# US 2021/0277609 A1 · Screed assembly for road paving machines, and a method for repaving road surfaces

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0277609 A1
- Document ID: US20210277609A1
- Status: Published application
- Kind: A1
- Application number: 16/812,273
- Filed: 2020-03-07
- Published: 2021-09-09
- Earliest claimed: 2020-03-07
- Inventors: BRIAN GALLAGHER
- Web page: https://patentgrep.com/patent/US20210277609A1

## CPC

- E01C 19/1063: {Controlling the operations (E01C19/1068 takes precedence)}
- E01C 19/486: {with non-vibratory or non-percussive pressing or smoothing means; with supplemental elements penetrating the paving to work the material thereof}
- E01C 19/42: Machines for imparting a smooth finish to freshly-laid paving courses other than by rolling, tamping or vibrating (for distributing only E01C19/12; {hand-actuated smoothing tools E01C19/44})
- E01C 19/48: for laying-down the materials and consolidating them, or finishing the surface {, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ (E01C19/002, E01C23/065 take precedence; devices for guiding or controlling the machines along a predetermined path E01C19/004)}
- E01C 23/07: Apparatus combining measurement of the surface configuration of paving with application of material in proportion to the measured irregularities (measuring means only E01C23/01 {G01B})
- E01C 2301/14: Extendable screeds
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)

## Abstract

A new and improved method and apparatus for use in conjunction with the free floating paving screed used for road paving is disclosed. The method of forming a bituminous mixture into a smooth flat paved mat comprising some areas with a given nominal mat density and some selected areas with a predeterminedly higher mat density is described wherein problems posed by a reduced compaction ratio occurring subsequently to paving the mat where the roller drum bridges over recesses in the subbase are addressed. The modified paving screed described employs a new adjustable screed plate that allows localized areas of increased angle of attack and a device to increased material entry density in localized areas in front of a screed plate leading edge. Either method is used to create an increase in mat density in the desired area. The method and apparatus teach that by pairing differences in compaction ratio that inherently occur due to subbase irregularities with correspondingly predetermined and different mat densities in the paved mat, a good consistent final density can be achieved notwithstanding the limitations of the compaction rolling. A forward looking vision system is described that identifies subbase recesses, a digital controller quantifies the density increase required, and a GPS system maps locations where the mat density increases are to be applied.

## Claims

### Claim 1

A new and improved screed assembly for a road paving machine used for repaving a road surface with new paving material, comprising:
a plurality of screed segments disposed adjacent to each other in a horizontally extending array,
wherein each one of said plurality of screed segments is individually and independently movable within a vertical plane such that a lower, front edge portion of a particular screed segment can be vertically adjusted so as to alter its angle of attack and thereby predetermine the amount of new paving material which can pass under said lower, front edge portion of said particular screed segment in order to vary the amount of new paving material passing under said lower, front edge portion of said particular screed segment whereby the density of the new paving material comprising the newly paved road surface will substantially be constant regardless of ruts, tracks, depressions, or potholes present within the road surface being repaved.

### Claim 2 (depends on 1)

The new and improved screed assembly as set forth in claim 1, wherein:
said plurality of screed segments are pivotally mounted upon said screed assembly so as to achieve a predetermined angle of attack.

### Claim 3 (depends on 2)

The new and improved screed assembly as set forth in claim 2, wherein:
said plurality of screed segments are pivotally mounted at lower, read end portions upon said screed assembly so as to achieve said predetermined angle of attack.

### Claim 4 (depends on 1)

The new and improved screed assembly as set forth in claim 1, wherein:
each one of said plurality of screed segments has the configuration which is substantially that of a rectangular parallelepiped.

### Claim 5 (depends on 4)

The new and improved screed assembly as set forth in claim 4, wherein:
each one of said plurality of screed segments, having said configuration which is substantially that of a rectangular parallelepiped, is approximately six inches (6″) wide.

### Claim 6 (depends on 1)

The new and improved screed assembly as set forth in claim 1, further comprising:
a plurality of actuators operatively connected to each one of said plurality of screed segments for pivotally moving individual ones of said plurality of screed segments so as to achieve a predetermined angle of attack.

### Claim 7 (depends on 6)

The new and improved screed assembly as set forth in claim 6, wherein:
said plurality of actuators comprise pneumatic actuators.

