# US 2021/0332680 A1 · Composite nitrogen huff and puff method for bounded fault block reservoir

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0332680 A1
- Document ID: US20210332680A1
- Status: Published application
- Kind: A1
- Application number: 16/472,827
- Filed: 2019-01-15
- Published: 2021-10-28
- Earliest claimed: 2018-05-25
- Assignees: China University of Petroleum
- Applicants: China University of Petroleum
- Inventors: Teng LU; Zhaomin LI; Jian LI; Dingyong ZHANG; Dawei HOU; Binfei LI
- Web page: https://patentgrep.com/patent/US20210332680A1

## CPC

- E21B 43/168: {Injecting a gaseous medium}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A composite nitrogen huff and puff method for a bounded fault block reservoir comprises: selecting the reservoir to be developed, wherein the reservoir to which the development method is applicable is roughly screened according to the following conditions: the reservoir is a bounded fault block reservoir, buried depth<5000 m, residual oil saturation>0.5, reservoir thickness>10 m, horizontal permeability>100 mD, vertical permeability to horizontal permeability ratio>0.35, reservoir porosity>0.20, and stratigraphic dip>8°; and sequentially performing the following huff and puff phases: a nitrogen huff and puff phase, a nitrogen and water composite huff and puff phase, a nitrogen and foaming agent composite huff and puff phase, and a nitrogen and carbon dioxide composite huff and puff phase.

## Claims

### Claim 1

A composite nitrogen huff and puff method for a bounded fault block reservoir, characterized in that the method comprises:
selecting the reservoir to be developed, wherein the reservoir to which the development method is applicable is roughly screened according to the following conditions: the reservoir is a bounded fault block reservoir, buried depth<5000 m, residual oil saturation>0.5, reservoir thickness>10 m, horizontal permeability>100 mD, vertical permeability to horizontal permeability ratio>0.35, reservoir porosity>0.20, and stratigraphic dip>8°; and
sequentially performing the following huff and puff phases: a nitrogen huff and puff phase, a nitrogen and water composite huff and puff phase, a nitrogen and foaming agent composite huff and puff phase, and a nitrogen and carbon dioxide composite huff and puff phase.

### Claim 2 (depends on 1)

The composite nitrogen huff and puff method for the bounded fault block reservoir according to claim 1, characterized in that the nitrogen huff and puff phase comprises the following steps: drilling a horizontal well or a vertical well in the bounded fault block reservoir; injecting nitrogen into the well, wherein the nitrogen injection amount is 50000-300000 m3; after nitrogen is injected, closing the well for soaking, wherein soaking time is 10-30 days; and after soaking, opening the well for production, wherein production is finished when the oil production speed is lower than 0.1-0.5 tons/day; and
the nitrogen huff and puff phase is repeated till: when the oil production (ton) and nitrogen injection (104 m3) in a certain cycle are less than 5, that is, when the oil production by injecting 104 m3 nitrogen in this cycle is less than 5 tons, the nitrogen and water composite huff and puff phase is adopted in the next cycle.

### Claim 3 (depends on 1)

The composite nitrogen huff and puff method for the bounded fault block reservoir according to claim 1, characterized in that the nitrogen and water composite huff and puff phase comprises an injection phase, a soaking phase and a stopping phase;
the injection method in the injection phase is as follows:
for medium and high permeability reservoirs with permeability greater than or equal to 100 mD, nitrogen is injected first with an injection amount of 50000-300000 m3; and then water is injected with an injection volume of 100-500 m3; and
for low permeability reservoirs with permeability less than 100 mD, a nitrogen slug and a water slug are injected alternately, and the nitrogen slug is injected first with the injection amount depending on the pressure limitation of the nitrogen injection equipment; when the nitrogen injection pressure reaches the upper limit of the injection pressure of the nitrogen injection equipment, nitrogen injection is stopped and water slug injection is started, and the injection volume of the water slug is 30-50 m3; after injecting the water slug, the nitrogen slug is injected again till the nitrogen injection pressure reaches the upper limit of the injection pressure of the nitrogen injection equipment, and then the water slug is injected again; and the nitrogen slug and the water slug are injected alternately till the total nitrogen injection reaches 50000-300000 m3;
after injection, soaking production starts and lasts for 5-10 days; and
after soaking, stopping starts, and crude oil is replaced till: when the oil production (ton) and nitrogen injection (104 m3) in a certain cycle are less than 5, that is, when the oil production by injecting 104 m3 nitrogen in this cycle is less than 5 tons, the nitrogen and foaming agent composite huff and puff phase is adopted in the next cycle.

### Claim 4 (depends on 1)

The composite nitrogen huff and puff method for the bounded fault block reservoir according to claim 1, characterized in that the nitrogen and foaming agent composite huff and puff phase comprises an injection phase, a soaking phase and a stopping phase;
for medium and high permeability reservoirs with permeability greater than or equal to 100 mD, nitrogen is injected first with an injection amount of 50000-300000 m3; and then a foaming agent solution is injected with an injection volume of 100-500 m3, the foaming agent is anion surfactant, and the concentration of the foaming agent is 0.3-0.5 wt %; and
for low permeability reservoirs with permeability less than 100 mD, a nitrogen slug and a foaming agent solution slug are alternately injected, and the nitrogen slug is injected first with the injection amount depending on the pressure limitation of the nitrogen injection equipment; when the nitrogen injection pressure reaches the upper limit of the injection pressure of the nitrogen injection equipment, nitrogen injection is stopped and foaming agent solution slug injection is started, and the injection volume of the foaming agent solution slug is 30-50 m3; after injecting the foaming agent solution slug, the nitrogen slug is injected again till the nitrogen injection pressure reaches the upper limit of the injection pressure of the nitrogen injection equipment, and then the foaming agent solution slug is injected again; and the nitrogen slug and the foaming agent solution slug are injected alternately till the total nitrogen injection reaches 50000-300000 m3;
after injection, soaking production starts and lasts for 5-10 days; and
after soaking, stopping starts till: when the oil production (ton) and nitrogen injection (104 m3) in a certain cycle are less than 5, that is, when the oil production by injecting 104 m3 nitrogen in this cycle is less than 5 tons, the nitrogen and carbon dioxide composite huff and puff phase is adopted in the next cycle.

### Claim 5 (depends on 1)

The composite nitrogen huff and puff method for the bounded fault block reservoir according to claim 1, characterized in that the nitrogen and carbon dioxide composite huff and puff phase comprises an injection phase, a soaking phase and a stopping phase;
carbon dioxide is injected first with an injection amount of 10-50 tons, and then nitrogen is injected with an injection volume of 50000-300000 m3;
after injection, soaking starts and lasts for 30-90 days; and
after soaking, stopping starts.
