# US 2021/0287150 A1 · Generating and Presenting Scripts Related to Different Time Periods in Construction Sites

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0287150 A1
- Document ID: US20210287150A1
- Status: Published application
- Kind: A1
- Application number: 17/337,248
- Filed: 2021-06-02
- Published: 2021-09-16
- Earliest claimed: 2020-06-09
- Inventors: Ron Zass
- Web page: https://patentgrep.com/patent/US20210287150A1

## CPC

- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06F 3/167: {Audio in a user interface, e.g. using voice commands for navigating, audio feedback}
- G06F 8/34: Graphical or visual programming
- G06F 8/70: Software maintenance or management
- G06F 9/45512: {Command shells}
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/0633: Workflow analysis
- G06Q 10/06398: {Performance of employee with respect to a job function}
- G06Q 10/103: {Workflow collaboration or project management}
- G06Q 50/08: Construction
- G06T 7/0002: {Inspection of images, e.g. flaw detection}
- G06T 11/60: Creating or editing images; Combining images with text
- G06T 13/40: of characters, e.g. humans, animals or virtual beings
- G06T 13/80: Two-dimensional [2D] animation, e.g. using sprites
- G06V 20/176: {Urban or other man-made structures}
- G06V 20/20: in augmented reality scenes
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q 10/0875: Itemisation or classification of parts, supplies or services, e.g. bill of materials
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06V: IMAGE OR VIDEO RECOGNITION OR UNDERSTANDING

## Abstract

Systems, methods and non-transitory computer readable media for generating and presenting scripts related to different time periods in construction sites. First information related to a status of a construction site during a first time period and second information related to a status of the construction site during a second time period are received. A script based on the first and second information is generated. The generated script includes a first portion associated with the status of the construction site during the first time period and a second portion associated with the status of the construction site during the second time period. The generated script is presented, each portion of the script is presented in conjunction to a presentation of a visual corresponding to the construction site during the corresponding time period.

## Claims

### Claim 1

A non-transitory computer readable medium storing data and computer implementable instructions for carrying out a method for generating and presenting scripts related to different time periods in construction sites, the method comprising:
receiving first information related to a status of a construction site during a first time period and second information related to a status of the construction site during a second time period, wherein the second time period differs from the first time period, and wherein the first information is based on an analysis of a first image data captured from the construction site during the first time period and the second information is based on an analysis of a second image data captured from the construction site during the second time period;
generating a script based on the first information and the second information, the generated script includes at least a first portion associated with the status of the construction site during the first time period and a second portion associated with the status of the construction site during the second time period; and
causing a presentation of the generated script, the presentation of the generated script includes a presentation of the first portion of the generated script in conjunction with a visual presentation of at least part of the first image data and a presentation of the second portion of the generated script in conjunction with a visual presentation of at least part of the second image data.

### Claim 2 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein there is no overlap between the first time period and the second time period.

### Claim 3 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein there is some overlap between the first time period and the second time period.

### Claim 4 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generation of the script is further based on at least one of a construction plan associated with the construction site, a project schedule associated with the construction site, a progress record associated with the construction site and a financial record associated with the construction site.

### Claim 5 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the presentation of the first portion of the generated script and the presentation of the second portion of the generated script are audible.

### Claim 6 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the presentation of the first portion of the generated script includes a presentation of the first portion of the generated script in a textual form in conjunction with the visual presentation of the at least part of the first image data, and wherein the presentation of the second portion of the generated script includes a presentation of the second portion of the generated script in textual form in conjunction with the visual presentation of the at least part of the second image data.

### Claim 7 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to a construction error visible in the first image data and fixed before the second time period, the first portion of the generated script relates to the construction error and the second portion of the generated script relates to the fix of the construction error.

### Claim 8 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to a usage of materials at the construction site between the first time period and the second time period.

### Claim 9 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to a material used at the construction site between the first time period and the second time period.

### Claim 10 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to a work performed at the construction site between the first time period and the second time period.

### Claim 11 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to an issue resolved at the construction site between the first time period and the second time period.

### Claim 12 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to an issue arising at the construction site between the first time period and the second time period.

### Claim 13 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the generated script is related to a delay arising at the construction site between the first time period and the second time period.

### Claim 14 (depends on 1)

The non-transitory computer readable medium of claim 1, wherein the method further comprises:
using the generated script to generate a visual representation of a synthetic character presenting the generated script, the presentation of the generated script by the synthetic character includes a presentation of the first portion of the generated script by the synthetic character in conjunction with the visual presentation of the at least part of the first image data and a presentation of the second portion of the generated script by the synthetic character in conjunction with the visual presentation of the at least part of the second image data.

### Claim 15 (depends on 14)

The non-transitory computer readable medium of claim 14, wherein the presentation of the first portion of the generated script by the synthetic character is presented over a background including the at least part of the first image data, and wherein the presentation of the second portion of the generated script by the synthetic character is presented over a background including the at least part of the second image data.

### Claim 16 (depends on 14)

The non-transitory computer readable medium of claim 14, wherein the generated script is related to a construction error visible in the first image data and fixed before the second time period, the first portion of the generated script relates to the construction error, the second portion of the generated script relates to the fix of the construction error, and the generated visual representation of the synthetic character presenting the generated script includes a visual representation of the synthetic character visually indicating a location in the at least part of the first image data associated with the construction error.

### Claim 17 (depends on 14)

The non-transitory computer readable medium of claim 14, wherein the generated script is related to an object installed in the construction site between the first time period and the second time period, and wherein the generated visual representation of the synthetic character presenting the generated script includes a visual representation of the synthetic character visually indicating the installed object in the at least part of the second image data.

### Claim 18 (depends on 14)

The non-transitory computer readable medium of claim 14, wherein the generated script is related to a modification to an object in the construction site between the first time period and the second time period, and wherein the generated visual representation of the synthetic character presenting the generated script includes a visual representation of the synthetic character visually indicating a location corresponding to the object in the at least part of the first image data and a visual representation of the synthetic character visually indicating the object in the at least part of the second image data.

### Claim 19

A method for generating and presenting scripts related to different time periods in construction sites, the method comprising:
receiving first information related to a status of a construction site during a first time period and second information related to a status of the construction site during a second time period, wherein the second time period differs from the first time period, and wherein the first information is based on an analysis of a first image data captured from the construction site during the first time period and the second information is based on an analysis of a second image data captured from the construction site during the second time period;
generating a script based on the first information and the second information, the generated script includes at least a first portion associated with the status of the construction site during the first time period and a second portion associated with the status of the construction site during the second time period; and
causing a presentation of the generated script, the presentation of the generated script includes a presentation of the first portion of the generated script in conjunction with a visual presentation of at least part of the first image data and a presentation of the second portion of the generated script in conjunction with a visual presentation of at least part of the second image data.

### Claim 20

A system for generating and presenting scripts related to different time periods in construction sites, the system comprising:
at least one processor configured to:
receive first information related to a status of a construction site during a first time period and second information related to a status of the construction site during a second time period, wherein the second time period differs from the first time period, and wherein the first information is based on an analysis of a first image data captured from the construction site during the first time period and the second information is based on an analysis of a second image data captured from the construction site during the second time period;
generate a script based on the first information and the second information, the generated script includes at least a first portion associated with the status of the construction site during the first time period and a second portion associated with the status of the construction site during the second time period; and
cause a presentation of the generated script, the presentation of the generated script includes a presentation of the first portion of the generated script in conjunction with a visual presentation of at least part of the first image data and a presentation of the second portion of the generated script in conjunction with a visual presentation of at least part of the second image data.
