# US 2021/0275712 A1 · Waste bin odor control method and system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2021/0275712 A1
- Document ID: US20210275712A1
- Status: Published application
- Kind: A1
- Application number: 16/609,991
- Filed: 2019-03-14
- Published: 2021-09-09
- Earliest claimed: 2018-03-14
- Assignees: IPL Inc.
- Applicants: Ipl Inc.
- Inventors: JEAN-GABRIEL LABRECQUE; YVAN MARCOUX
- Web page: https://patentgrep.com/patent/US20210275712A1

## CPC

- A61L 9/01: Deodorant compositions {(compositions released by contact with a liquid A61L9/05)}
- A61L 9/04: using substances evaporated in the air without heating
- B65F 1/14: Other constructional features; {Accessories}(holders or carriers for hand articles A45F5/00; fastening devices E05C)
- A61L 2209/15: Supporting means, e.g. stands, hooks, holes for hanging
- B65F 2210/129: Deodorizing means
- A61L: METHODS OR APPARATUS FOR STERILISING MATERIALS OR OBJECTS IN GENERAL; DISINFECTION, STERILISATION OR DEODORISATION OF AIR; CHEMICAL ASPECTS OF BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES; MATERIALS FOR BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES (preservation of bodies or disinfecting characterised by the agents employed A01N; preserving, e.g. sterilising, food or foodstuffs A23; preparations for medical, dental or toiletry purposes A61K)
- B65F: GATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE (disinfecting refuse A61L; refuse disintegrators B02C; sorting refuse B03B; B07B; handcarts for transporting refuse receptacles B62B; sack holders B65B67/00; converting refuse into fertilisers C05F; converting refuse into solid fuels C10L; sewers, cesspools E03F; arrangements in buildings for the disposal of refuse E04F17/10; refuse-consuming furnaces F23G; {for surgical articles A61B50/36})

## Abstract

A method for making a waste bin odor-controlling pad configured to be hung within the waste bin by a connector, comprising providing a mold; providing a connector; positioning a first length of the connector within a mold at a predetermined position within the mold, while keeping a second length of the connector outside the mold; and pouring an active material within the mold; the predetermined position within the mold being selected based on the geometry of the pad to be made.

## Claims

### Claim 1

A method for making a waste bin odor-controlling pad configured to be hung within the waste bin by a connector, comprising:
a) providing a mold;
b) providing a connector;
c) positioning a first length of the connector within a mold at a predetermined position within the mold, while keeping a second length of the connector outside the mold; and
d) pouring an active material within the mold;
said step d) being performed before or after said step c);
the predetermined position within the mold being selected based on at least one of: i) a thickness and ii) a surface area of the pad.

### Claim 2 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold.

### Claim 3 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold.

### Claim 4 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, the anchor comprising circumferential recesses, said securing the at least one part of the loop to the anchor comprising threading a length of the connector about the circumferential recesses.

### Claim 5 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said securing the at least one part of the loop to the anchor comprising one of: i) gluing, ii) sewing and iii) clipping the at least one part of the loop to the anchor.

### Claim 6 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said securing the at least one part of the loop to the anchor comprising defining the at least one part of the loop by stoppers, said step d) of positioning the at least one part of the loop within the mold comprising positioning the anchor at the predetermined position within the mold with the stoppers positioned in a position below the anchor.

### Claim 7 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising removably fitting the anchor to a jig, and positioning the jig thus supporting the anchor supporting the at least one part of the loop on a first side thereof relative to the mold in such a way that the anchored at least one part of the loop is positioned at the predetermined position within the mold.

### Claim 8 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising removably fitting the anchor to a jig, and positioning the jig thus supporting the anchor supporting the at least one part of the loop on a first side thereof relative to the mold in such a way that the anchored at least one part of the loop is positioned at the predetermined position within the mold, and wherein the anchor is removably fitted to the jig by at least one of male/female elements.

