# US 2021/0285995 A1 · Time synchronization using power system synchrophasor measurements

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0285995 A1
- Document ID: US20210285995A1
- Status: Published application
- Kind: A1
- Application number: 16/818,401
- Filed: 2020-03-13
- Published: 2021-09-16
- Earliest claimed: 2020-03-13
- Assignees: University of Tennessee Research Foundation; Traffic Technology Services, Inc.
- Applicants: University of Tennessee Research Foundation; Traffic Technology Services, Inc.
- Inventors: Yilu Liu; Ling Wu; Jingtao Ma; Thomas Bauer
- Web page: https://patentgrep.com/patent/US20210285995A1

## CPC

- G01R 29/18: Indicating phase sequence; Indicating synchronism
- G01R 19/175: Indicating the instants of passage of current or voltage through a given value, e.g. passage through zero
- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H04W 4/40: for vehicles, e.g. vehicle-to-pedestrians [V2P]
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H04Q 2209/60: for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/22: Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04Q: SELECTING (switches, relays, selectors H01H; wireless communication networks H04W)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method includes performing by a processor: receiving a plurality of power system synchrophasor measurements over a time interval from a plurality of phasor measurement units (PMUs) in a power system, determining a variation in frequency of a power signal generated by the power system based on the plurality of power system synchrophasor measurements, and determining a clock time shift based on the variation in frequency of the power signal.

## Claims

### Claim 1

A method comprising:
performing by a processor:
receiving a plurality of power system synchrophasor measurements over a time interval from a plurality of phasor measurement units (PMUs) in a power system;
determining a variation in frequency of a power signal generated by the power system based on the plurality of power system synchrophasor measurements; and
determining a clock time shift based on the variation in frequency of the power signal.

### Claim 2 (depends on 1)

The method of claim 1, wherein determining the variation in frequency of the power signal comprises:
determining a first variation in frequency of the power signal based on at least a first portion of the plurality of power system synchrophasor measurements; and
determining a second variation in frequency of the power signal based on at least a second portion of the plurality of power system synchrophasor measurements;
wherein determining the clock time shift comprises:
determining a first clock time shift based on the first variation in frequency of the power signal; and
determining a second clock time shift based on the second variation in frequency of the power signal.

### Claim 3 (depends on 2)

The method of claim 2, further comprising:
determining a first clock time adjustment and a second clock time adjustment based on the first clock time shift and the second clock time shift, respectively, to reduce a time offset between the first clock and the second clock.

### Claim 4 (depends on 3)

The method of claim 3, wherein a vehicular traffic management center operates based on the first clock; and
wherein a traffic signal controller operates based on the second clock, the traffic signal controller being under control of the vehicular traffic management center.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
communicating the first clock time adjustment to the vehicular traffic management center; and
communicating the second clock time adjustment to the traffic signal controller.

### Claim 6 (depends on 5)

The method of claim 5, wherein communicating the first clock time adjustment comprises communicating the first clock time adjustment to the vehicular traffic management center via a packet switched connection; and
wherein communicating the second clock time adjustment comprises communicating the second clock time adjustment to the traffic signal controller via the packet switched connection.

### Claim 7 (depends on 6)

The method of claim 6, wherein the packet switched connection comprises an Ethernet connection.

### Claim 8 (depends on 7)

The method of claim 7, wherein the first clock time adjustment comprises first Multiprotocol Label Switching (MPLS) packet data; and
wherein the second clock time adjustment comprises second MPLS packet data.

### Claim 9 (depends on 8)

The system of claim 8, wherein a first label of the first MPLS packet data comprises a first identifier that identifies a first communication service provider; and
wherein a second label of the second MPLS packet data comprises a second identifier that identifies a second communication service provider.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
determining a clock time adjustment based on the clock time shift; and
communicating the clock time adjustment to an entity that operates based on the clock.

### Claim 11 (depends on 1)

The method of claim 1, further comprising:
generating an alert based on the clock time shift.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
communicating the alert to an entity that operates based on the clock.

### Claim 13

A system, comprising:
a processor; and
a memory coupled to the processor and comprising computer readable program code embodied in the memory that is executable by the processor to perform operations comprising:
receiving a plurality of power system synchrophasor measurements over a time interval from a plurality of phasor measurement units (PMUs) in a power system;
determining a variation in frequency of a power signal generated by the power system based on the plurality of power system synchrophasor measurements; and
determining a clock time shift based on the variation in frequency of the power signal.

### Claim 14 (depends on 13)

The system of claim 13, wherein determining the variation in frequency of the power signal comprises:
determining a first variation in frequency of the power signal based on at least a first portion of the plurality of power system synchrophasor measurements; and
determining a second variation in frequency of the power signal based on at least a second portion of the plurality of power system synchrophasor measurements;
wherein determining the clock time shift comprises:
determining a first clock time shift based on the first variation in frequency of the power signal; and
determining a second clock time shift based on the second variation in frequency of the power signal.

### Claim 15 (depends on 14)

The system of claim 14, wherein the operations further comprise:
determining a first clock time adjustment and a second clock time adjustment based on the first clock time shift and the second clock time shift, respectively, to reduce a time offset between the first clock and the second clock.

### Claim 16 (depends on 15)

The system of claim 15, wherein a vehicular traffic management center operates based on the first clock; and
wherein a traffic signal controller operates based on the second clock, the traffic signal controller being under control of the vehicular traffic management center.

### Claim 17 (depends on 16)

The system of claim 16, wherein the operations further comprise: communicating the first clock time adjustment to the vehicular traffic management center; and
communicating the second clock time adjustment to the traffic signal controller.

### Claim 18

A computer program product, comprising:
a tangible computer readable storage medium comprising computer readable program code embodied in the medium that is executable by a processor to perform operations comprising:
determining a first variation in frequency of the power signal based on at least a first portion of the plurality of power system synchrophasor measurements; and
determining a second variation in frequency of the power signal based on at least a second portion of the plurality of power system synchrophasor measurements;
wherein determining the clock time shift comprises:
determining a first clock time shift based on the first variation in frequency of the power signal; and
determining a second clock time shift based on the second variation in frequency of the power signal.

### Claim 19 (depends on 18)

The computer program product of claim 18, wherein the operations further comprise:
determining a first clock time adjustment and a second clock time adjustment based on the first clock time shift and the second clock time shift, respectively, to reduce a time offset between the first clock and the second clock.

### Claim 20 (depends on 19)

The computer program product of claim 19, wherein a vehicular traffic management center operates based on the first clock; and
wherein a traffic signal controller operates based on the second clock, the traffic signal controller being under control of the vehicular traffic management center;
wherein the operations further comprise:
communicating the first clock time adjustment to the vehicular traffic management center; and
communicating the second clock time adjustment to the traffic signal controller.
