# US 2021/0278829 A1 · Systems and methods for maintaining equipment in an industrial automation environment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0278829 A1
- Document ID: US20210278829A1
- Status: Published application
- Kind: A1
- Application number: 17/331,230
- Filed: 2021-05-26
- Published: 2021-09-09
- Earliest claimed: 2015-03-27
- Assignees: Rockwell Automation Technologies, Inc.
- Applicants: Rockwell Automation Technologies, Inc.
- Inventors: Andrew Wilber; Jeromy Scott Humphrey; Michael James Lanphear
- Web page: https://patentgrep.com/patent/US20210278829A1

## CPC

- G05B 19/41875: {characterised by quality surveillance of production}
- G05B 2219/31316: Output test result report after testing, inspection
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A method for generating a report regarding prioritizations of industrial automation devices in an industrial system may include determining a first score for each of the industrial automation devices. The first score represents a relative importance of each of the industrial automation devices. The method may also include determining a second score for each of one or more parts of each of the industrial automation devices. The second score represents a relative importance of each of the parts with respect to each other. The method may also include generating the report comprising the parts, the industrial automation devices, the first score for each of the industrial automation devices, the second score for each of the parts, or any combination thereof, wherein the report is organized according to the first score, the second score, or based on a combination of the first score and the second score.

## Claims

### Claim 1

A method, comprising:
receiving, via a processor, a first set of identification information regarding the plurality of industrial automation devices from a computing device;
receiving, from one or more databases via the processor, a first set of information associated with the plurality of industrial automation devices based on the first set of identification information, wherein the first set of information comprises:
reliability information regarding each industrial automation device of the plurality of industrial automation devices;
life expectancy information regarding each industrial automation device of the plurality of industrial automation devices; and
a second set of identification information regarding each part of a set of parts of the plurality of industrial automation devices;
receiving, from the one or more databases via the processor, a second set of information associated with each part of the set of parts of the plurality of industrial automation devices based on the second set of identification information, wherein the second set of information comprises:
inventory information regarding each part of the set of parts; and
lifecycle information regarding each part of the set of parts;
determining, via the processor, a maintenance order of each part of the set of parts of the plurality of industrial automation devices based on the reliability information, the life expectancy information, the inventory information, and the lifecycle information, wherein the maintenance order comprises a listing of each part of the set of parts of the plurality of industrial automation devices according to a maintenance priority of each part of the set of parts; and
transmitting, to the computing device, an indication of one or more service recommendations based on the maintenance order.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first set of information comprises:
priority information regarding each industrial automation device of the plurality of industrial automation devices;
support information regarding each industrial automation device of the plurality of industrial automation devices;
expected down time information regarding each industrial automation device of the plurality of industrial automation devices;
expected mean time to repair information regarding each industrial automation device of the plurality of industrial automation devices;
process line information regarding each industrial automation device of the plurality of industrial automation devices; or
a combination thereof.

### Claim 3 (depends on 1)

The method of claim 1, wherein the second set of information comprises reparability information regarding each part of the set of parts, technical segment information regarding each part of the set of parts, or both.

### Claim 4 (depends on 1)

The method of claim 1, wherein the reliability information regarding each industrial automation device comprises historical maintenance data associated with the industrial automation device, a degree of reliability for the industrial automation device based on empirical data regarding a similar industrial automation device in a different industrial system and a maintenance record associated with the industrial automation device, downtime of the industrial automation device over a period of time; a review of the industrial automation device, or empirical data regarding the industrial automation device, or a combination thereof.

### Claim 5 (depends on 1)

The method of claim 1, wherein the life expectancy information comprises an estimated remaining service life of the industrial automation device.

### Claim 6 (depends on 5)

The method of claim 5, wherein the estimated remaining service life of the industrial automation device comprises a total amount of service time associated with the industrial automation device, an expected amount of service time before maintenance is performed on the industrial automation device, or both.

### Claim 7 (depends on 1)

The method of claim 1, wherein the inventory information comprises an availability of a replacement part for the part in an inventory associated with the industrial system.

### Claim 8 (depends on 1)

The method of claim 1, wherein the lifecycle information corresponds to a degree of manufacturer support available for a respective part.

### Claim 9 (depends on 1)

The method of claim 1, comprising:
generating, via the processor, a report including a listing of each industrial automation device of the plurality of industrial automation devices based on the maintenance priority of each part of the set of parts, and the listing of each part of the set of parts of the plurality of industrial automation devices in accordance with the maintenance priority of each part of the set of parts; and
transmitting, via the processor, the report to the computing device for display.

