# US 2021/0285674 A1 · Systems and methods to automatically link availability of series devices in a plant

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0285674 A1
- Document ID: US20210285674A1
- Status: Published application
- Kind: A1
- Application number: 17/334,235
- Filed: 2021-05-28
- Published: 2021-09-16
- Earliest claimed: 2017-07-27
- Assignees: Johnson Controls Technology Company
- Applicants: Johnson Controls Technology Company
- Inventors: Matthew J. Asmus; Maxwell J. Neuman
- Web page: https://patentgrep.com/patent/US20210285674A1

## CPC

- F24F 11/54: using one central controller connected to several sub-controllers
- F24F 11/52: Indication arrangements, e.g. displays
- F24F 11/56: Remote control
- F24F 11/74: for controlling air flow rate or air velocity
- H04L 67/125: involving control of end-device applications over a network
- F24F 11/50: characterised by user interfaces or communication
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A controller for a plurality of interconnected devices in a system is shown. The controller includes a processing circuit configured to detect that a first device of the plurality of interconnected devices is unavailable and identify a second device of the plurality of interconnected devices schematically dependent upon the first device by conducting a graph theory analysis on schematic relationships indicating connections among the plurality of interconnected devices. The processing circuit is further configured to, in response to identifying the second device schematically dependent upon the first device, generate a reduced subset of the plurality of interconnected devices that excludes the second device. The processing circuit is further configured to operate the reduced subset to transfer one or more resources among the reduced subset via the connections.

## Claims

### Claim 1

A controller for a plurality of interconnected devices in a system, the controller comprising a processing circuit configured to:
detect that a first device of the plurality of interconnected devices is unavailable;
identify a second device of the plurality of interconnected devices schematically dependent upon the first device by conducting a graph theory analysis on schematic relationships indicating connections among the plurality of interconnected devices;
in response to identifying the second device schematically dependent upon the first device, generate a reduced subset of the plurality of interconnected devices that excludes the second device; and
operate the reduced subset to transfer one or more resources among the reduced subset via the connections.

### Claim 2 (depends on 1)

The controller of claim 1, wherein conducting the graph theory analysis on the schematic relationships comprises:
in response to detecting that the first device is unavailable, updating a first matrix of available devices to indicate that the first device is unavailable, wherein the first matrix comprises an availability of each device in the plurality of interconnected devices; and
using the first matrix to update a second matrix, wherein the second matrix identifies a connection to a node for the first device.

### Claim 3 (depends on 2)

The controller of claim 2, wherein conducting the graph theory analysis on the schematic relationships further comprises:
using the second matrix to determine that the second device is connected to the node and is located downstream of the first device;
determining that there are no devices located upstream of the node and connected to the node; and
in response to determining that there are no devices located upstream of the node and connected to the node, removing the second device from the plurality of interconnected devices to generate the reduced subset of the plurality of interconnected devices.

### Claim 4 (depends on 3)

The controller of claim 3, wherein removing the second device from the plurality of interconnected devices comprises:
updating the first matrix to identify that the second device is unavailable; and
updating the second matrix using the first matrix to remove the second device from the plurality of interconnected devices.

### Claim 5 (depends on 1)

The controller of claim 1, wherein the controller is further configured to, in response to removing the second device from the plurality of interconnected devices to generate the reduced subset, conduct the graph theory analysis repeatedly until there are no more devices of the plurality of interconnected devices that are schematically dependent on any device of the plurality of interconnected devices that is unavailable.

### Claim 6 (depends on 1)

The controller of claim 1, wherein conducting the graph theory analysis on the schematic relationships comprises:
using a plurality of matrices to identify the second device of the plurality of interconnected devices schematically dependent upon the first device, wherein:
each set of elements of a matrix of the plurality of matrices in a first direction is associated with a corresponding device of the plurality of interconnected devices; and
each set of elements of the matrix of the plurality of matrices in a second direction is associated with a corresponding node.

### Claim 7 (depends on 1)

The controller of claim 1, wherein operating the reduced subset to transfer the one or more resources among the reduced subset via the connections comprises operating the reduced subset to transfer at least one of:
a first fluid, wherein the system is a chiller system, and the first device is at least one of a pump, valve, storage unit, or a chiller;
a second fluid, wherein the system is an air flow system, and the first device is at least one of a variable air volume (VAV) box, a damper, an actuator, or a fan; and
a flow of electricity, wherein the system is an electrical system, and the first device is at least one of a motor, a generator, or an electric HVAC device.

### Claim 8 (depends on 7)

The controller of claim 7, wherein the processing circuit is further configured to generate the schematic relationships indicating connections among the plurality of interconnected devices using a combination of devices from a plurality of different subsystems, the plurality of different subsystems comprising the chiller system, the air flow system, and the electrical system.

