Production system, control method, and information storage medium
AssigneeKabushiki Kaisha Yaskawa Denki
InventorsTakeshi NAGATA, Takahiko SUZUKI, Shinichiro OBATA
Life of this patent
Estimating the term…
Abstract
A production system, comprising: a first industrial machine configured to control a second industrial machine based on each of a plurality of variables; and circuitry configured to input, to the first industrial machine, a control command relating to an operation of at least one of the first industrial machine or the second industrial machine, wherein the first industrial machine rewrites, based on the control command, at least one variable defined as a rewritable variable among the plurality of variables.
Claims20
A production system, comprising:
- a first industrial machine configured to control a second industrial machine based on each of a plurality of variables;
- and
- circuitry configured to input, to the first industrial machine, a control command relating to an operation of at least one of the first industrial machine or the second industrial machine,
- wherein the first industrial machine rewrites, based on the control command, at least one variable defined as a rewritable variable among the plurality of variables.
A control method, comprising:
- inputting, to a first industrial machine configured to control a second industrial machine based on each of a plurality of variables, a control command relating to an operation of at least one of the first industrial machine or the second industrial machine;
- and
- rewriting, by the first industrial machine, based on the control command, at least one variable defined as a rewritable variable among the plurality of variables.
A non-transitory computer readable information storage medium storing a program for causing a first industrial machine configured to control a second industrial machine based on each of a plurality of variables to rewrite, based on a control command relating to an operation of at least one of the first industrial machine or the second industrial machine, at least one variable defined as a rewritable variable among the plurality of variables.
Dependencies are inferred from the claim text.