### Claim 9 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising removably fitting the anchor to a jig, and positioning the jig thus supporting the anchor supporting the at least one part of the loop on a first side thereof relative to the mold in such a way that the anchored at least one part of the loop is positioned at the predetermined position within the mold, and wherein the anchor comprises an opening and the jig comprises a fitting male element.

### Claim 10 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising removably fitting the anchor to a jig, and positioning the jig thus supporting the anchor supporting the at least one part of the loop on a first side thereof relative to the mold in such a way that the anchored at least one part of the loop is positioned at the predetermined position within the mold, and wherein the jig supports the anchor supporting the at least one part of the loop within the active material and guiding the remaining length of connector out of the mold during solidification of the active material.

### Claim 11 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising removably fitting the anchor to a jig, and positioning the jig thus supporting the anchor supporting the at least one part of the loop on a first side thereof relative to the mold in such a way that the anchored at least one part of the loop is positioned at the predetermined position within the mold, the method further comprising pouring the active material within the mold, and retrieving the jig from the mold after solidification of the active material about the anchor supporting the at least one part of a loop.

### Claim 12 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising fitting the anchor to a wall of the mold.

### Claim 13 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising fitting the anchor to a wall of the mold, and wherein the anchor is removably fitted to a base wall of the mold by at least one of male/female elements.

### Claim 14 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, said positioning the anchor at the predetermined position within the mold comprising fitting the anchor to a wall of the mold, wherein the anchor is removably fitted to a base wall of the mold by at least one of male/female elements, and wherein the wall of the mold supports the anchor supporting the at least one part of the loop within the active material and guiding the remaining length of connector out of the mold during solidification of the active material.

### Claim 15 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, and wherein said positioning the anchor at the predetermined position within the mold comprises fitting the anchor to a cover.

### Claim 16

(canceled)

### Claim 17 (depends on 1)

The method of claim 1, wherein said step c) comprises forming at least one part of a loop of the connector; and positioning the at least one part of the loop within the mold at the predetermined position within the mold, while keeping the second length of the connector outside the mold, securing the at least one part of the loop to an anchor and positioning the anchor at the predetermined position within the mold, wherein said positioning the anchor at the predetermined position within the mold comprises fitting the anchor to a cover and wherein the cover supports the anchor supporting the at least one part of the loop within the active material during solidification of the active material.

### Claim 18 (depends on 1)

The method of claim 1, wherein said step c) comprises securing the first length of the connector to one of: i) a jig; ii) a wall of the mold, and iii) a cover of the mold, and guiding the second length of connector outside the mold.

### Claim 19

A method for making a waste bin odor-controlling pad configured to be hung within the waste bin by a connector, comprising solidifying a liquid odor-controlling material with a first length of connector embedded therein and a second length of connector extending from an outer position of the pad for hanging of the pad to a bin, in a mold, wherein the first length of connector is spread by and secured within the liquid odor-controlling material at a predetermined position within the liquid odor-controlling material during pouring and solidification of the liquid odor-controlling material by at least one of: i) a jig; ii) a wall of the mold, and iii) a cover of the mold.

### Claim 20

A method for controlling odor within a waste bin, comprising solidifying a liquid odor-controlling material with an first length of connector embedded therein and a second length of connector extending out of the liquid odor-controlling material, wherein the first length of connector is spread by and secured within the liquid odor-controlling material at a predetermined position within the liquid odor-controlling material during pouring and solidification of the liquid odor-controlling material into a pad, and hanging the pad within the waste bin by the second length of connector, while the first length of connector embedded within the bulk of the pad is locked within the bulk of the pad, thereby preventing tearing off therefrom under the weight of the pad and/or of items hitting the pad on their way in and out of the waste bin.

### Claim 21 (depends on 20)

The method of claim 20, wherein the first length of connector is positioned at the predetermined position within the liquid odor-controlling material by one of: i) a jig; ii) a wall of the mold; and iii) a cover of the mold.

### Claim 22

(canceled)
