# US 2021/0304036 A1 · Systems and methods for modeling a manufacturing assembly line

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0304036 A1
- Document ID: US20210304036A1
- Status: Published application
- Kind: A1
- Application number: 17/216,290
- Filed: 2021-03-29
- Published: 2021-09-30
- Earliest claimed: 2020-03-31
- Assignees: ATS Automation Tooling Systems Inc.
- Applicants: ATS Automation Tooling Systems Inc.
- Inventors: Nicholas Willison; Mehdi Sadeghzadeh; Masoud Kheradmandi; Bo Yuan Chang; Stephen Bacso; Yang Wang; Nick Foisy; Stanley Kleinikkink
- Web page: https://patentgrep.com/patent/US20210304036A1

## CPC

- G05B 19/4184: {characterised by fault tolerance, reliability of production system}
- G06N 5/04: Inference or reasoning models
- G01M 99/005: {Testing of complete machines, e.g. washing-machines or mobile phones (testing of machine parts G01M13/00; testing of electric apparatus or components G01R31/50)}
- G05B 19/41805: {characterised by assembly}
- G05B 19/4183: {characterised by data acquisition, e.g. workpiece identification}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G05B 23/0267: {Fault communication, e.g. human machine interface [HMI]}
- G06N 5/01: Dynamic search techniques; Heuristics; Dynamic trees; Branch-and-bound
- G06N 20/00: Machine learning
- G05B 2219/2629: Assembly line
- G05B 2219/31438: Priority, queue of alarms
- G05B 2219/32194: Quality prediction
- G05B 2219/32371: Predict failure time by analysing history fault logs of same machines in databases
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

Various systems and methods for modeling a manufacturing assembly line are disclosed herein. Some embodiments relate to operating a processor to receive cell data and line production data, determine one or more production associations between the cell data and the line production data; evaluate the one or more production associations to identify one or more critical production associations; retrieve the cell data and the line production data associated with the one or more critical production associations; and train a predictive model with the retrieved cell data and the retrieved line production data to predict the production level of the manufacturing assembly line.

## Claims

### Claim 1

A method for generating a predictive model for predicting a production level of a manufacturing assembly line comprising a plurality of cells, each cell being configured to successively process a workpiece along the manufacturing assembly line, the method comprising operating a processor to:
receive cell data associated with at least one cell during an operation of an active manufacturing assembly line, the cell data comprising, for each cell, at least one input state of that cell and a cell position of that cell within the active manufacturing assembly line;
receive line production data associated with the cell data, the line production data being representative of a production level of the active manufacturing assembly line in association with the respective cell data;
determine one or more production associations between the cell data of each cell and the production level of the active manufacturing assembly line;
evaluate the one or more production associations to identify one or more critical production associations to the operation of the active manufacturing assembly line;
retrieve the cell data and the line production data associated with the one or more critical production associations; and
train the predictive model with the retrieved cell data and the retrieved line production data to predict the production level of the manufacturing assembly line.

### Claim 2 (depends on 1)

The method of claim 1, wherein the line production data is representative of a defect level of the active manufacturing assembly line, the one or more production associations comprise one or more associations between the cell data of each cell and the defect level of the active manufacturing assembly line, and the predictive model is trained to predict the defect level of the manufacturing assembly line.

### Claim 3 (depends on 1)

The method of claim 1, wherein the one or more production associations comprises a cell input association between an input state of a cell and the production level of the active manufacturing assembly line, and a cell position association between a cell position of a cell and the production level of the active manufacturing assembly line.

### Claim 4 (depends on 1)

The method of claim 1, wherein evaluating the one or more production associations comprises identifying one or more one statistically significant production associations as the one or more critical production associations.

### Claim 5 (depends on 4)

The method of claim 4, wherein identifying the one or more statistically significant production associations comprises:
determining a probability value of each production association in the plurality of production associations being unassociated; and
identifying a production association as the one of the one or more statistically significant associations if the probability value of that production association is less than or equal to a predetermined significance level.

### Claim 6 (depends on 1)

The method of claim 1, wherein:
the cell data comprises a cell position of a first cell relative to a second cell in the active manufacturing assembly line; and
the plurality of production associations comprises a cell position association between the cell position of the first cell relative to the second cell and the production level of the active manufacturing assembly line.

### Claim 7 (depends on 6)

The method of claim 6, wherein the first cell is downstream of the second cell in the active manufacturing assembly line.

### Claim 8 (depends on 6)

The method of claim 6, wherein the first cell is upstream of the second cell in the active manufacturing assembly line.

### Claim 9 (depends on 1)

The method of claim 1, wherein:
at least some of the cell data corresponds to a first time;
at least some of the line production data corresponds to a second time later than the first time; and
the one or more production associations comprises a production association between cell data corresponding to the first time and a production level corresponding to the second time.

