# US 2021/0288880 A1 · Prescriptive Analytics Based Data Warehouse Cluster Node Optimization Stack for Cloud Computing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0288880 A1
- Document ID: US20210288880A1
- Status: Published application
- Kind: A1
- Application number: 16/818,333
- Filed: 2020-03-13
- Published: 2021-09-16
- Earliest claimed: 2020-03-13
- Assignees: Accenture Global Solutions Limited
- Applicants: Accenture Global Solutions Limited
- Inventors: Madhan Kumar Srinivasan; Kishore Kumar Gajula; Samba Sivachari Rage
- Web page: https://patentgrep.com/patent/US20210288880A1

## CPC

- H04L 41/147: for predicting network behaviour
- G06N 3/04: Architecture, e.g. interconnection topology
- G06N 3/0499: Feedforward networks
- G06N 3/09: Supervised learning
- H04L 41/0823: characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability (for optimising operational conditions of wireless networks H04W24/02)
- H04L 41/16: using machine learning or artificial intelligence
- G06N 3/08: Learning methods
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A multi-layer cluster node optimization (CNO) stack may generate a token containing cluster node optimization prescriptions for detaching nodes from a storage cluster. A prescriptive engine layer of the CNO stack may select target computing resource nodes from a selected cluster based on the utilization tracking data, the optimization metric thresholds, and the CNO interval; utilize a prediction engine to predict respective storage utilizations over a next operation cycle for the nodes of the selected cluster; generate an aggregated storage utilization prediction for the selected cluster based on the predicted storage utilizations; determine a network traffic coefficient for the selected cluster based on the network traffic data; perform a cluster determination whether to execute a cluster node optimization for the selected cluster based on the aggregated storage utilization prediction and the network traffic coefficient; and generate a CNO token based on the cluster determination.

## Claims

### Claim 1

A system comprising:
network interface circuitry configured to:
receive utilization tracking data for a selected computing resource cluster of computing resource nodes;
receive network traffic data for the selected computing resource cluster; and
send a cluster node optimization (CNO) token to a host interface, the host interface configured to control cluster node optimization for at least the selected computing resource cluster;
optimization circuitry in data communication with the network interface circuitry, the optimization circuitry configured to execute a cluster node optimization (CNO) stack, the CNO stack executable to:
at an input layer of the CNO stack:
obtain, via the network interface circuitry, the utilization tracking data and the network traffic data; and
store the utilization tracking data and the network traffic data via a storage operation at a data-staging layer of the CNO stack;
at a configuration layer of the CNO stack:
determine a CNO interval; and
determine optimization metric thresholds;
at a prescriptive engine layer of the CNO stack:
select target computing resource nodes from the selected computing resource cluster based on the utilization tracking data; the optimization metric thresholds, and the CNO interval;
execute a prediction engine to predict respective storage utilizations over a next operation cycle for the target computing resource nodes;
generate an aggregated storage utilization prediction for the selected computing resource cluster based on the predicted storage utilizations;
determine a network traffic coefficient for the selected computing resource cluster based on the network traffic data;
perform a cluster determination to execute a cluster node optimization for the selected computing resource cluster based on the aggregated storage utilization prediction and the network traffic coefficient; and
generate the CNO token based on the cluster determination.

### Claim 2 (depends on 1)

The system of claim 1, where:
the CNO stack is further executable to, at a presentation layer of the CNO stack, generate a CNO control interface including a CNO-window presentation; and
the CNO-window presentation includes a selectable option to execute a cluster node optimization.

### Claim 3 (depends on 2)

The system of claim 2, where the CNO-window presentation further includes a selectable option to reject execution of the cluster node optimization.

### Claim 4 (depends on 2)

The system of claim 2, where the CNO-window presentation is configured to display multiple cluster node optimizations each for a corresponding computing resource cluster.

### Claim 5 (depends on 2)

The system of claim 2, where the CNO-window presentation further includes a CNO interval selection control configured to receive a selection of the CNO interval from an entry in the CNO window presentation by an operator.

### Claim 6 (depends on 1)

The system of claim 1, where the optimization circuitry is further configured to pre-process the utilization tracking data and the network traffic data by data transformation comprising z transformation or log transformation and data treatment on outlier data, anomaly data, or missing value data.

### Claim 7 (depends on 1)

The system of claim 1, where the utilization tracking data includes processor utilization tracking data and storage utilization tracking data, and the optimization circuitry is configured to select the target computing resource nodes from the selected computing resource cluster by:
calculating processor utilization of a computing resource node in the selected computing resource cluster for the CNO interval based on the processor utilization tracking data;
calculating storage utilization of the computing resource node for the CNO interval based on the storage utilization tracking data; and
identifying the computing resource node as one of the target computing resource nodes by comparing the processor utilization to a processor utilization threshold and comparing the storage utilization to a storage utilization threshold.

### Claim 8 (depends on 1)

The system of claim 1, where the optimization circuitry is configured to select the target computing resource nodes from the selected computing resource cluster by:
calculating network receiving throughput and network transmitting throughput of a computing resource node in the selected computing resource cluster for the CNO interval based on the network traffic data; and
identifying the computing resource node as one of the target computing resource nodes by comparing the network receiving throughput and the network transmitting throughput to a throughput threshold.

### Claim 9 (depends on 1)

The system of claim 1, where the optimization circuitry is further configured to:
obtain, at the input layer, storage access data for the selected computing resource cluster; and
select the target computing resource nodes from the selected computing resource cluster by:
calculating a write latency and a read latency of a computing resource node in the selected computing resource cluster for the CNO interval based on the storage access data; and
identifying the computing resource node to be one of the target computing resource nodes by comparing the write latency and the read latency to a latency threshold.

