# US 2021/0287122 A1 · Prediction device, prediction method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0287122 A1
- Document ID: US20210287122A1
- Status: Published application
- Kind: A1
- Application number: 17/258,823
- Filed: 2019-07-24
- Published: 2021-09-16
- Earliest claimed: 2018-08-23
- Assignees: Mitsubishi Power, Ltd.
- Applicants: Mitsubishi Power, Ltd.
- Inventors: Masumi NOMURA; Yusuke HAZUI; Shigeru ANO; Kenta WADA; Koshiro FUKUMOTO
- Web page: https://patentgrep.com/patent/US20210287122A1

## CPC

- G05B 23/0289: {Reconfiguration to prevent failure, e.g. usually as a reaction to incipient failure detection}
- G06N 5/04: Inference or reasoning models
- G05B 13/048: {using a predictor}
- G06N 20/00: Machine learning
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Provided is a prediction device that outputs a prediction value of process data in consideration of a prediction error of a prediction model. A prediction device includes a data collection unit that collects process data of a device; a prediction model construction unit that constructs a prediction model having a predetermined input variable of first process data as an input value and having a predetermined output variable as an output value, and an error calculation model which calculates a prediction error of the prediction model, based on the first process data collected by the data collection unit; and a prediction unit that outputs a prediction value which is corrected based on a prediction value of the output variable for second process data and a prediction error for the prediction value of the output variable, the prediction value being predicted based on the input variable of the second process data collected by the data collection unit, the prediction model, and the error calculation model.

## Claims

### Claim 1

A prediction device comprising:
a data collection unit that collects process data of a device;
a prediction model construction unit that constructs a prediction model having a predetermined input variable of first process data as an input value and having a predetermined output variable of the process data as an output value, and an error calculation model which calculates a prediction error of the prediction model, based on the first process data collected by the data collection unit; and
a prediction unit that outputs a corrected prediction value which is obtained by correcting a prediction value of the output variable with the prediction error calculated based on the error calculation model, the prediction value being calculated based on the input variable of second process data collected by the data collection unit and on the prediction model.

### Claim 2 (depends on 1)

The prediction device according to claim 1,
wherein the prediction unit adds or subtracts the prediction error to or from the prediction value to correct the prediction value such that the corrected prediction value is not safer or is less efficient than the prediction value before correction.

### Claim 3 (depends on 1)

The prediction device according to claim 1, further comprising:
a state monitoring unit that compares the process data with a predetermined threshold value to determine whether or not the process data is abnormal; and
an operation-amount determination unit that calculates an operation amount which improves the corrected prediction value when the state monitoring unit determines that the process data is abnormal.

### Claim 4 (depends on 3)

The prediction device according to claim 3, further comprising:
a first output unit that outputs the operation amount, which is calculated by the operation-amount determination unit, to a control device of the device.

### Claim 5 (depends on 1)

The prediction device according to claim 1, further comprising:
a second output unit that displays the corrected prediction value and a graph, which visualizes the prediction model, in a superimposed manner.

### Claim 6

A prediction method comprising:
a step of collecting process data of a device;
a step of constructing a prediction model having a predetermined input variable of first process data as an input value and having a predetermined output variable of the process data as an output value, and an error calculation model which calculates a prediction error of the prediction model, based on the first process data collected in the step of collecting the process data;
a step of collecting second process data of an evaluation target; and
a step of outputting a corrected prediction value that is obtained by correcting a prediction value of the output variable with the prediction error calculated based on the error calculation model, the prediction value being calculated based on the input variable of the collected second process data and on the prediction model.

### Claim 7

A program that causes a computer to function as
means for collecting process data of a device;
means for constructing a prediction model having a predetermined input variable of first process data as an input value and having a predetermined output variable of the process data as an output value, and an error calculation model which calculates a prediction error of the prediction model, based on the first process data collected in a step of collecting the process data;
means for collecting second process data of an evaluation target; and
means for outputting a corrected prediction value that is obtained by correcting a prediction value of the output variable with the prediction error calculated based on the error calculation model, the prediction value being calculated based on the input variable of the collected second process data and on the prediction model.