### Claim 10 (depends on 9)

The method of claim 9, wherein evaluating the one or more production associations comprises:
identifying the production association between the cell data corresponding to the first time and the production level corresponding to the second time as one of the one or more critical production associations if a difference between the first time and the second time is less than a pre-determined time limit.

### Claim 11 (depends on 1)

The method of claim 1, wherein the at least one input state comprises a starved state in which the corresponding cell received an undersupply of at least one input for processing the workpiece.

### Claim 12 (depends on 1)

The method of claim 1, wherein:
the predictive model comprises a decision tree, the decision tree comprising a plurality of nodes; and
training the predictive model comprises generating at least one node corresponding to the one or more critical production associations.

### Claim 13 (depends on 1)

The method of claim 1, wherein:
each cell comprises at least one device configured to process the workpiece;
the method further comprises operating the processor to receive device data associated with at least one device during the operation of the active manufacturing assembly line, the device data comprising, for each device, at least one device state; and
the plurality of production associations comprises an association between a device state and the production level of the active manufacturing assembly line.

### Claim 14

A system for generating a predictive model for predicting a production level of a manufacturing assembly line comprising a plurality of cells, each cell being configured to successively process a workpiece along the manufacturing assembly line, the system comprising a processor configured to:
receive cell data associated with at least one cell during an operation of an active manufacturing assembly line, the cell data comprising, for each cell, at least one input state of that cell and a cell position of that cell within the active manufacturing assembly line;
receive line production data associated with the cell data, the line production data being representative of a production level of the active manufacturing assembly line in association with the respective cell data;
determine one or more production associations between the cell data of each cell and the production level of the active manufacturing assembly line;
evaluate the one or more production associations to identify one or more critical production associations to the operation of the active manufacturing assembly line;
retrieve the cell data and the line production data associated with the one or more critical production associations; and
train the predictive model with the retrieved cell data and the retrieved line production data to predict the production level of the manufacturing assembly line.

### Claim 15 (depends on 14)

The system of claim 14, wherein the line production data is representative of a defect level of the active manufacturing assembly line, the one or more production associations comprise one or more associations between the cell data of each cell and the defect level of the active manufacturing assembly line, and the predictive model is trained to predict the defect level of the manufacturing assembly line.

### Claim 16 (depends on 14)

The system of claim 14, wherein the one or more production associations comprises a cell input association between an input state of a cell and the production level of the active manufacturing assembly line, and a cell position association between a cell position of a cell and the production level of the active manufacturing assembly line.

### Claim 17 (depends on 14)

The system of claim 14, wherein the processor is configured to identify one or more statistically significant production associations as the one or more critical production associations.

### Claim 18 (depends on 17)

The system of claim 17, wherein the processor is further configured to:
determine a probability value of each production association in the plurality of production associations being unassociated; and
identify a production association as the one of the one or more statistically significant associations if the probability value of that production association is less than or equal to a predetermined significance level.

### Claim 19 (depends on 14)

The system of claim 14, wherein:
the cell data comprises a cell position of a first cell relative to a second cell in the active manufacturing assembly line; and
the plurality of production associations comprises a cell position association between the cell position of the first cell relative to the second cell and the production level of the active manufacturing assembly line.

### Claim 20 (depends on 19)

The system of claim 19, wherein the first cell is downstream of the second cell in the active manufacturing assembly line.

### Claim 21 (depends on 19)

The system of claim 19, wherein the first cell is upstream of the second cell in the active manufacturing assembly line.

### Claim 22 (depends on 14)

The system of claim 14, wherein:
at least some of the cell data corresponds to a first time;
at least some of the line production data corresponds to a second time later than the first time; and
the one or more production associations comprises a production association between cell data corresponding to the first time and a production level corresponding to the second time.

### Claim 23 (depends on 22)

The system of claim 22, wherein the processor is configured to:
identify the production association between the cell data corresponding to the first time and the production level corresponding to the second time as one of the one or more critical production associations if a difference between the first time and the second time is less than a pre-determined time limit.

### Claim 24 (depends on 14)

The system of claim 14, wherein the at least one input state comprises a starved state in which the corresponding cell received an undersupply of at least one input for processing the workpiece.

### Claim 25 (depends on 14)

The system of claim 14, wherein:
the predictive model comprises a decision tree, the decision tree comprising a plurality of nodes; and
the processor is configured to generate at least one node corresponding to the one or more critical production associations.

### Claim 26 (depends on 14)

The system of claim 14, wherein:
each cell comprises at least one device configured to process the workpiece;
the processor is further configured to receive device data associated with at least one device during the operation of the active manufacturing assembly line, the device data comprising, for each device, at least one device state; and
the plurality of production associations comprises an association between a device state and the production level of the active manufacturing assembly line.