### Claim 10 (depends on 1)

The system of claim 1, where the optimization circuitry is configured to generate the aggregated storage utilization prediction for the selected computing resource cluster based on the predicted storage utilizations by:
determining a buffer percentage of a storage buffer based on a storage usage ratio of the selected computing resource cluster; and
summing the predicted storage utilizations with the buffer percentage to generate the aggregated storage utilization prediction.

### Claim 11 (depends on 1)

The system of claim 1, where the prediction engine includes a feed forward neural network model trained to predict storage utilization of target computing resource nodes.

### Claim 12 (depends on 1)

The system of claim 1, where the optimization circuitry is configured to perform the cluster determination by comparison of the network traffic coefficient to a traffic threshold.

### Claim 13 (depends on 1)

The system of claim 1, where the optimization circuitry is configured to perform the cluster determination by calculating a number of computing resource nodes removable from the selected computing resource cluster based on the aggregated storage utilization prediction.

### Claim 14 (depends on 13)

The system of claim 13, where the optimization circuitry is further configured to select the number of computing resource nodes removable from the selected computing resource cluster based on performance data of the target computing resource nodes in the selected computing resource cluster.

### Claim 15 (depends on 13)

The system of claim 13, where the optimization circuitry is further configured to generate a consumption optimization preview for the selected computing resource cluster based on the number of computing resource nodes removable from the selected computing resource cluster and consumption metrics data for the selected computing resource cluster.

### Claim 16 (depends on 15)

The system of claim 15, where the optimization circuitry is further configured to determine a priority to execute the cluster node optimization for the selected computing resource cluster based on the consumption optimization preview.

### Claim 17 (depends on 1)

The system of claim 1, where the optimization circuitry is further configured to:
select the selected computing resource cluster from a plurality of computing resource clusters by:
obtaining a utilization time length for a computing resource cluster;
obtaining a utilization data missing coefficient for the computing resource cluster; and
determining the computing resource cluster as the selected computing resource cluster by comparison of the utilization time length to a utilization time length threshold and comparison of the utilization data missing coefficient to a data missing tolerance threshold.

### Claim 18 (depends on 17)

The system of claim 17, where the utilization time length threshold is a predetermined number of days and the data missing tolerance threshold is a predetermined percentage of days for which utilization tracking data is missing.

### Claim 19

A method comprising:
at network interface circuitry:
receiving utilization tracking data for a selected computing resource cluster of computing resource nodes; and
receiving network traffic data for the selected computing resource cluster;
at optimization circuitry in data communication with the network interface circuitry, the optimization circuitry executing a cluster node optimization (CNO) stack by:
obtaining, at an input layer of the CNO stack, the utilization tracking data and the network traffic data via the network interface circuitry;
storing, at the input layer, the utilization tracking data and the network traffic data via a storage operation at a data-staging layer of the CNO stack;
determining, at a configuration layer of the CNO stack, a CNO interval;
determining, at the configuration layer, optimization metric thresholds;
selecting, at a prescriptive engine layer of the CNO stack, target computing resource nodes from the selected computing resource cluster based on the utilization tracking data; the optimization metric thresholds, and the CNO interval;
predicting, at the prescriptive engine layer, with a prediction engine, respective storage utilizations over a next operation cycle for the target computing resource nodes;
generating, at the prescriptive engine layer, an aggregated storage utilization prediction for the selected computing resource cluster based on the predicted storage utilizations;
calculating, at the prescriptive engine layer; a network traffic coefficient for the selected computing resource cluster based on the network traffic data;
determining, at the prescriptive engine layer, to execute a cluster node optimization for the selected computing resource cluster based on the aggregated storage utilization prediction and the network traffic coefficient; and
generating, at the prescriptive engine layer, a CNO token based on the determination to execute the cluster node optimization; and
sending, via the network interface circuitry, the CNO token to a host interface configured to control cluster node optimization for at least the selected computing resource cluster.

### Claim 20

A product including:
machine-readable media other than a transitory signal; and
instructions stored on the machine-readable media, the instructions configured to, when executed, cause a machine to:
at network interface circuitry:
receive utilization tracking data for a selected computing resource cluster of computing resource nodes; and
receive network traffic data for the selected computing resource cluster;
at optimization circuitry in data communication with the network interface circuitry; the optimization circuitry executing a cluster node optimization (CNO) stack:
obtain, at an input layer of the CNO stack, the utilization tracking data and the network traffic data via the network interface circuitry;
store, at the input layer, the utilization tracking data and the network traffic data via a storage operation at a data-staging layer of the CNO stack;
determine, at a configuration layer of the CNO stack, a CNO interval;
determine, at the configuration layer, optimization metric thresholds;
select; at a prescriptive engine layer of the CNO stack, target computing resource nodes from the selected computing resource cluster based on the utilization tracking data, the optimization metric thresholds; and the CNO interval;
predict, at the prescriptive engine layer, with a prediction engine, respective storage utilizations over a next operation cycle for the target computing resource nodes;
generate, at the prescriptive engine layer, an aggregated storage utilization prediction for the selected computing resource cluster based on the predicted storage utilizations;
calculate, at the prescriptive engine layer, a network traffic coefficient for the selected computing resource cluster based on the network traffic data;
determine, at the prescriptive engine layer, to execute a cluster node optimization for the selected computing resource cluster based on the aggregated storage utilization prediction and the network traffic coefficient; and
generate, at the prescriptive engine layer, a CNO token based on the determination to execute the cluster node optimization; and
send, with network interface circuitry, the CNO token to a host interface configured to control cluster node optimization for at least the selected computing resource cluster.