# US 2021/0288495 A1 · Methods and systems for adjusting power consumption based on a dynamic power option agreement

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0288495 A1
- Document ID: US20210288495A1
- Status: Published application
- Kind: A1
- Application number: 17/328,337
- Filed: 2021-05-24
- Published: 2021-09-16
- Earliest claimed: 2019-10-28
- Assignees: Lancium LLC
- Applicants: Lancium LLC
- Inventors: Michael T. MCNAMARA; Raymond E. CLINE, JR.
- Web page: https://patentgrep.com/patent/US20210288495A1

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G06F 1/182: {with special features, e.g. for use in industrial environments; grounding or shielding against radio frequency interference [RFI] or electromagnetical interference [EMI]}
- G06F 1/20: Cooling means
- G06F 1/206: {comprising thermal management}
- G06F 1/3203: Power management, i.e. event-based initiation of a power-saving mode
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3212: Monitoring battery levels, e.g. power saving mode being initiated when battery voltage goes below a certain level
- G06F 1/3296: by lowering the supply or operating voltage
- G06F 9/5094: {where the allocation takes into account power or heat criteria (power management in computers in general G06F1/3203; thermal management in computers in general G06F1/206)}
- G06Q 50/06: Energy or water supply
- H02J 3/008: Circuit arrangements for power supply or distribution technologies responsive to energy trading
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 10/76: Power conversion electric or electronic aspects
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Examples relate to adjusting load power consumption based on a power option agreement. A computing system may receive power option data that is based on a power option agreement and specify minimum power thresholds associated with time intervals. The computing system may determine a performance strategy for a load (e.g., set of computing systems) based on a combination of the power option data and one or more monitored conditions. The performance strategy may specify a power consumption target for the load for each time interval such that each power consumption target is equal to or greater than the minimum power threshold associated with each time interval. The computing system may provide instructions the set of computing systems to perform one or more computational operations based on the performance strategy.

## Claims

### Claim 1

A system comprising:
a set of computing systems, wherein the set of computing systems is configured to perform computational operations using power from a power grid; and
a control system configured to:
monitor a set of conditions;
receive first power option data specifying a first minimum power usage threshold associated with a first time interval;
responsive to receiving the first power option data, provide first control instructions for the set of computing systems based on a combination of at least: (i) a first power consumption target for the set of computing systems for the first time interval, wherein the first power consumption target is equal to or greater than the first minimum power usage threshold associated with the first time interval, and (ii) at least one condition of the set of conditions, wherein the first control instructions comprises a directive to operate a computing system of the set of computing systems during the first time interval;
receive second power option data specifying a second minimum power usage threshold associated with a second time interval; and
responsive to receiving the second power option data, provide second control instructions for the set of computing systems based on a combination of at least: (i) a second power consumption target for the set of computing systems for the second time interval, wherein the second power consumption target is equal to or greater than the second minimum power usage threshold associated with the second time interval, and (ii) at least one condition of the set of conditions.

### Claim 2 (depends on 1)

The system of claim 1, wherein the second control instructions comprise a directive to stop operating the computing system of the set of computing systems during the second time interval.

### Claim 3 (depends on 1)

The system of claim 1, wherein the second control instructions comprise a directive to operate a second computing system of the set of computing systems during the second time interval.

### Claim 4 (depends on 1)

The system of claim 1, wherein the control system is configured to:
receive the second power option data subsequent to receiving the first power option data.

### Claim 5 (depends on 4)

The system of claim 4, wherein the second time interval is subsequent to the first interval.

### Claim 6 (depends on 1)

The system of claim 1 wherein the set of conditions comprises a price of power from the power grid.

### Claim 7 (depends on 1)

The system of claim 1, wherein the set of conditions comprises:
a price of power from the power grid; and
a plurality of parameters associated with one or more computational operations to be performed at the set of computing systems.

### Claim 8 (depends on 7)

The system of claim 7, wherein the control system is configured to determine the first control instructions for the set of computing systems based on a combination of at least the portion of the first power option data, the price of power from the power grid, and the plurality of parameters associated with the one or more computational operations.

### Claim 9 (depends on 8)

The system of claim 8, wherein the first control instructions specify an order for the set of computing systems to follow when performing the one or more computational operations, wherein the order is based on respective priorities associated with the one or more computational operations.

### Claim 10 (depends on 1)

The system of claim 1, wherein the first control instructions specify an assignment and/or transfer of computational operations among the set of computing systems.

### Claim 11 (depends on 1)

The system of claim 1, wherein the first power consumption target is greater than the first minimum power threshold when a cost of power from the power grid is below a threshold price during the first time interval.

### Claim 12 (depends on 1)

The system of claim 1, wherein the first power consumption target is equal to the first minimum power threshold when a cost of power from the power grid is above a threshold price during the first time interval.

