# US 2021/0279149 A1 · Method and system for a rebuild of a workload in a composable infrastructure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0279149 A1
- Document ID: US20210279149A1
- Status: Published application
- Kind: A1
- Application number: 16/808,794
- Filed: 2020-03-04
- Published: 2021-09-09
- Earliest claimed: 2020-03-04
- Assignees: Dell Products L.P.
- Applicants: Dell Products L.P.
- Inventors: Rizwan Ali; Dharmesh M. Patel; Ravikanth Chaganti
- Web page: https://patentgrep.com/patent/US20210279149A1

## CPC

- G06F 11/20: using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
- G06F 11/2025: {using centralised failover control functionality}
- G06F 11/2028: {eliminating a faulty processor or activating a spare}
- G06F 11/3414: {Workload generation, e.g. scripts, playback}
- G06F 11/3495: {for systems}
- G06F 16/2379: {Updates performed during online database operations; commit processing}
- H04L 47/82: {Miscellaneous aspects}
- H04L 47/83: based on usage prediction
- G06F 11/2035: {without idle spare hardware}
- H04L 47/74: measures in reaction to resource unavailability
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method for managing data includes obtaining, by a management module, a resource device replacement request specifying a first resource device, in response to the resource device replacement request: updating a resource allocation master list to specify a failed status of the first resource device, selecting a second resource device using the resource allocation master list based on a standby status of the second resource device, updating a resource device entry associated with the second resource device to specify an in use status of the second resource device, and initiating a resource device replacement for the second resource device.

## Claims

### Claim 1

A method for managing data, the method comprising:
obtaining, by a management module, a resource device replacement request specifying a first resource device;
in response to the resource device replacement request:
updating a resource allocation master list to specify a failed status of the first resource device;
selecting a second resource device using the resource allocation master list based on a standby status of the second resource device;
updating a resource device entry associated with the second resource device to specify an in use status of the second resource device; and
initiating a resource device replacement for the second resource device.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first resource device and the second resource device are associated with an infrastructure persona.

### Claim 3 (depends on 2)

The method of claim 2,
wherein the first resource device is initially implementing a workload, and
wherein, after initiating the resource device replacement, the second resource device is implementing the workload.

### Claim 4 (depends on 3)

The method of claim 3, wherein initiating the resource device replacement comprises:
transitioning the second resource device to an operational state; and
after the second resource device is in an operational state, directing communication between other resource devices in the workload to second resource device.

### Claim 5 (depends on 1)

The method of claim 1, wherein the first resource device and the second resource device are processing devices.

### Claim 6 (depends on 1)

The method of claim 1, wherein the first resource device and the second resource device are storage devices.

### Claim 7 (depends on 1)

The method of claim 1, wherein the first resource device and the second resource device are network devices.

### Claim 8

A non-transitory computer readable medium comprising computer readable program code, which when executed by a computer processor enables the computer processor to perform a method for managing data, the method comprising:
obtaining, by a management module, a resource device replacement request specifying a first resource device;
in response to the resource device replacement request:
updating a resource allocation master list to specify a failed status of the first resource device;
selecting a second resource device using the resource allocation master list based on a standby status of the second resource device;
updating a resource device entry associated with the second resource device to specify an in use status of the second resource device; and
initiating a resource device replacement for the second resource device.

### Claim 9 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein the first resource device and the second resource device are associated with an infrastructure persona.

### Claim 10 (depends on 8)

The non-transitory computer readable medium of claim 8,
wherein the first resource device is initially implementing a workload, and
wherein, after initiating the resource device replacement, the second resource device is implementing the workload.

### Claim 11 (depends on 10)

The non-transitory computer readable medium of claim 10, wherein initiating the resource device replacement comprises:
transitioning the second resource device to an operational state; and
after the second resource device is in an operational state, directing communication between other resource devices in the workload to second resource device.

### Claim 12 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein the first resource device and the second resource device are processing devices.

### Claim 13 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein the first resource device and the second resource device are storage devices.

### Claim 14 (depends on 8)

The non-transitory computer readable medium of claim 8, wherein the first resource device and the second resource device are network devices.

### Claim 15

A system, comprising:
a processor; and
memory comprising instructions, which when executed by the processor, perform a method, the method comprising:
obtaining, by a management module, a resource device replacement request specifying a first resource device;
in response to the resource device replacement request:
updating a resource allocation master list to specify a failed status of the first resource device;
selecting a second resource device using the resource allocation master list based on a standby status of the second resource device;
updating a resource device entry associated with the second resource device to specify an in use status of the second resource device; and
initiating a resource device replacement for the second resource device.

### Claim 16 (depends on 15)

The system of claim 15, wherein the first resource device and the second resource device are associated with an infrastructure persona.

### Claim 17 (depends on 16)

The system of claim 16,
wherein the first resource device is initially implementing a workload, and
wherein, after initiating the resource device replacement, the second resource device is implementing the workload.

### Claim 18 (depends on 17)

The system of claim 17, wherein initiating the resource device replacement comprises:
transitioning the second resource device to an operational state; and
after the second resource device is in an operational state, directing communication between other resource devices in the workload to second resource device.

### Claim 19 (depends on 15)

The system of claim 15, wherein the first resource device and the second resource device are processing devices.

### Claim 20 (depends on 15)

The system of claim 15, wherein the first resource device and the second resource device are storage devices.