; can determine and utilize the optimum number of injection and production cycles; can determine the amount of soaking time (if any); and can determine the equipment design and operating characteristics to provide for the optimized injection of injection fluids, and the separation of produced fluids for both reinjection and delivery to sales or storage.

## Claims

### Claim 1

A method to increase the recovery of oil from shale reservoirs utilizing a cyclic injection and production process that comprises a plurality of injection and production periods, and wherein the method comprises the steps of:
(a) determining a hydrocarbon-containing composition for injection, wherein the hydrocarbon-containing composition is in a liquid state at surface injection conditions;
(b) determining a maximum injection rate and a maximum injection pressure in a well to be utilized during a plurality of injection and production periods;
(c) determining the maximum production rate of gases and liquids from the well and the minimum production pressure during the plurality of injection and production periods;
(d) injecting the hydrocarbon-containing composition for a period of time such that the pressure near the wellbore of the well reaches the determined maximum injection pressure during the injection period;
(e) producing the well for a period of time such that the pressure at the wellbore reaches the determined minimum production pressure;
(f) at or during the production period, assessing the composition of produced fluids and recalibrating a reservoir simulation model to determine the composition of the residual oil in the shale reservoir;
(g) processing the produced fluids at the surface to remove methane and ethane gases and hydrocarbons containing hexanes and greater molecular weight;
(h) adjusting the composition of the hydrocarbon-containing injection fluids;
(i) injecting the adjusted hydrocarbon-containing injection fluids; and
(j) performing the process of steps (a) through (i) repeatedly.

### Claim 2 (depends on 1)

The method of claim 1, wherein the injection and production process does not comprise a shut-in or soaking step between the injection and production process.

### Claim 3 (depends on 1)

The method of claim 1, wherein the injection and production process does comprise a shut-in or soaking step between the injection and production process.

### Claim 4 (depends on 1)

The method of claim 1, wherein the hydrocarbon-containing composition comprises a fluid selected from a group consisting of ethane, propane, butane, heptane and hexane, carbon dioxide, and combinations thereof.

### Claim 5 (depends on 4)

The method of claim 4, wherein the hydrocarbon-containing composition further comprises a gaseous substance selected from a group consisting of methane and carbon monoxide.

### Claim 6 (depends on 1)

The method of claim 1, wherein the hydrocarbon-containing composition comprises a material selected from a group consisting of liquid surfactants, nano-surfactants, nanoparticles, and combinations thereof.

### Claim 7 (depends on 6)

The method of claim 6, wherein
(a) the hydrocarbon-containing composition further comprises a fluid selected from a group consisting of ethane, propane, butane, heptane and hexane, carbon dioxide, and combinations thereof; and
(b) the hydrocarbon-containing composition further comprises a gaseous substance selected from a group consisting of methane and carbon monoxide.

### Claim 8 (depends on 1)

The method of claim 1, wherein the step of determining the maximum injection rate and maximum injection pressure during the injection periods is determined based upon at least one of surface facilities capacities, reservoir and wellbore conditions, and operation constraints.

### Claim 9 (depends on 1)

The method of claim 1, wherein the step of determining the maximum production rate and minimum production pressure during the injection periods is determined based upon at least one of surface facilities capacities, reservoir and wellbore conditions, and operation constraints.

### Claim 10 (depends on 1)

The method of claim 1, wherein the hydrocarbon-containing composition is injected at a temperature of less than 50° F.

### Claim 11 (depends on 1)

The method of claim 1, wherein the increase in the recovery is an increase of at least 75% versus primary recovery EUR.

### Claim 12 (depends on 1)

The method of claim 1, wherein the increase in the recovery is an increase of at least 90% versus primary recovery EUR.

### Claim 13

A system for performing a method to increase the recovery of oil from a shale reservoir utilizing a cyclic injection and production process, wherein the system comprising:
(i) a storage unit for storing a hydrocarbon-containing composition for injection, wherein the hydrocarbon-containing composition is in a liquid state at surface injection conditions;
(ii) a plurality of wells operable for injecting and producing fluids from the shale reservoir;
(iii) production equipment for receiving the fluids produced from one or more of the plurality of wells;
(iv) a fluid separator operatively connected to the production equipment, wherein
(a) the fluid separator can separate the fluids produced from the one or more plurality of wells into recycled fluids, produced gas, and produced oil,
(b) the fluid separator is operatively connected to the storage unit to permit the flow of the recycled fluids to the storage unit,
(c) the hydrocarbon-containing composition comprises the recycled fluids, and
(d) the fluid separator is operable to adjust the composition of the recycled fluids; and
(v) a pumping system for injecting the hydrocarbon-containing composition into one or more the wells in the plurality of wells, wherein the system is operable to perform the method to increase the recovery of the oil from the shale reservoir utilizing the cyclic injection and production process, which method comprises the steps of
(a) determining the composition of the hydrogen-containing composition for injection,
(b) determining a maximum injection rate and a maximum injection pressure in a well in the plurality of wells to be utilized during a plurality of injection and production periods;
(c) determining the maximum production rate of gases and liquids from the well and the minimum production pressure during the plurality of injection and production periods;
(d) injecting the hydrocarbon-containing composition for a period of time such that the pressure near the wellbore of the well reaches the determined maximum injection pressure during the injection period;
(e) producing the well for a period of time such that the pressure at the wellbore reaches the determined minimum production pressure;
(f) at or during the production period, assessing the composition of produced fluids and recalibrating a reservoir simulation model to determine the composition of the residual oil in the shale reservoir;
(g) processing the produced fluids at the surface with the fluid separator to remove methane and ethane gases and hydrocarbons containing hexanes and greater molecular weight;
(h) adjusting the composition of the hydrocarbon-containing injection fluids;
(i) injecting the adjusted hydrocarbon-containing injection fluids; and
(j) performing the process of steps (v)(a) through (v)(i) repeatedly.

### Claim 14

A method comprising:
(i) utilizing a compositional reservoir simulation model to determine the composition of residual crude oil remaining in a shale reservoir;
(ii) utilizing the composition reservoir simulation model to determine the composition of injection fluid for a cyclic injection and production process recovery of the residual crude oil, wherein the injection fluid is a hydrocarbon-containing composition in a liquid state at surface injection conditions;
(iii) utilizing the composition reservoir simulation model to determine an injection period of time and a production period of time for the cyclic injection and production process in a well, wherein
(a) the injecting of the hydrocarbon-containing composition for the injection period of time results in the pressure near the wellbore of the well reaches a determined maximum injection pressure during the injection period of time, and
(b) the production of the well for the production period of time results in the pressure at the wellbore reaches a determined minimum production pressure;
(iv) performing the cyclic injection and production process in the well;
(v) at or during the production process, assessing the composition of the produced fluids and performing steps (i) through (iv) repeatedly.