### Claim 8 (depends on 6)

The new and improved screed assembly as set forth in claim 6, wherein:
said plurality of actuators comprise hydraulic piston-cylinder assemblies.

### Claim 9 (depends on 1)

The new and improved screed assembly as set forth in claim 1, further comprising:
a vision system for visually detecting the presence of ruts, tracks, depressions, or potholes within the road surface ahead of the screed assembly such that individual ones of said plurality of screed segments can have its angle of attack adjusted in order to predetermine the amount of new paving material which can pass under said lower, front edge portions of said individual ones of said plurality of screed segments which have had their angles of attack adjusted in order to vary the amount of new paving material passing under said lower, front edge portions of said adjusted screed segments whereby the density of the new paving material comprising the newly paved road surface will substantially be constant regardless of ruts, tracks, depressions, or potholes present within the road surface being repaved.

### Claim 10 (depends on 9)

The new and improved screed assembly as set forth in claim 9, wherein said vision system comprises:
a camera and a GPS system for detecting the presence and location of depressions, ruts, tracks, or potholes within the road surface being repaved;
a digital processor for using data from said gamer and GPS system for digitally mapping the dimensions and locations of the depressions, ruts, tracks, or potholes within the road surface being repaved;
a programmable logic controller (PLC) for outputting signals to control said individual ones of said plurality of screed segments; and
a plurality of solenoid-controlled valve for controlling fluid to actuators operatively connected to said individual ones of said plurality of screed segments in order to actuate said individual ones of said plurality of screed segments such that said individual ones of said plurality of screed segments will achieve their desired movements and angles of attack.

### Claim 11 (depends on 1)

The new and improved screed assembly as set forth in claim 1, wherein:
more than one of said plurality of screed segments may be actuated simultaneously.

### Claim 12

A new and improved road paving machine used for repaving a road surface with new paving material, and having a screed assembly mounted thereon, wherein said screed assembly comprises:
a plurality of screed segments disposed adjacent to each other in a horizontally extending array,
wherein each one of said plurality of screed segments is individually and independently movable within a vertical plane such that a lower, front edge portion of a particular screed segment can be vertically adjusted so as to alter its angle of attack and thereby predetermine the amount of new paving material which can pass under said lower, front edge portion of said particular screed segment in order to vary the amount of new paving material passing under said lower, front edge portion of said particular screed segment whereby the density of the new paving material comprising the newly paved road surface will substantially be constant regardless of ruts, tracks, depressions, or potholes present within the road surface being repaved.

### Claim 13 (depends on 12)

The new and improved paving machine as set forth in claim 12, wherein:
said plurality of screed segments are pivotally mounted upon said screed assembly so as to achieve a predetermined angle of attack.

### Claim 14 (depends on 13)

The new and improved paving machine as set forth in claim 13, wherein:
said plurality of screed segments are pivotally mounted at lower, read end portions upon said screed assembly so as to achieve said predetermined angle of attack.

### Claim 15 (depends on 12)

The new and improved paving machine as set forth in claim 12, wherein:
each one of said plurality of screed segments has the configuration which is substantially that of a rectangular parallelepiped.

### Claim 16 (depends on 15)

The new and improved paving machine as set forth in claim 15, wherein:
each one of said plurality of screed segments, having said configuration which is substantially that of a rectangular parallelepiped, is approximately six inches (6″) wide.

### Claim 17 (depends on 12)

The new and improved paving machine as set forth in claim 12, further comprising:
a plurality of actuators operatively connected to each one of said plurality of screed segments for pivotally moving individual ones of said plurality of screed segments so as to achieve a predetermined angle of attack.

### Claim 18 (depends on 17)

The new and improved paving machine as set forth in claim 17, wherein:
said plurality of actuators comprise pneumatic actuators.

### Claim 19 (depends on 17)

The new and improved paving machine as set forth in claim 17, wherein:
said plurality of actuators comprise hydraulic piston-cylinder assemblies.

### Claim 20 (depends on 12)

The new and improved paving machine as set forth in claim 12, further comprising:
a vision system for visually detecting the presence of ruts, tracks, depressions, or potholes within the road surface ahead of the screed assembly such that individual ones of said plurality of screed segments can have its angle of attack adjusted in order to predetermine the amount of new paving material which can pass under said lower, front edge portions of said individual ones of said plurality of screed segments which have had their angles of attack adjusted in order to vary the amount of new paving material passing under said lower, front edge portions of said adjusted screed segments whereby the density of the new paving material comprising the newly paved mat will be increased in the area of the ruts, tracks, depressions, or potholes present within the road surface being repaved.