### Claim 13 (depends on 1)

The system of claim 1, wherein the control system is a remote master control system positioned remotely from the set of computing systems.

### Claim 14 (depends on 1)

The system of claim 1, wherein the control system is further configured to:
provide a request to a qualified scheduling entity (QSE); and
receive the first power option data in response to providing the request to the QSE.

### Claim 15 (depends on 1)

The system of claim 1, wherein the set of conditions monitored by the control system further comprises:
a price of power from the power grid; and
a global mining hash rate and a price for a cryptocurrency; and
wherein the control system is further configured to:
determine the second control instructions for the set of computing systems based on a combination of the first power consumption target for the set of computing systems for the first time interval and at least one of: the price of power from the power grid, the global mining hash rate, and the price for the cryptocurrency,
wherein the second control instructions specify for at least a subset of the set of computing systems to perform mining operations for the cryptocurrency when the price of power from the power grid is equal to or less than a revenue obtained by performing the mining operations for the cryptocurrency.

### Claim 16 (depends on 1)

The system of claim 1, wherein the control system is further configured to: receive the second power option data during the first time interval.

### Claim 17

A method comprising:
monitoring, at a computing system, a set of conditions;
receiving first power option data specifying a first minimum power usage threshold associated with a first time interval;
responsive to receiving the first power option data, providing first control instructions for a set of computing systems based on a combination of at least: (i) a first power consumption target for the set of computing systems for the first time interval, wherein the first power consumption target is equal to or greater than the first minimum power usage threshold associated with the first time interval, and (ii) at least one condition of the set of conditions, wherein the first control instructions comprises a directive to operate a computing system of the set of computing systems during the first time interval;
receiving second power option data specifying a second minimum usage power threshold associated with a second time interval; and
responsive to receiving the second power option data, providing second control instructions for the set of computing systems based on a combination of at least (i) a second power consumption target for the set of computing systems for the second time interval, wherein the second power consumption target is equal to or greater than the second minimum power usage threshold associated with the second time interval, and (ii) at least one condition of the set of conditions.

### Claim 18 (depends on 17)

The method of claim 17, wherein the second control instructions comprise a directive to stop operating the computing system of the set of computing systems during the second time interval.

### Claim 19 (depends on 17)

The method of claim 17, wherein the second control instructions comprise a directive to operate a second computing system of the set of computing systems during the second time interval.

### Claim 20 (depends on 17)

The method of claim 17, wherein monitoring the set of conditions comprises monitoring a price of power from a power grid.

### Claim 21 (depends on 17)

The method of claim 17, wherein monitoring the set of conditions comprises monitoring: (i) a price of power from a power grid, and (ii) a plurality of parameters associated with one or more computational operations to be performed at the set of computing systems.

### Claim 22 (depends on 17)

The method of claim 17, wherein providing first control instructions for the set of computing systems based on the combination of at least the portion of the first power option data and at least one condition of the set of conditions comprises specifying one or more operating modes of the set of computing systems.

### Claim 23 (depends on 17)

The method of claim 17, wherein providing the first control instructions comprises specifying power on/off and/or standby states of the set of computing systems.

### Claim 24 (depends on 17)

The method of claim 17, wherein the directive of the first control instructions specifies an order for the set of computing systems to follow when performing the one or more computational operations, wherein the order is based on respective priorities associated with the one or more computational operations.

### Claim 25 (depends on 17)

The method of claim 17, wherein receiving the second power option data comprises:
receiving the second power option data during the first time interval; and
wherein providing second control instructions for the set of computing systems comprises providing the second control instructions for the set of computing systems prior to an end of the first time interval.

### Claim 26

A non-transitory computer readable medium having stored therein instructions executable by one or more processors to cause a computing system to perform functions comprising:
monitoring, at a computing system, a set of conditions;
receiving first power option data specifying a first minimum power usage threshold associated with a first time interval;
responsive to receiving the first power option data, providing first control instructions for a set of computing systems based on a combination of at least: (i) a first power consumption target for the set of computing systems for the first time interval, wherein the first power consumption target is equal to or greater than the first minimum power usage threshold associated with the first time interval, and (ii) at least one condition of the set of conditions, wherein the first control instructions comprises a directive to operate a computing system of the set of computing systems during the first time interval;
receiving second power option data specifying a second minimum usage power threshold associated with a second time interval; and
responsive to receiving the second power option data, providing second control instructions for the set of computing systems based on a combination of at least (i) a second power consumption target for the set of computing systems for the second time interval, wherein the second power consumption target is equal to or greater than the second minimum power usage threshold associated with the second time interval, and (ii) at least one condition of the set of conditions.
