# US 2021/0332690 A1 · Method and system of combined support for a well drilling process

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0332690 A1
- Document ID: US20210332690A1
- Status: Published application
- Kind: A1
- Application number: 16/627,926
- Filed: 2019-09-18
- Published: 2021-10-28
- Earliest claimed: 2018-10-16
- Assignees: Obshchestvo s ogranichennoj otvetstvennost'yu "Geonavigacionnye tekhnologii"
- Applicants: Obshchestvo s ogranichennoj otvetstvennost'yu "Geonavigacionnye tekhnologii"
- Inventors: Sergej Igorevich Stishenko; Yurij Anatolevich Petrakov; Aleksej Evgenevich Sobolev
- Web page: https://patentgrep.com/patent/US20210332690A1

## CPC

- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 44/02: Automatic control of the tool feed ({E21B44/005,} E21B44/10 take precedence)
- E21B 47/02: Determining slope or direction
- G01V 20/00: Geomodelling in general
- E21B 7/04: Directional drilling
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

A method of combined tracking of the well drilling process includes the following steps: obtaining input data of the well under development, including inclinometer data, data from a well geophysical survey and core data; obtaining logging data of a key well; generating a combined model reflecting the rock characteristics and predicting the position of the well bore under development; determining the drilling trajectory of the well under development; calculating the synthetic log curve on the basis of the combined model and the design drilling trajectory of the well under development; creating a preliminary well bore stability model on the basis of the trajectory of the well under development and the synthetic curve; determining the design trajectory on the basis of the well bore stability model; obtaining parameters during the process of drilling the well under development which characterize the inclinometry, the (well geophysical survey) data and drilling parameters; updating the combined model and monitoring the drilling process of the well under development.

## Claims

### Claim 1

A method of combined support for a well drilling process, comprising the steps of:
receiving input data of the well which is being developed, including at least inclinometry data, well logging data and core data;
obtaining logging data of at least one reference well;
forming, on a basis of the mentioned input data and the logging data of at least one reference well, a combined model displaying rock characteristics and predicting a position of the well which is being developed;
determining at least one planned trajectory of a direction of drilling the well which is being developed; the trajectory being based on the logging data of at least one reference well;
calculating at least one synthetic logging curve based on the aforementioned combined model and at least one planned trajectory of the well which is being developed;
performing a construction of a preliminary model of a stability of a wellbore, based on at least one trajectory of the well which is being developed and calculated at least one synthetic curve;
determining, based on the preliminary model of the wellbore stability, an updated planned trajectory that ensures maximum of a well penetration within a target interval and the wellbore stability;
receiving parameters during a drilling of the well which is being developed; the parameters related to the inclinometry, logging data and the drilling;
updating the mentioned combined model and controlling a process of the well drilling based on the updated combined model.

### Claim 2 (depends on 1)

The method according to claim 1, wherein during the process of the well drilling, the stability of the wellbore is recalculated based on the obtained drilling parameters.

### Claim 3 (depends on 2)

The method according to claim 2, wherein the method additionally uses information about a presence of cracks in a reservoir.

### Claim 4 (depends on 1)

The method according to claim 1, wherein when updating the combined model, a position of the developed well within a target formation is checked.

### Claim 5 (depends on 1)

The method according to claim 1, wherein a selection of the reference well is carried out due to a cross-hole correlation and structural maps on a roof of a target formation.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the preliminary model of the wellbore stability is based on parameters of a reservoir pressure, a hydraulic fracturing gradient, mechanical properties of a rock and stresses.

### Claim 7 (depends on 1, 2, 3, 4, 5, 6)

A system for combined tracking of a well drilling process, comprising: at least one processor and at least one memory means storing machine-readable instructions that, when executed by the processor, implement the method according to any one of claims 1-6.
