# US 2021/0287309 A1 · Methods and systems for meeting rapidly fluctuating power demands using interruptible load and stable power production

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0287309 A1
- Document ID: US20210287309A1
- Status: Published application
- Kind: A1
- Application number: 16/816,125
- Filed: 2020-03-11
- Published: 2021-09-16
- Earliest claimed: 2020-03-11
- Assignees: KCK Bermuda, Ltd.
- Applicants: KCK Bermuda, Ltd.
- Inventors: Eric GEBHARDT; Scott HOYTE
- Web page: https://patentgrep.com/patent/US20210287309A1

## CPC

- G06Q 50/06: Energy or water supply
- G05B 13/027: {using neural networks only}
- G05B 13/041: {in which a variable is automatically adjusted to optimise the performance}
- G06Q 20/065: {using e-cash}
- G06Q 20/381: {Currency conversion}
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q 30/018: Certifying business or products
- G06Q 2220/00: Business processing using cryptography
- Y04S 50/12: Billing, invoicing, buying or selling transactions or other related activities, e.g. cost or usage evaluation
- Y04S 50/14: Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An automated control method for meeting rapidly fluctuating power demands with stable power production is disclosed. The method includes determining a market value of a unit of electricity sold on the grid, a fuel cost required to produce the unit of electricity, and a market value of a processing task requiring the unit of electricity. The method also includes calculating which of the electricity, processing, or fuel is most valuable; shutting off a running process when the value of the electricity is highest or the value of the fuel is highest; and starting a pending process when the net market value of the processing task is highest. The method may also include reducing electricity generation at a power plant when the value of electricity is negative, or exercising a futures contract to supply electricity.

## Claims

### Claim 1

A computer-implemented method for controlling power delivered to a grid, comprising:
determining a market value of a unit of electricity sold on the grid, a production cost of the unit of electricity, a fuel cost required to produce the unit of electricity, a cost to sell fuel, a market value of a processing task requiring the unit of electricity, and a cost of starting the processing;
calculating, as a net market value of the unit of electricity, a first difference between the market value of the unit of electricity and the production cost of the unit of electricity;
calculating, as a net market value of the processing task, a second difference between the market value of the processing task and a sum of the production cost of the unit of electricity and the cost of starting the processing;
calculating, as a net market value of the fuel, a third difference between the fuel cost and the cost to sell fuel;
calculating which of the net market value of the unit of electricity, the net market value of the processing task, and the net market value of fuel is highest;
shutting off a running process corresponding to the processing task when the net market value of the unit of electricity is highest or the net market value of the fuel is highest; and
starting a pending process corresponding to the processing task when the net market value of the processing task is highest.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
the processing task comprises cryptocurrency mining;
determining the market value of the processing task comprises:
determining a reward for completing a cryptocurrency mining task;
accessing a cryptocurrency exchange to determine an exchange rate of the reward to a currency;
determining an expected fraction of the reward by multiplying the reward and a probability of obtaining the reward;
converting the expected fraction of the reward to the currency based on the exchange rate;
estimating an energy cost associated with the processing task; and
setting the market value of the processing task to be the difference between the converted reward fraction and the estimated energy cost.

### Claim 3 (depends on 2)

The method of claim 2, wherein:
the market value of the unit of electricity comprises at least one of energy production charges, demand charges, and transmission and distribution charges; and
the energy cost associated with the processing task comprises energy production charges.

### Claim 4 (depends on 2)

The method of claim 2, wherein the probability of obtaining the reward comprises a likelihood that a block of a blockchain will be mined within a time interval, the likelihood being based on a distribution of past mining intervals, a target mining time, and an amount of time elapsed since a previous block was mined.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
determining a market value for each of a plurality of processing tasks; and
setting the pending process to be the processing task among the plurality of processing tasks having a highest market value; and
starting the pending process comprises:
starting hardware optimized to perform the pending process; and
shutting off hardware optimized to perform tasks other than the pending process.

### Claim 6 (depends on 1)

The method of claim 1, wherein:
shutting off the running process comprises shutting off a portion of all running processes; and
starting the pending process comprises starting a portion of total pending processes.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
reducing electricity generation at a power plant and selling fuel when the net market value of the fuel is highest.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
determining if the market value of the unit of electricity sold on the grid is lower than a total operating cost comprising the production cost of the unit of electricity, a startup cost to start power generation, and a shut down cost to stop power generation; determining a cost of purchasing electricity from an alternative electric power supplier; and
purchasing electricity from the different electricity supplier if the cost of purchasing electricity is less than the total operating cost.

