# US 2021/0287177 A1 · Automatic monitoring and reporting system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0287177 A1
- Document ID: US20210287177A1
- Status: Published application
- Kind: A1
- Application number: 17/197,223
- Filed: 2021-03-10
- Published: 2021-09-16
- Earliest claimed: 2020-03-10
- Assignees: Moseley Ltd.
- Applicants: Moseley Ltd.
- Inventors: Paul Tobin MUSIALEK; Barnaby Jamie MUSIALEK
- Web page: https://patentgrep.com/patent/US20210287177A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- G06N 20/00: Machine learning
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q 10/06395: {Quality analysis or management}
- G06Q 50/04: Manufacturing
- Y02P 90/30: Computing systems specially adapted for manufacturing
- Y02P 90/80: Management or planning
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Disclosed herein is a computer-implemented method of monitoring the status of a project, the method comprising: generating workflow data in a standardised format by each of a plurality of users, wherein each user is a participant of the project; sending, by each of the plurality of users, the generated workflow data to a web-based platform; receiving, by the web-based platform, the generated workflow data from each of the plurality of users; automatically generating and updating an inspection and test plan in dependence on the received workflow data by the web-based platform; and generating substantially real-time progress status information of the project in dependence on the inspection and test plan. wherein: the inspection and test plan comprises a plurality of line items, each line item corresponding to a manufacturing step for a product; the generated workflow data in the standardised format by each user corresponds to one or more of the plurality of line items; and each manufacturing step is a step of manufacturing a product that is a component of a manufactured system, wherein the manufactured system includes a plurality of components with each of the plurality of components manufactured by a different user; and the method further comprises automatically: generating one or more metrics based on the workflow data, wherein each metric relates to a particular measurable parameter of the workflow data; analysing the one or more metrics using a machine learning algorithm, trained on historical performance data, to make predictions relating to risks associated with the inspection and test plan; and updating expected completion dates of one or more of the inspection and test plan line items in dependence on the analysis of the one or more metrics.

## Claims

### Claim 1

A computer-implemented method of monitoring the status of a project, the method comprising:
generating workflow data in a standardised format by each of a plurality of users, wherein each user is a participant of the project;
sending, by each of the plurality of users, the generated workflow data to a web-based platform;
receiving, by the web-based platform, the generated workflow data from each of the plurality of users;
automatically generating and updating an inspection and test plan in dependence on the received workflow data by the web-based platform; and
generating substantially real-time progress status information of the project in dependence on the inspection and test plan.
wherein:
the inspection and test plan comprises a plurality of line items, each line item corresponding to a manufacturing and/or construction step for a product;
the generated workflow data in the standardised format by each user corresponds to one or more of the plurality of line items; and
each manufacturing step is a step of manufacturing a product that is a component of a manufactured system, wherein the manufactured system includes a plurality of components with each of the plurality of components manufactured by a different user; and
the method further comprises automatically:
generating one or more metrics based on the workflow data, wherein each metric relates to a particular measurable parameter of the workflow data;
analysing the one or more metrics using a machine learning algorithm, trained on historical performance data, to make predictions relating to risks associated with the inspection and test plan; and
updating expected completion dates of one or more of the inspection and test plan line items in dependence on the analysis of the one or more metrics.

### Claim 2 (depends on 1)

The inspection plan management method of claim 1, wherein:
the plurality of line items each comprise at least one intervention point; and
each intervention point is a trigger for performing a validation activity of the corresponding manufacturing step for the product to be performed.

### Claim 3 (depends on 2)

The inspection plan management method of claim 2, wherein the method further comprises:
predicting, in dependence on the inspection and test plan, when one or more line items are expected to be completed; and
forecasting and/or scheduling one or more intervention points in dependence on the predictions.

### Claim 4 (depends on 2)

The inspection plan management method of claim 2, wherein the method further comprises:
receiving one or more inspection notifications that line items are ready from inspection from one or more of the plurality of users; and
scheduling an intervention point in dependence on the received one or more notifications.

### Claim 5 (depends on 2)

The inspection plan management method of claim 2, wherein the method further comprises:
automatically generating an inspection notification workflow in dependence on the inspection and test plan and the corresponding line item data;
wherein the inspection notification workflow contains relevant information to the intervention point such as the related validation inspection procedure, reference documentation for the validation inspection procedure, and the location of the validation inspection procedure.

### Claim 6 (depends on 2)

The inspection plan management method of claim 2, wherein the method further comprises:
automatically generating an inspection checklist for each intervention point, wherein each inspection checklist is generated in dependence on specification requirements of the manufacturing step associated with the intervention point.

### Claim 7 (depends on 2)

The inspection plan management method of claim 2, wherein the method further comprises:
updating the inspection and test plan with a result of the validation activity procedure.

### Claim 8 (depends on 1)

The inspection plan management method according to claim 1, further comprising:
analysing the inspection and test plan using a machine learning algorithm trained on historical performance data;
determining a risk model based on the analysis of the inspection and test plan, wherein the risk model identifies a likelihood of a line item of the inspection and test plan being delayed; and
determining action suggestions in dependence on the risk model, wherein action suggestions are actions to reduce the risk.

### Claim 9 (depends on 8)

The computer-implemented method of monitoring the status of a project according to claim 8, the method further comprising determining the amount and/or cost of re-worked processes in a project by:
determining if an error has occurred; and
applying data integration and/or artificial intelligence techniques in dependence on data that is determined for each error that occurs so as to determine the amount and/or cost of re-worked processes in a project.

### Claim 10 (depends on 9)

A computing system configured to perform the method of monitoring the status of a project according to claim 9.

### Claim 11 (depends on 1)

A computer program that, when executed in a computing system, causes the computing system to perform the method of monitoring the status of a project according to claim 1.