# US 2021/0279162 A1 · Method and system for generating latency aware workloads using resource devices in a resource device pool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0279162 A1
- Document ID: US20210279162A1
- Status: Published application
- Kind: A1
- Application number: 16/808,805
- Filed: 2020-03-04
- Published: 2021-09-09
- Earliest claimed: 2020-03-04
- Assignees: Dell Products L.P.
- Applicants: Dell Products L.P.
- Inventors: Rizwan Ali; Dharmesh M. Patel; Ravikanth Chaganti
- Web page: https://patentgrep.com/patent/US20210279162A1

## CPC

- G06F 9/5061: {Partitioning or combining of resources}
- G06F 11/3414: {Workload generation, e.g. scripts, playback}
- G06F 9/5011: {the resources being hardware resources other than CPUs, Servers and Terminals}
- G06F 9/5083: {Techniques for rebalancing the load in a distributed system}
- G06F 11/2025: {using centralised failover control functionality}
- G06F 11/2028: {eliminating a faulty processor or activating a spare}
- G06F 11/3495: {for systems}
- G06F 11/2035: {without idle spare hardware}
- G06F 2209/5011: Pool
- G06F 2209/502: Proximity
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method for managing data includes obtaining, by a management module, a workload generation request, wherein the workload generation request specifies a plurality of resource devices, identifying available resource devices in a resource device pool based on the plurality of resource devices, performing a latency analysis on the available resource devices to obtain a plurality of resource device combinations and a total latency cost of each resource device combination, and selecting a resource device combination of the plurality of resource device combinations based on the total latency cost of each resource device combination, wherein the resource device combination comprises a second plurality of resource devices and wherein each of the second plurality of resource devices is one of the plurality of resource devices.

## Claims

### Claim 1

A method for managing data, the method comprising:
obtaining, by a management module, a workload generation request, wherein the workload generation request specifies a plurality of resource devices;
identifying available resource devices in a resource device pool based on the plurality of resource devices;
performing a latency analysis on the available resource devices to obtain a plurality of resource device combinations and a total latency cost of each resource device combination; and
selecting a resource device combination of the plurality of resource device combinations based on the total latency cost of each resource device combination, wherein the resource device combination comprises a second plurality of resource devices and wherein each of the second plurality of resource devices is one of the plurality of resource devices.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
allocating the second plurality of resource devices based on the selecting; and
updating a resource allocation master list based on the allocating.

### Claim 3 (depends on 1)

The method of claim 1, wherein performing the latency analysis comprises:
identifying the resource device combination;
identifying a latency cost of a pair of resource devices in the resource device combination; and
calculating a total latency cost of the resource device combination based at least on the latency cost of the pair of resource devices.

### Claim 4 (depends on 3)

The method of claim 3,
wherein each resource device in the pair of resource devices is directly connected to one of a plurality of switch fabrics, and
wherein the latency cost of the pair of resource devices is based on connections between the plurality of switch fabrics.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second plurality of resource devices implement a workload.

### Claim 6 (depends on 5)

The method of claim 5, wherein the workload is associated with an infrastructure persona.

### Claim 7 (depends on 1)

The method of claim 1, wherein selecting the resource device combination comprises:
identifying a lowest total latency cost; and
making a determination that the resource device combination is associated with the lowest total latency cost.

### Claim 8

A non-transitory computer readable medium comprising computer readable program code, which when executed by a computer processor enables the computer processor to perform a method for managing data, the method comprising:
obtaining, by a management module, a workload generation request, wherein the workload generation request specifies a plurality of resource devices;
identifying available resource devices in a resource device pool based on the plurality of resource devices;
performing a latency analysis on the available resource devices to obtain a plurality of resource device combinations and a total latency cost of each resource device combination; and
selecting a resource device combination of the plurality of resource device combinations based on the total latency cost of each resource device combination, wherein the resource device combination comprises a second plurality of resource devices and wherein each of the second plurality of resource devices is one of the plurality of resource devices.

### Claim 9 (depends on 8)

The non-transitory computer readable medium of claim 8, the method further comprising:
allocating the second plurality of resource devices based on the selecting; and
updating a resource allocation master list based on the allocating.

### Claim 10 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein performing the latency analysis comprises:
identifying the resource device combination;
identifying a latency cost of a pair of resource devices in the resource device combination; and
calculating a total latency cost of the resource device combination based at least on the latency cost of the pair of resource devices.

### Claim 11 (depends on 10)

The non-transitory computer readable medium of claim 10,
wherein each resource device in the pair of resource devices is directly connected to one of a plurality of switch fabrics, and
wherein the latency cost of the pair of resource devices is based on connections between the plurality of switch fabrics.

### Claim 12 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein the second plurality of resource devices implement a workload.

### Claim 13 (depends on 12)

The non-transitory computer readable medium of claim 12, wherein the workload is associated with an infrastructure persona.

### Claim 14 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein selecting the resource device combination comprises:
identifying a lowest total latency cost; and
making a determination that the resource device combination is associated with the lowest total latency cost.

### Claim 15

A system, comprising:
a processor; and
memory comprising instructions, which when executed by the processor, perform a method, the method comprising:
obtaining, by a management module, a workload generation request, wherein the workload generation request specifies a plurality of resource devices;
identifying available resource devices in a resource device pool based on the plurality of resource devices;
performing a latency analysis on the available resource devices to obtain a plurality of resource device combinations and a total latency cost of each resource device combination; and
selecting a resource device combination of the plurality of resource device combinations based on the total latency cost of each resource device combination, wherein the resource device combination comprises a second plurality of resource devices and wherein each of the second plurality of resource devices is one of the plurality of resource devices.

### Claim 16 (depends on 15)

The system of claim 15, the method further comprising:
allocating the second plurality of resource devices based on the selecting; and
updating a resource allocation master list based on the allocating.

### Claim 17 (depends on 15)

The system of claim 15, wherein performing the latency analysis comprises:
identifying the resource device combination;
identifying a latency cost of a pair of resource devices in the resource device combination; and
calculating a total latency cost of the resource device combination based at least on the latency cost of the pair of resource devices.

### Claim 18 (depends on 17)

The system of claim 17,
wherein each resource device in the pair of resource devices is directly connected to one of a plurality of switch fabrics, and
wherein the latency cost of the pair of resource devices is based on connections between the plurality of switch fabrics.

### Claim 19 (depends on 15)

The system of claim 15, wherein the second plurality of resource devices implement a workload.

### Claim 20 (depends on 15)

The system of claim 15, wherein selecting the resource device combination comprises:
identifying a lowest total latency cost; and
making a determination that the resource device combination is associated with the lowest total latency cost.
