# US 2021/0278821 A1 · Dynamic fabrication engine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0278821 A1
- Document ID: US20210278821A1
- Status: Published application
- Kind: A1
- Application number: 17/150,996
- Filed: 2021-01-15
- Published: 2021-09-09
- Earliest claimed: 2018-08-01
- Assignees: X Development LLC
- Applicants: X Development LLC
- Inventors: Ytai Ben-Tsvi
- Web page: https://patentgrep.com/patent/US20210278821A1

## CPC

- G05B 19/4093: characterised by part programming, e.g. entry of geometrical information as taken from a technical drawing, combining this with machining and material information to obtain control information, named part program, for the NC machine
- G05B 19/4188: {characterised by CIM planning or realisation}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G06F 30/00: Computer-aided design [CAD]
- B25J 11/005: {Manipulators for mechanical processing tasks}
- E04G 21/14: Conveying or assembling building elements (roofing E04D; finishing work E04F)
- G05B 2219/35003: Kad kam knowledge aided design, knowledge aided manufacturing
- G05B 2219/35012: Cad cam
- G06F 16/9027: {Trees}
- G06F 2119/18: Manufacturability analysis or optimisation for manufacturability
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Systems, methods, devices, and other techniques for a dynamic fabrication system. In some implementations, a computing system obtains a digital model of a physical structure. A fabrication plan for the physical structure is generated. The fabrication plan is provided to a fabrication system to execute the automated fabrication procedure according to the fabrication plan. A set of operations are performed for each of at least a subset of tasks from a set of tasks executed by the fabrication system during an automated fabrication procedure to identify an adjusted fabrication plan. The fabrication system is directed to continue execution of the automated fabrication procedure according to the adjusted fabrication plan.

## Claims

### Claim 1

(canceled)

### Claim 2

A method comprising:
providing, by a computing system and to a fabrication system, a fabrication plan that defines a plurality of tasks in an automated fabrication procedure for execution by the fabrication system to fabricate a physical structure, wherein the fabrication plan is associated with one or more fabrication constraints that represent limitations on geometric relationships between a plurality of components of the physical structure;
evaluating, by the computing system and using execution data received from the fabrication system, execution of the fabrication plan with respect to the one or more fabrication constraints for the physical structure;
determining, after evaluating the fabrication plan using the execution data, that a geometric relationship between the plurality of components of the physical structure under fabrication does not comply with the one or more fabrication constraints of the fabrication plan;
in response, generating an alternative fabrication plan that adds a task to the fabrication plan, removes a task from the fabrication plan, or modifies a task of the fabrication plan; and
directing, by the computing system, the fabrication system to resume the fabrication of the physical structure using the generated alternative fabrication plan.

### Claim 3 (depends on 2)

The method of claim 2, wherein generating an alternative fabrication plan comprises:
evaluating a plurality of alternative fabrication plans; and
based on the evaluation of the plurality of alternative fabrication plans, selecting an alternative fabrication plan, wherein:
in the selected alternative fabrication plan, the geometric relationships between the plurality of components of the physical structure comply with the one or more fabrication constraints, and
the selected alternative fabrication plan has been generated by updating the plurality of tasks of the fabrication plan, comprising one or more of: adding a task to the fabrication plan, removing a task from the fabrication plan, or modifying a task of the fabrication plan.

### Claim 4 (depends on 2)

The method of claim 2, wherein the fabrication plan defines (i) task-level execution criteria and (ii) procedure-level execution criteria.

### Claim 5 (depends on 2)

The method of claim 2, wherein:
the fabrication plan specifies a respective precision level for each task in the plurality of tasks, and wherein the selected alternative fabrication plan comprises a first task having an adjusted precision level.

### Claim 6 (depends on 2)

The method of claim 2, wherein:
the fabrication plan specifies a sequence for executing the plurality of tasks during the automated fabrication procedure; and
the alternative fabrication plan adjusts the sequence for executing the plurality of tasks.

### Claim 7 (depends on 6)

The method of claim 6, wherein generating an alternative fabrication plan comprises:
identifying a subsequent task within the sequence for executing the plurality of tasks after a particular task; and
adjusting, based on the execution data, the sequence for executing the plurality of tasks such that the subsequent task is replaced with a different task.

### Claim 8 (depends on 6)

The method of claim 6, wherein generating an alternative fabrication plan comprises:
identifying a subsequent task within the sequence for executing the plurality of tasks after a particular task; and
adjusting, based on the execution data, task-level execution criteria for the subsequent task.

### Claim 9 (depends on 2)

The method of claim 2, wherein the fabrication constraints comprise target pose values for one or more components of the plurality of components of the physical structure after execution of a particular task of the plurality of tasks of the fabrication plan.

### Claim 10 (depends on 9)

The method of claim 9, wherein:
the execution data comprises actual pose values for the one or more components after the execution of the particular task; and
evaluating the execution of the fabrication plan comprises:
evaluating the actual pose values for the one or more components and the target pose values for the one or more components; and
determining a measure of compliance of the automated fabrication procedure with the fabrication constraints based on evaluating the actual pose values for the one or more components and the target pose values for the one or more components.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
determining, by the computing system, that the measure of compliance of the automated fabrication procedure with the fabrication constraints does not satisfy a threshold compliance measurement; and
determining, by the computing system, that execution of the particular task was not successful based on the determination that the measure of compliance of the automated fabrication procedure with the fabrication constraints does not satisfy the threshold compliance measurement.

