# US 2021/0286519 A1 · Data management system and data management method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0286519 A1
- Document ID: US20210286519A1
- Status: Published application
- Kind: A1
- Application number: 17/106,174
- Filed: 2020-11-29
- Published: 2021-09-16
- Earliest claimed: 2020-03-13
- Assignees: Yokogawa Electric Corporation
- Applicants: Yokogawa Electric Corporation
- Inventors: Nobuaki EMA; Yoshitaka YOSHIDA
- Web page: https://patentgrep.com/patent/US20210286519A1

## CPC

- G06F 3/0604: {Improving or facilitating administration, e.g. storage management}
- G06Q 50/04: Manufacturing
- G05B 23/0221: {Preprocessing measurements, e.g. data collection rate adjustment; Standardization of measurements; Time series or signal analysis, e.g. frequency analysis or wavelets; Trustworthiness of measurements; Indexes therefor; Measurements using easily measured parameters to estimate parameters difficult to measure; Virtual sensor creation; De-noising; Sensor fusion; Unconventional preprocessing inherently present in specific fault detection methods like PCA-based methods}
- G06F 3/0608: {Saving storage space on storage systems}
- G06F 3/0652: {Erasing, e.g. deleting, data cleaning, moving of data to a wastebasket}
- G06F 3/0673: {Single storage device}
- G06F 3/0679: {Non-volatile semiconductor memory device, e.g. flash memory, one time programmable memory [OTP]}
- G06F 16/24568: {Data stream processing; Continuous queries}
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A data management system is provided, which includes a data acquiring unit for acquiring, from each of a plurality of sensors, measurement data generated by measuring a measurement target, a data storage unit for recording the measurement data, a priority setting unit for setting a priority to be given to each of the plurality of sensors, based on the measurement data acquired from each of the plurality of sensors, a data selecting unit for selecting data to be deleted from among the measurement data, according to the priority for each of the plurality of sensors, and a data deleting unit for deleting the data to be deleted.

## Claims

### Claim 1

A data management system comprising:
a data acquiring unit for acquiring, from each of a plurality of sensors, measurement data generated by measuring a measurement target;
a data storage unit for recording the measurement data;
a priority setting unit for setting a priority to be given to each of the plurality of sensors, based on the measurement data acquired from each of the plurality of sensors;
a data selecting unit for selecting data to be deleted from among the measurement data, according to the priority for each of the plurality of sensors; and
a data deleting unit for deleting the data to be deleted.

### Claim 2 (depends on 1)

The data management system according to claim 1, wherein the data selecting unit is configured to preferentially select the measurement data acquired from the sensor with a low priority as the data to be deleted.

### Claim 3 (depends on 2)

The data management system according to claim 2, wherein the priority setting unit is configured to calculate a variance of the measurement data for each of the plurality of sensors during a predetermined period, and set the sensor having a smaller variance to be given a lower priority than the sensor having a greater variance.

### Claim 4 (depends on 2)

The data management system according to claim 2, wherein the priority setting unit is configured to calculate a variation of the measurement data for each of the plurality of sensors during a predetermined period, and set the sensor having a smaller variation to be given a lower priority than the sensor having a greater variation.

### Claim 5 (depends on 2)

The data management system according to claim 2, wherein the priority setting unit is configured to calculate the difference between estimation data estimated and the measurement data for each of the plurality of sensors, and set a sensor having a smaller difference to be given a lower priority than a sensor having a greater difference.

### Claim 6 (depends on 1)

The data management system according to claim 1, wherein the priority setting unit is configured to dynamically update the priority for each of the plurality of sensors.

### Claim 7 (depends on 6)

The data management system according to claim 6, wherein the priority setting unit is configured to update the priority for each of the plurality of sensors at a predetermined timing.

### Claim 8 (depends on 7)

The data management system according to claim 7, wherein the priority setting unit is configured to change the criterion for setting the priority before or after the predetermined timing.

### Claim 9 (depends on 6)

The data management system according to claim 6, wherein the priority setting unit is configured to update the priority for each of the plurality of sensors in response to occurrence of a predetermined event.

### Claim 10 (depends on 9)

The data management system according to claim 9, wherein the priority setting unit is configured to change the criterion for setting the priority before or after the occurrence of the predetermined event.

### Claim 11 (depends on 1)

The data management system according to claim 1, further comprising a data sending unit for sending the measurement data after deleting the data to be deleted to another system or apparatus.

### Claim 12

A data management method comprising:
acquiring, from each of a plurality of sensors, measurement data generated by measuring a measurement target;
recording the measurement data;
setting a priority to be given to each of the plurality of sensors, based on the measurement data acquired from each of the plurality of sensors;
selecting data to be deleted from among the measurement data, according to the priority for each of the plurality of sensors; and
deleting the data to be deleted.