### Claim 10

A non-transitory computer-readable medium comprising computer-executable instructions for controlling one or more operations of one or more industrial automation devices in an industrial system, wherein the computer-executable instructions are configured to cause a processor to perform operations, comprising:
receiving, from one or more computing devices, reliability information regarding each industrial automation device of a plurality of industrial automation devices, life expectancy information regarding each industrial automation device of the plurality of industrial automation devices, inventory information regarding each part of a set of parts of the plurality of industrial automation devices, and lifecycle information regarding each part of the set of parts;
determining a maintenance order of each part of the set of parts of the plurality of industrial automation devices based on the reliability information, the life expectancy information, the inventory information, and the lifecycle information, wherein the maintenance order comprises a listing of each part of the set of parts of the plurality of industrial automation devices according to a maintenance priority of each part of the set of parts; and
transmitting, to the one or more computing devices, an indication of one or more service recommendations based on the maintenance order.

### Claim 11 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the operations comprise receiving, from the one or more computing devices, priority information regarding each industrial automation device of the plurality of industrial automation devices, support information regarding each industrial automation device of the plurality of industrial automation devices, expected down time information regarding each industrial automation device of the plurality of industrial automation devices, expected mean time to repair information regarding each industrial automation device of the plurality of industrial automation devices, process line information regarding each industrial automation device of the plurality of industrial automation devices, or a combination thereof.

### Claim 12 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the operations comprise receiving, from the one or more computing devices, reparability information regarding each part of the set of parts, technical segment information regarding each part of the set of parts, or both.

### Claim 13 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the reliability information regarding each industrial automation device comprises historical maintenance data associated with the industrial automation device, a degree of reliability for the industrial automation device based on a maintenance record associated with the industrial automation device, downtime of the industrial automation device over a period of time, a review of the industrial automation device, empirical data regarding the industrial automation device, or empirical data regarding a similar industrial automation device in a different industrial system, or a combination thereof.

### Claim 14 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the one or more service recommendations comprise a first recommendation to service one or more parts of the set of parts at a particular time and a second recommendation to service the one or more parts of the set of parts at one or more alternative times.

### Claim 15 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the one or more service recommendations comprise a first recommendation to maintain a number of replacement parts for a first part of the set of parts in an inventory associated with the industrial system, a second recommendation to relocate a second part of the set of parts to another location associated with the industrial system, or both.

### Claim 16 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the operations comprise:
generating a report including a listing of each industrial automation device of the plurality of industrial automation devices based on the maintenance priority of each part of the set of parts, and the listing of each part of the set of parts of the plurality of industrial automation devices in accordance with the maintenance priority of each part of the set of parts; and
transmitting the report to the one or more computing devices for display.

### Claim 17

A system, comprising:
a plurality of industrial automation devices; and
a computing device configured to perform operations comprising:
receiving, from one or more computing devices, reliability information regarding each industrial automation device of a plurality of industrial automation devices, life expectancy information regarding each industrial automation device of the plurality of industrial automation devices, inventory information regarding each part of a set of parts of the plurality of industrial automation devices, and lifecycle information regarding each part of the set of parts;
determining a maintenance order of each part of the set of parts of the plurality of industrial automation devices based on the reliability information, the life expectancy information, the inventory information, and the lifecycle information, wherein the maintenance order comprises a listing of each part of the set of parts of the plurality of industrial automation devices according to a maintenance priority of each part of the set of parts; and
generating a report including a listing of each industrial automation device of the plurality of industrial automation devices based on the maintenance priority of each part of the set of parts, and the listing of each part of the set of parts of the plurality of industrial automation devices in accordance with the maintenance priority of each part of the set of parts; and
transmitting the report to the one or more computing devices for display.

### Claim 18 (depends on 17)

The system of claim 17, wherein the operations comprise receiving, from the one or more computing devices, priority information regarding each industrial automation device of the plurality of industrial automation devices, support information regarding each industrial automation device of the plurality of industrial automation devices, expected down time information regarding each industrial automation device of the plurality of industrial automation devices, expected mean time to repair information regarding each industrial automation device of the plurality of industrial automation devices, process line information regarding each industrial automation device of the plurality of industrial automation devices, or a combination thereof.

### Claim 19 (depends on 17)

The system of claim 17, wherein the operations comprise receiving, from the one or more computing devices, reparability information regarding each part of the set of parts, technical segment information regarding each part of the set of parts, or both.

### Claim 20 (depends on 17)

The system of claim 17, wherein determining the maintenance order of each part of the set of parts comprises determining a relative maintenance importance of each part of the set of parts with respect to each other part of the set of parts based on respective weights attributed to the reliability information, the life expectancy information, the inventory information, and the lifecycle information.