### Claim 9 (depends on 8)

The method of claim 8, wherein electricity generation is maintained above a minimum emissions compliant limit.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
determining if curtailment policies require a reduction in an amount of electricity delivered to the grid; and
starting the pending process to consume electricity generated in excess of limits imposed by curtailment policies.

### Claim 11 (depends on 1)

The method of claim 1, further comprising:
monitoring electricity demand of consumers using the grid; and
shutting off the running process when a second sum of electricity demand and electricity use by the running process exceeds electricity supply.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
operating a power plant at a substantially constant production level; and
shutting off the running process or starting the pending process such that electricity delivered to the grid matches consumer electricity demand.

### Claim 13 (depends on 1)

The method of claim 1, wherein:
the processing task comprises a computational model or neural network training operation configured to operate intermittently at least by saving progress while the processing task is operating.

### Claim 14 (depends on 1)

The method of claim 1, wherein:
the processing task comprises storing energy in at least one of a battery storage bank or a pumped storage facility.

### Claim 15 (depends on 1)

The method of claim 1, wherein a product of the processing task is a commodity sold on an exchange, such that a purchaser is identified after the product is created and the purchaser may acquire the commodity from any of a plurality of suppliers.

### Claim 16

A computer-implemented method for controlling power delivered to a grid, comprising:
categorizing electricity consumers as discretionary or mandatory;
determining a mandatory electricity demand as a total demand of consumers categorized as mandatory;
calculating a reserve supply capacity as a product of a safety margin and the mandatory electricity demand;
determining a current electricity supply of the grid;
determining a current electricity demand of the grid;
starting cryptocurrency mining hardware when the current electricity supply exceeds the sum of the current electricity demand and the reserve supply capacity; and
shutting down cryptocurrency mining hardware when the current electricity supply is less than the sum of the current electricity demand and the reserve supply capacity.

### Claim 17 (depends on 16)

The method of claim 16, wherein:
the processing task comprises cryptocurrency mining;
determining the market value of the processing task comprises:
determining a reward for completing a cryptocurrency mining task;
accessing a cryptocurrency exchange to determine an exchange rate of the reward to a currency;
determining an expected fraction of the reward by multiplying the reward and a probability of obtaining the reward;
converting the expected fraction of the reward to the currency based on the exchange rate;
estimating an energy cost associated with the processing task; and
setting the market value of the processing task to be the difference between the converted reward fraction and the estimated energy cost.

### Claim 18

A computer-implemented method for controlling power delivered to a grid, comprising:
determining a market value of a unit of electricity sold on the grid, a purchase value of a futures contract for electricity, a market value of a processing task requiring the unit of electricity, and a cost of starting the processing;
calculating, as a net market value of the unit of electricity, a first difference between the market value of the unit of electricity and a proportion of the futures contract corresponding to the unit of electricity;
calculating, as a net market value of the processing task, a second difference between the market value of the processing task and the proportion of the futures contract corresponding to the unit of electricity;
calculating which of the net market value of the unit of electricity and the net market value of the processing task is highest;
shutting off a running process corresponding to the processing task when the net market value of the unit of electricity is highest; and
starting a pending process corresponding to the processing task when the net market value of the processing task is highest.

### Claim 19 (depends on 18)

The method of claim 18, wherein:
the processing task comprises cryptocurrency mining;
determining the market value of the processing task comprises:
determining a reward for completing a cryptocurrency mining task;
accessing a cryptocurrency exchange to determine an exchange rate of the reward to a currency;
determining an expected fraction of the reward by multiplying the reward and a probability of obtaining the reward;
converting the expected fraction of the reward to the currency based on the exchange rate;
estimating an energy cost associated with the processing task; and
setting the market value of the processing task to be the difference between the converted reward fraction and the estimated energy cost.

### Claim 20 (depends on 19)

The method of claim 19, wherein the probability of obtaining the reward comprises a likelihood that a block of a blockchain will be mined within a time interval, the likelihood being based on a distribution of past mining intervals, a target mining time, and an amount of time elapsed since a previous block was mined.