# US 2021/0286018 A1 · Battery Management System and Battery Management Method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0286018 A1
- Document ID: US20210286018A1
- Status: Published application
- Kind: A1
- Application number: 17/198,401
- Filed: 2021-03-11
- Published: 2021-09-16
- Earliest claimed: 2020-03-12
- Assignees: SK Innovation Co., Ltd.
- Applicants: SK Innovation Co., Ltd.
- Inventors: Doo Jin Jeong; Jeong Min Seo; Kyu Min Hwang; Byung Eun Lee
- Web page: https://patentgrep.com/patent/US20210286018A1

## CPC

- G01R 31/392: Determining battery ageing or deterioration, e.g. state of health
- G01R 31/382: Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R 31/396: Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
- H01M 10/4257: {Smart batteries, e.g. electronic circuits inside the housing of the cells or batteries}
- H02J 7/50: acting upon multiple batteries simultaneously or sequentially
- H02J 7/82: Control of state of charge [SOC]
- H02J 7/84: Control of state of health [SOH]
- G01R 31/387: Determining ampere-hour charge capacity or SoC
- H01M 2010/4271: {Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing}
- Y02E 60/10: Energy storage using batteries
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

Provided are a battery management system and a battery management method using the same. According to the present invention, it is possible to select high-risk battery cells that are highly likely to be out of an operating voltage range by applying a change amount according to SoH for each of the battery cells to each SoC for each of the battery cells, and calculate the representative SoH of the battery pack based on the selected high-risk battery cells, and then calculate the actual usable capacity of the battery pack.

## Claims

### Claim 1

A battery management system for selecting, from a plurality of battery cells constituting a battery pack, a high-risk battery cell that has a risk that a terminal voltage during charging or a terminal voltage during discharging is out of an operating voltage, the battery management system comprising:
a state information calculator that calculates state information of each of the plurality of battery cells; and
a cell selector that selects the high-risk battery cell using the state information,
wherein the state information calculated by the state information calculator includes at least one of a state of charge (SoC) and a state of health (SoH), and
wherein the cell selector selects the high-risk battery cell by using the state information of at least one of the SoC of each of the battery cells and the SoH of each of the battery cells at a current measurement time point.

### Claim 2 (depends on 1)

The battery management system of claim 1, wherein the cell selector selects the high-risk battery cell by applying a change amount of the SoC according to the SoH of each of the battery cells to the SoC of each of the battery cells at the current measurement time point.

### Claim 3 (depends on 2)

The battery management system of claim 2, wherein the cell selector selects a battery cell to be fully charged first as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the battery cells based on the SoC of each of the battery cells at the current measurement time point, and selects a battery cell to be fully discharged first as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the battery cells based on the SoC of each of the battery cells at the current measurement time point.

### Claim 4 (depends on 1)

The battery management system of claim 1, wherein the cell selector selects a battery cell having the lowest SoH among the battery cells as the high-risk battery cell.

### Claim 5 (depends on 3)

The battery management system of claim 3, wherein when a current flows into the selected high-risk battery cell at 1 C-rate based on the initial usable capacity of the battery cells, the cell selector calculates a representative SoH of the battery pack by applying the following Equation 1 to K which is a summed value of a time from the current measurement time point until the battery cell to be fully discharged first is fully discharged and a time from the current measurement time point until the battery cell to be fully charged first is fully charged,
SoHpack=K×100 [Equation 1]
where SoHpack is the representative SoH of the battery pack, and the unit of K is time (hr).

### Claim 6 (depends on 5)

The battery management system of claim 5, further comprising:
a capacity calculator that calculates the actual usable capacity of the battery pack,
wherein the actual usable capacity of the battery pack calculated by the capacity calculator is calculated through the following Equation 2,
CPpack=SoHpack×CPBOL [Equation 2]
where CPpack is the actual usable capacity of the battery pack, SoHpack is the representative SoH of the battery pack, and CPBOL is the initial usable capacity of the battery cell.

### Claim 7

A battery management method using a battery management system for selecting, from a plurality of battery cells constituting a battery pack, a high-risk battery cell that has a risk that a terminal voltage during charging or a terminal voltage during discharging is out of an operating voltage, the battery management method comprising:
calculating state information of each of the plurality of battery cells; and
selecting the high-risk battery cell using the state information,
wherein the state information includes at least one of SoC and SoH, and
wherein the selecting of the high-risk battery cell, the high-risk battery cell is selected by using the state information of at least one of the SoC of each of the battery cells and the SoH of each of the battery cells at a current measurement time point.

### Claim 8 (depends on 7)

The battery management method of claim 7, wherein in the selecting of the high-risk battery cell, the high-risk battery cell is selected by applying a change amount of the SoC according to the SoH of each of the battery cells to the SoC of each of the battery cells at the current measurement time point.

### Claim 9 (depends on 8)

The battery management method of claim 8, wherein in the selecting of the high-risk battery cell, a battery cell to be fully charged first is selected as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the battery cells based on the SoC of each of the battery cells at the current measurement time point, and a battery cell to be fully discharged first is selected as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the battery cells based on the SoC of each of the battery cells at the current measurement time point.

### Claim 10 (depends on 7)

The battery management method of claim 7, wherein in the selecting of the high-risk battery cell, a battery cell having a lowest SoH among the battery cells is selected as the high-risk battery cell.

### Claim 11 (depends on 7)

The battery management method of claim 7, further comprising:
after the selecting of the high-risk battery cell, calculating a representative SoH of the battery pack by applying the following Equation 3 to K which is a summed value of a time from the current measurement time point until the battery cell to be fully discharged first is fully discharged and a time from the current measurement time point until the battery cell to be fully charged first is fully charged, when a current flows into the selected high-risk battery cell at 1 C-rate based on the initial usable capacity of the battery cells,
SoHpack=K×100 [Equation 3]
where SoHpack is the representative SoH of the battery pack, and the unit of K is time (hr).

### Claim 12 (depends on 11)

The battery management method of claim 11, further comprising:
after the calculating of the representative SoH of the battery pack, calculating the actual usable capacity of the battery pack through the following Equation 4,
CPpack=SoHpack×CPBOL [Equation 4]
wherein CPpack is the actual usable capacity of the battery pack, SoHpack is the representative SoH of the battery pack, and CPBOL is the initial usable capacity of the battery cell.