### Claim 12 (depends on 2)

The method of claim 2, wherein the limitations on the geometric relationships between the plurality of components of the physical structure comprise limitations on one or more of (i) an arrangement of the plurality of components during execution of the fabrication plan or (ii) movement of the plurality of components during execution of the fabrication plan.

### Claim 13 (depends on 2)

The method of claim 2, further comprising:
computing, by the computing system and based on the execution data, a state representing a present configuration of the fabrication system after execution of a particular task; and
computing, by the computing system and based on the execution data, a state representing a progress of the automated fabrication procedure after execution of the particular task; and
determining to adjust the fabrication plan based on the state representing the present configuration of the fabrication system and the progression of the progress of the automated fabrication procedure.

### Claim 14 (depends on 13)

The method of claim 13, further comprising:
computing, by the computing system and based on the execution data, one or more heuristic indicators for a subsequent task to be executed after the particular task during the automated fabrication procedure; and
determining to adjust the fabrication plan based on the one or more heuristics indicators for the subsequent task.

### Claim 15 (depends on 14)

The method of claim 14, wherein the one or more heuristic indicators comprises a fitness metric for the subsequent task representing a likelihood that the subsequent task will be successfully executed based on the state representing the present configuration of the fabrication system.

### Claim 16 (depends on 2)

The method of claim 2, further comprising:
obtaining, by the computing system, a digital model of the physical structure, wherein the digital model identifies an arrangement of the plurality of components in the physical structure; and
generating, by the computing system and based on the digital model of the physical structure, the one or more fabrication constraints of the fabrication plan for the physical structure.

### Claim 17

A system comprising one or more computers and one or more storage devices storing instructions that are operable, when executed by the one or more computers, to cause the one or more computers to perform operations comprising:
providing, by a computing system and to a fabrication system, a fabrication plan that defines a plurality of tasks in an automated fabrication procedure for execution by the fabrication system to fabricate a physical structure, wherein the fabrication plan is associated with one or more fabrication constraints that represent limitations on geometric relationships between a plurality of components of the physical structure;
evaluating, by the computing system and using execution data received from the fabrication system, execution of the fabrication plan with respect to the one or more fabrication constraints for the physical structure;
determining, after evaluating the fabrication plan using the execution data, that a geometric relationship between the plurality of components of the physical structure under fabrication does not comply with the one or more fabrication constraints of the fabrication plan;
in response, generating an alternative fabrication plan that adds a task to the fabrication plan, removes a task from the fabrication plan, or modifies a task of the fabrication plan; and
directing, by the computing system, the fabrication system to resume the fabrication of the physical structure using the generated alternative fabrication plan.

### Claim 18 (depends on 17)

The system of claim 17, wherein generating an alternative fabrication plan comprises:
evaluating a plurality of alternative fabrication plans; and
based on the evaluation of the plurality of alternative fabrication plans, selecting an alternative fabrication plan, wherein:
in the selected alternative fabrication plan, the geometric relationships between the plurality of components of the physical structure comply with the one or more fabrication constraints, and
the selected alternative fabrication plan has been generated by updating the plurality of tasks of the fabrication plan, comprising one or more of: adding a task to the fabrication plan, removing a task from the fabrication plan, or modifying a task of the fabrication plan.

### Claim 19 (depends on 17)

The system of claim 17, wherein the limitations on the geometric relationships between the plurality of components of the physical structure comprise limitations on one or more of (i) an arrangement of the plurality of components during execution of the fabrication plan or (ii) movement of the plurality of components during execution of the fabrication plan.

### Claim 20

One or more non-transitory computer-readable storage media storing instructions that when executed by one or more computers cause the one or more computers to perform operations comprising:
providing, by a computing system and to a fabrication system, a fabrication plan that defines a plurality of tasks in an automated fabrication procedure for execution by the fabrication system to fabricate a physical structure, wherein the fabrication plan is associated with one or more fabrication constraints that represent limitations on geometric relationships between a plurality of components of the physical structure;
evaluating, by the computing system and using execution data received from the fabrication system, execution of the fabrication plan with respect to the one or more fabrication constraints for the physical structure;
determining, after evaluating the fabrication plan using the execution data, that a geometric relationship between the plurality of components of the physical structure under fabrication does not comply with the one or more fabrication constraints of the fabrication plan;
in response, generating an alternative fabrication plan that adds a task to the fabrication plan, removes a task from the fabrication plan, or modifies a task of the fabrication plan; and
directing, by the computing system, the fabrication system to resume the fabrication of the physical structure using the generated alternative fabrication plan.

### Claim 21 (depends on 20)

The non-transitory computer-readable storage media of claim 20, wherein generating an alternative fabrication plan comprises:
evaluating a plurality of alternative fabrication plans; and
based on the evaluation of the plurality of alternative fabrication plans, selecting an alternative fabrication plan, wherein:
in the selected alternative fabrication plan, the geometric relationships between the plurality of components of the physical structure comply with the one or more fabrication constraints, and
the selected alternative fabrication plan has been generated by updating the plurality of tasks of the fabrication plan, comprising one or more of: adding a task to the fabrication plan, removing a task from the fabrication plan, or modifying a task of the fabrication plan.