# US 2021/0324598 A1 · Post-Tension Tube Foundation and Method of Assembling Same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0324598 A1
- Document ID: US20210324598A1
- Status: Published application
- Kind: A1
- Application number: 17/363,348
- Filed: 2021-06-30
- Published: 2021-10-21
- Earliest claimed: 2018-04-19
- Assignees: RRC Power & Energy, LLC
- Applicants: RRC Power & Energy, LLC
- Inventors: Hongbin Huo; Bill Bong
- Web page: https://patentgrep.com/patent/US20210324598A1

## CPC

- E02D 27/42: Foundations for poles, masts or chimneys {(sockets or holders for poles or masts per se E04H12/22)}
- E02D 5/58: Prestressed concrete piles {(segmental piles E02D5/523)}
- E02D 7/00: Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; {accessories for coupling driver to piles or the like E02D13/10; for trees or other plants A01G17/16; placing posts E04H17/26})
- E02D 27/12: Pile foundations
- E02D 2200/12: corrugated
- E02D 2250/0023: Cast, i.e. in situ or in a mold or other formwork
- E02D 2250/0046: using prestressing techniques
- E02D 2300/002: Concrete
- E02D 2300/0026: Metals
- F03D 13/20: Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D 13/22: {Foundations specially adapted for wind motors}
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/728: Onshore wind turbines
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- F03D: WIND MOTORS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A post-tensioned tube foundation for supporting a structure subject to high upset forces is described herein. The post-tensioned tube foundation includes an outer CMP, an inner CMP, and a tubular concrete base positioned between the inner CMP and the outer CMP. The outer CMP includes an inner surface that defines a cavity extending between a first open end and an opposite second open end. The outer CMP is positioned within an excavated hole defined along a ground surface. The inner CMP is positioned within the cavity of the outer CMP such that an annular space is defined between the inner CMP and the outer CMP. The tubular concrete base is positioned within the annular space defined between the inner CMP and the outer CMP. A plurality of bracing beams extend radially outwardly from the tubular concrete base.

## Claims

### Claim 1

A foundation for supporting a structure subject to high upset forces, comprising:
a base having a first end and a second end and being positioned within an excavated hole defined along a ground surface, the second end of the base positioned adjacent to a bottom surface of the excavated hole, the first end of the base positioned adjacent to the ground surface, a portion of the base formed by concrete; and,
a plurality of bracing beams extending radially outwardly from a top end of the base, wherein each of the plurality of bracing beams includes a support arm and an anchoring member, wherein the support arm and the anchoring member of the plurality of bracing beams are formed from concrete and unitarily formed with the portion of the base formed from concrete, the support arm being connected to the base and the anchoring member extending downward from an outer end of the supporting arm, wherein at least a portion of the anchoring member is positioned below the ground surface.

### Claim 2 (depends on 1)

The foundation of claim 1, wherein each bracing beam of the plurality of bracing beams is spaced an angular distance from an adjacent bracing beam.

### Claim 3 (depends on 2)

The foundation of claim 2, wherein each bracing beam is spaced the same angular distance from each adjacent bracing beam.

### Claim 4 (depends on 1)

The foundation of claim 1, wherein the plurality of bracing beams includes at least one pair of opposing bracing beams extending radially outwardly from the tubular concrete base in opposite directions.

### Claim 5 (depends on 4)

The foundation of the claim 4, wherein the plurality of bracing beams includes a first pair of opposing bracing beams and a second pair of opposing bracing beams.

### Claim 6 (depends on 5)

The foundation of claim 5, wherein the second pair of opposing bracing beams is orientated perpendicular to the first pair of opposing bracing beams.

### Claim 9 (depends on 1)

The foundation of claim 1, wherein each bracing beam extends radially outwardly from a top portion of the base.

### Claim 10 (depends on 1)

The post-tensioned tube foundation of claim 1, wherein at least a portion of the anchoring member is positioned below the ground surface.

### Claim 11 (depends on 1)

The post-tensioned tube foundation of claim 1, wherein a bottom surface of the support arm is adjacent the ground surface.

### Claim 12 (depends on 1)

The post-tensioned tube foundation of claim 1, wherein each bracing beam is formed of high strength reinforced concrete.

### Claim 13 (depends on 1)

The foundation of claim 1, wherein the base includes:
an outer corrugated metal pipe (CMP) including an inner surface defining a cavity extending between a first open end and an opposite second open end, the outer CMP positioned within the excavated hole, the second open end of the outer CMP positioned adjacent to a bottom surface of the excavated hole, the first open end of the outer CMP positioned adjacent to the ground surface, and
an inner CMP including an outer surface extending between a top end and a bottom end, the inner CMP positioned within the cavity of the outer CMP such that an annular space is defined between the inner CMP and the outer CMP, and
a tubular concrete base positioned within the annular space defined between the inner CMP and the outer CMP.

### Claim 14

A foundation for supporting a structure subject to high upset forces, comprising:
a base having a first end and a second end and being positioned within an excavated hole defined along a ground surface, the second end of the base positioned adjacent to a bottom surface of the excavated hole, the first end of the base positioned adjacent to the ground surface, a portion of the base formed by concrete; and,
a plurality of bracing beams extending radially outwardly from a top end of the base, wherein at least one of each of the plurality of bracing beams includes a support arm and an anchoring member, wherein the anchoring member includes a minimum thickness that is greater than a maximum thickness of the support arm.

### Claim 15 (depends on 14)

The foundation of claim 14, wherein each bracing beam of the plurality of bracing beams is spaced an angular distance from an adjacent bracing beam.

### Claim 16 (depends on 15)

The foundation of claim 15, wherein each bracing beam is spaced the same angular distance from each adjacent bracing beam.

### Claim 17 (depends on 14)

The foundation of claim 14, wherein the plurality of bracing beams includes at least one pair of opposing bracing beams extending radially outwardly from the tubular concrete base in opposite directions.

### Claim 18 (depends on 17)

The foundation of the claim 17, wherein the plurality of bracing beams includes a first pair of opposing bracing beams and a second pair of opposing bracing beams.

### Claim 19 (depends on 18)

The foundation of claim 18, wherein the second pair of opposing bracing beams is orientated perpendicular to the first pair of opposing bracing beams.

### Claim 20 (depends on 14)

The foundation of claim 14, wherein each bracing beam extends radially outwardly from a top portion of the base.

### Claim 21 (depends on 14)

The post-tensioned tube foundation of claim 14, wherein at least a portion of the anchoring member is positioned below the ground surface.

### Claim 22 (depends on 14)

The post-tensioned tube foundation of claim 14, wherein a bottom surface of the support arm is adjacent the ground surface.

### Claim 23 (depends on 14)

The post-tensioned tube foundation of claim 14, wherein each bracing beam is formed of high strength reinforced concrete.

### Claim 24 (depends on 14)

The foundation of claim 14, wherein the base includes:
an outer corrugated metal pipe (CMP) including an inner surface defining a cavity extending between a first open end and an opposite second open end, the outer CMP positioned within the excavated hole, the second open end of the outer CMP positioned adjacent to a bottom surface of the excavated hole, the first open end of the outer CMP positioned adjacent to the ground surface, and
an inner CMP including an outer surface extending between a top end and a bottom end, the inner CMP positioned within the cavity of the outer CMP such that an annular space is defined between the inner CMP and the outer CMP, and
a tubular concrete base positioned within the annular space defined between the inner CMP and the outer CMP.