### Claim 9

A method for controlling a plurality of interconnected devices in a system, the method comprising:
detecting that a first device of the plurality of interconnected devices is unavailable;
identifying a second device of the plurality of interconnected devices schematically dependent upon the first device by conducting a graph theory analysis on schematic relationships indicating connections among the plurality of interconnected devices;
in response to identifying the second device schematically dependent upon the first device, generate a reduced subset of the plurality of interconnected devices that excludes the second device; and
operating the reduced subset to transfer one or more resources among the reduced subset via the connections.

### Claim 10 (depends on 9)

The method of claim 9, wherein conducting the graph theory analysis on the schematic relationships comprises:
in response to detecting that the first device is unavailable, updating a first matrix of available devices to indicate that the first device is unavailable, wherein the first matrix comprises an availability of each device in the plurality of interconnected devices; and
using the first matrix to update a second matrix, wherein the second matrix identifies a connection to a node for the first device.

### Claim 11 (depends on 10)

The method of claim 10, wherein conducting the graph theory analysis on the schematic relationships further comprises:
using the second matrix to determine that the second device is connected to the node and is located downstream of the first device;
determining that there are no devices located upstream of the node and connected to the node; and
in response to determining that there are no devices located upstream of the node and connected to the node, removing the second device from the plurality of interconnected devices to generate the reduced subset of the plurality of interconnected devices.

### Claim 12 (depends on 11)

The method of claim 11, wherein removing the second device from the plurality of interconnected devices comprises:
updating the first matrix to identify that the second device is unavailable; and
updating the second matrix using the first matrix to remove the second device from the plurality of interconnected devices.

### Claim 13 (depends on 9)

The method of claim 9, wherein the controller is further configured to, in response to removing the second device from the plurality of interconnected devices to generate the reduced subset, conduct the graph theory analysis repeatedly until there are no more devices of the plurality of interconnected devices that are schematically dependent on any device of the plurality of interconnected devices that is unavailable.

### Claim 14 (depends on 9)

The method of claim 9, wherein conducting the graph theory analysis on the schematic relationships comprises:
using a plurality of matrices to identify the second device of the plurality of interconnected devices schematically dependent upon the first device, wherein:
each set of elements of a matrix of the plurality of matrices in a first direction is associated with a corresponding device of the plurality of interconnected devices; and
each set of elements of the matrix of the plurality of matrices in a second direction is associated with a corresponding node.

### Claim 15 (depends on 9)

The method of claim 9, wherein operating the reduced subset to transfer the one or more resources among the reduced subset via the connections comprises operating the reduced subset to transfer at least one of:
a first fluid, wherein the system is a chiller system, and the first device is at least one of a pump, valve, storage unit, or a chiller;
a second fluid, wherein the system is an air flow system, and the first device is at least one of a variable air volume (VAV) box, a damper, an actuator, or a fan; and
a flow of electricity, wherein the system is an electrical system, and the first device is at least one of a motor, a generator, or an electric HVAC device.

### Claim 16 (depends on 15)

The method of claim 15, wherein the method further comprises generating the schematic relationships indicating connections among the plurality of interconnected devices using a combination of devices from a plurality of different subsystems, the plurality of different subsystems comprising the chiller system, the air flow system, and the electrical system.

### Claim 17

A control system for controlling a plurality of interconnected devices in a system, the controller comprising a controller comprising a processing circuit configured to:
detect that a first device of the plurality of interconnected devices is unavailable;
identify a second device of the plurality of interconnected devices schematically dependent upon the first device by conducting a graph theory analysis on schematic relationships indicating connections among the plurality of interconnected devices;
in response to identifying the second device schematically dependent upon the first device, generate a reduced subset of the plurality of interconnected devices that excludes the second device;
operate the reduced subset to transfer one or more resources among the reduced subset via the connections; and
in response to removing the second device from the plurality of interconnected devices to generate the reduced subset, conduct the graph theory analysis repeatedly until there are no more devices of the plurality of interconnected devices that are schematically dependent on any device of the plurality of interconnected devices that is unavailable.

### Claim 18 (depends on 17)

The control system of claim 17, wherein conducting the graph theory analysis on the schematic relationships comprises:
in response to detecting that the first device is unavailable, updating a first matrix of available devices to indicate that the first device is unavailable, wherein the first matrix comprises an availability of each device in the plurality of interconnected devices; and
using the first matrix to update a second matrix, wherein the second matrix identifies a connection to a node for the first device.

### Claim 19 (depends on 17)

The control system of claim 17, wherein conducting the graph theory analysis on the schematic relationships further comprises:
using the second matrix to determine that the second device is connected to the node and is located downstream of the first device;
determining that there are no devices located upstream of the node and connected to the node; and
in response to determining that there are no devices located upstream of the node and connected to the node, removing the second device from the plurality of interconnected devices to generate the reduced subset of the plurality of interconnected devices.

### Claim 20 (depends on 17)

The control system of claim 17, wherein removing, the second device from the plurality of interconnected devices comprises:
updating the first matrix to identify that the second device is unavailable; and
updating the second matrix using the first matrix to remove the second device from the plurality of interconnected devices.