### Claim 21 (depends on 20)

The new and improved screed assembly as set forth in claim 20, wherein said vision system comprises:
a camera and a GPS system for detecting the presence and location of depressions, ruts, tracks, or potholes within the road surface being repaved;
a digital processor for using data from said gamer and GPS system for digitally mapping the dimensions and locations of the depressions, ruts, tracks, or potholes within the road surface being repaved;
a programmable logic controller (PLC) for outputting signals to control said individual ones of said plurality of screed segments; and
a plurality of solenoid-controlled valve for controlling fluid to actuators operatively connected to said individual ones of said plurality of screed segments in order to actuate said individual ones of said plurality of screed segments such that said individual ones of said plurality of screed segments will achieve their desired movements and angles of attack.

### Claim 22 (depends on 12)

The new and improved screed assembly as set forth in claim 12, wherein:
more than one of said plurality of screed segments may be actuated simultaneously.

### Claim 23

A method of using a modified free floating paving screed that can apply a paved mat of different material densities, to pave a road surface which has planar areas and depressions located therewithin, comprising the steps of:
depositing roadway material onto the road surface to be repaved wherein a first predetermined material density of roadway material is deposited upon first areas of the road surface that do not have depressions located therewithin and wherein said areas are inherently accessible to effective compaction, and wherein a second predetermined material density of roadway material, greater than said first predetermined material density roadway material, is deposited upon second areas of the road surface that do have depressions located therewithin, wherein said areas inherently afford reduced accessibility to effective compaction compared to said first areas of the road surface that do not have depressions located therewithin; and
moving at least one roller over the road surface so as to compress and compact the roadway material comprising the first and second predetermined mat densities of roadway material respectively located upon the first areas of the road surface that do not have depressions located therewithin and the second areas of the road surface that have depressions located therewithin,
whereby the finalized compaction density of the roadway material, compressed and compacted onto the first and second areas of the road surface as a result of the roller moving over the first and second areas of the road surface will be uniform as a result of said second predetermined mat density of roadway material, which is greater than said first predetermined mat density of roadway material, said area of greater material density receiving a requisite increase in mass such that finalized compaction density is achieved irrespective of the inherent lesser effective compaction ratio that said area of road surface depression located therewithin will receive.

### Claim 24 (depends on 23)

The method as set forth in claim 23 above, wherein:
the topography of said first areas of the road surface are mostly planar, and the new road surface material applied thereon forms an additional depth of material above it and is substantially planar;
the topography of said second area of the road surface consists of a recess and the material applied thereon both fills said recess and similarly forms an additional depth of new material above it;
wherein the ability of a subsequent rolling operation to compact material of said first area and second area will be constrained by both the topography of the road and the dimensional characteristics of the roller drum such that the degree of compaction that can be applied will meet the requirements of the height of material and density of material over said first area, said degree of compaction being controlled by the first area, producing good final density therein;
wherein the degree of compaction applied as controlled by the first area will be insufficient to produce good final density over said second area due to the increased total height of material when using said density of material applied thereon; and
wherein laying a higher density mat over said second area only, the degree of compaction applied as controlled by the first area then becomes sufficient to achieve good final density in both the first and second areas of the new road surface.

### Claim 25 (depends on 23)

The method as set forth in claim 23, wherein:
the first and second predetermined densities of fresh roadway material are respectively deposited upon the first and second areas of the road surface by a screed assembly comprising a plurality of screed segments disposed adjacent to each other in a horizontally extending array, wherein each one of said plurality of screed segments is individually and independently movable within a vertical plane such that a lower, front edge portion of a particular screed segment can be vertically adjusted so as to alter its angle of attack and thereby predetermine the amount of fresh paving material which can pass under said lower, front edge portion of said particular screed segment in order to vary the amount of fresh paving material passing under said lower, front edge portion of said particular screed segment,
whereby the density of the newly paved mat comprising the repaved road surface will be increased over the ruts, tracks, depressions, or potholes present within the road surface being repaved.