# US 2021/0276839 A1 · Crane

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0276839 A1
- Document ID: US20210276839A1
- Status: Published application
- Kind: A1
- Application number: 17/258,009
- Filed: 2019-07-22
- Published: 2021-09-09
- Earliest claimed: 2018-07-31
- Assignees: Tadano Ltd.
- Applicants: Tadano Ltd.
- Inventors: Yoshimasa MINAMI
- Web page: https://patentgrep.com/patent/US20210276839A1

## CPC

- B66C 13/22: for electric drives (transmitting control pulses B66C13/40; systems or devices of general application H02P)
- B66C 23/06: with jibs mounted for jibbing or luffing movements
- B66C 13/063: {electrical}
- B66C 13/08: for depositing loads in desired attitudes or positions
- B66C 13/44: Electrical transmitters
- B66C 13/46: Position indicators for suspended loads or for crane elements
- B66C 23/42: with jibs of adjustable configuration, e.g. foldable
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)

## Abstract

A target trajectory signal is calculated by integrating a target speed signal inputted from a suspended-load moving operation tool and passing the integrated signal through a lowpass filter. Target position coordinates of a load are calculated from the target trajectory signal. The current position coordinates of a leading end of a boom are calculated from the attitude of a crane device. An unwinding amount of a wire rope is calculated from the current position coordinates of the load and the current position coordinates of the boom. A direction vector of the wire rope is calculated from the current position coordinates of the load and the target position coordinates of the load. Target position coordinates of the boom are calculated from the unwinding amount and the direction vector. An actuation signal of an actuator is generated from the target position coordinates of the boom.

## Claims

### Claim 1

A crane in which an actuator is controlled based on a target speed signal relating to a moving direction and a speed of a load suspended by a wire rope supported by a boom, the crane comprising:
a manipulation tool with which the speed and the moving direction of the load for the target speed signal are input; and
control circuitry that is configured to generate an operation signal for the actuator based on the target speed signal;
wherein the control circuitry is configured to
compute a target course signal by integrating the target speed signal input from the manipulation tool and attenuating a frequency component in a predetermined frequency range via a filter expressed by Expression 1,
compute a target position of the load relative to the reference position based on the target course signal,
compute a current position of a boom tip relative to the reference position based on a swivel angle of the boom, a luffing angle of the boom, and an extension/retraction length of the boom,
compute a let-out amount of the wire rope based on the current position of the load and the current position of the boom tip,
compute a direction vector of the wire rope based on the current position of the load and the target position of the load,
compute a target position of the boom tip for the target position of the load based on the let-out amount of the wire rope and the direction vector of the wire rope, and
generate an operation signal for the actuator based on the target position of the boom tip,
(
Expression
⁢
⁢
1
)
G
⁡
(
s
)
=
a
(
s
+
b
)
c
(
1
)
where each of a and b is a coefficient, c is an index and s is a differentiation element.

### Claim 2 (depends on 1)

The crane according to claim 1, wherein coefficient a, coefficient b and index c in Expression 1 are determined based on a settling time and the speed of the load in the target speed signal.

### Claim 3 (depends on 1)

The crane according to claim 1, wherein coefficient a, coefficient b and index c in Expression 1 is determined based on the current position of the boom tip.

### Claim 4 (depends on 2)

The crane according to claim 2, comprising a database in which coefficient a, coefficient b and index c are set for each predetermined condition, wherein coefficient a, coefficient b and index c corresponding to an arbitrary condition are selected from the database.
